HomeMy WebLinkAbout10-00500017- 00075329 STAFF REVIEW COMMENTS NO. 1
Project: CASTLE ROCK PH 5 (FP) —10- 00500017
PLANNING
1. Please revise the Information Sheet to show the correct lot numbers.
a. The Information Sheet you provided with you application states that the approves
Preliminary Plat for this subdivision shoes Phase 5 having 29 lots. However, the
revised Preliminary Plat approved in February 2009, shows 28 lots in Phase 5.
The additional lot created with this Final Plat increases the total Tots for this
phase to 29.
The Information Sheet has been revised and is attached.
2. Please include a note that is similar to the last paragraph of the Information Sheet detailing
which Tots do not meet the R -1 zoning requirements as allowed by the approved Meritorious
Modifications for this PDD Zoning District.
a. Specifically, the note should state the number of lots in each phase that did not
meet the R -1 requirements.
Note 4. C. has been added to the Final Plat.
3. A temporary turnaround is required at the end of Rock Bend Drive for Sanitation services.
a. An Easement Dedication Sheet and all necessary attachments must be
submitted for review prior to the final plat being scheduled for a P&Z meeting
b. The Temporary Turnaround Easement must be filed at the courthouse and the
recording information included on the Final Plat prior to the plat being filed at the
courthouse.
Wallace Phillips has met with the Sanitation Department and the temporary tumaround will
not be required.
4. Please note that you may be required to submit paid tax certificates if they are not current
prior to the filing of your plat.
Noted.
5. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on you
plans. Any additional changes on these plans that the City has not been made aware of will
constitute a completely new review.
Noted.
6. The construction documents and reports are still under review and may affect the plat.
Noted.
ENGINEERING COMMENTS NO. 1
1. Please label the property to the east of this development with ownership information.
The property ownership information has been added to the plat.
2. The preliminary plat shows a street named "Rocky Oak Ct." Please revise on the final plat
to match.
The street name will be changed to "Rocky Oak Court" on the construction drawings.
3. Please verify that the water and wastewater lines are at least 3 -ft longitudinally from other
utilities. This may require that easements be widened.
Changes were made to the sanitary sewer lines to meet this requirement. These changes
required the easements at the front of Lots 26 -29, Block 1 and Lots 15-18, Block 3 to be
widened to 10'.
4. Engineering documents are still under review and may affect the final plat.
Noted.
Hanle Engineering Company
P.O. Box 11995
College Station, Texas 77842
979.764.3900 office
979.764.3910
979.436.1559 mobile
March 12, 2010
Matthew Hilgemeier
Staff Planner
City of College Station
1101 Texas Avenue
College Station, TX 77840
Re: Castle Rock Phase 5— Final Plat
Dear Mr. Hilgemeier:
Upon addressing the engineering comments for the construction drawings for Phase 5, we had to revise the
easements on Block 1, Lots 30 & 31. Attached is one revised copy of the Final Plat.
If you have any questions, please do not hesitate to call.
Very truly yours,
Harle Engineering Company
Joe Sc / Itz, P.E.
1/1446.;4_,
Civil E • ineer