MEMORANDUM
August 9, 2010
TO: RME Consulting Engineers (c /o Rabon Metcalf) via fax 764.0704
FROM: Matt Robinson, Staff Planner
SUBJECT: 1602 PARK PLACE (FP- REPLAT) - Final Plat.
Staff reviewed the above - mentioned final plat as requested. The following page is a list
of staff review comments detailing items that need to be addressed. If all comments
have been addressed and the following information submitted by Monday, August 16th,
10:00 a.m., your project will be placed on the next available Planning and Zoning
Commission meeting scheduled for, September 2nd, 7 :00 p.m. in the City Hall Council
Chambers, 1101 Texas Avenue.
v' One (1) 24 "x36" copy of the revised final plat;
y Nineteen (19) 11 "x17" copies of the revised final plat;
O K Parkland Dedication in the amount of $2,021 must be submitted prior to
the filing of the final plat:
One (1) Mylar original of the revised final plat (required after P &Z
approval); and
One (1) copy of the digital file of the final plat on diskette or e-mail to:
P&DS_Digital_Submittal@cstx.gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project
will be considered formally filed with the City of College Station. Please note that if all
comments have not been addressed your project will not be Scheduled for a Planning &
Zoning Commission meeting. Your project may be placed on a future agenda once all
the revisions have been made and the appropriate fees paid. Once your item has been
scheduled for the P &Z meeting, the agenda and staff report can be accessed at the
following web site on Monday the_week of the P &Z meeting.
http://www.cstx.gov/pz
If you have any questions or need additional information, please call me at
979.764.3570.
Attachments: Staff review comments
cc: Pamela Chmelar, pchmelarrf- mail.tamu.edu
Case file #10- 00500160
STAFF REVIEW COMMENTS NO. 1
Project: 1602 PARK PLACE (FP- REPLAT) - 10- 00500160
PLANNING
41 Please correct the scales. The drawing appears to be drawn at 1" = 20'
Remove property owner information under the Certificate of Ownership and
Dedication. Pamela Chmelar is shown to be the current property owner.
What is the dashed line behind the property owner description on Lot 18R1? reconcile the variance request information regarding lot width. They vary from
what is shown on the drawing to what is described in the request. Provide a copy of
the average lot width calculation. .)15`r ; Nitt) . C7A�C.t�tr. -v
Revise the Certificate of Ownership and Dedication to read "Lots 18R3 and 18R4,
Block 1, F.S. Kapchinski Subdivision ",
..its an FYI, parkland dedication will only be required for the newly created to - ` S- _ .
Remove structures, parking layout, driveways etc from the "Original Plat'
!'Provide a note stating that development or redevelopment of lot 18R3 or 18R4 will
require that both lots come into compliance with required building setbacks. 5p__ Ze, 14tG2
9. Please note that any changes made to the plans, that have not been requested by
V- the City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that the City has not
been made aware of will constitute a completely new review.
10. Please note that you may be required to submit paid tax certificates if they are not
Cpl-. current prior to the filing of your plat.
Reviewed by: Matt Robinson Date: 8/9/10
ENGINEERING COMMENTS NO. 1
pV There is a significant amount of fall from the street (Boardwalk Ct.) to and across the
proposed lot 18R4. With the presumable construction of a home on Lot 18R4 how
will grading and drainage be handled in order to assure that the existing adjacent
structures will not be adversely affected. A note needs to be added to the plat to
address this concern. S Se, Ni rtv *'t c
GYHow will lot 18R4 sewer? - S<-,�y� fi --c fix Co S.S. of.t *..- N?.OWPcc - K,,
'Was development of the proposed lot taken into consideration with your latest
drainage report for the development of Boardwalk Ct?
Reviewed by: Josh Norton Date: August 5, 2010
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. All easements on site are existing. Electric facilities will be designed within existing
easements.
2. Developer may be responsible for locating easements on site to insure that electrical
infrastructure is installed within easement boundaries.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser.
4. Developer will intercept existing conduit at designated transformers or other existing
devices and extend as required.
5. If conduit does not exist at designated transformer or other existing devices,
developer will furnish and install conduit as shown on CSU electrical layout.
6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc)
per CSU specs and design.
7. Developer installs pull boxes and secondary pedestals per CSU specs and design
(pull boxes and secondary pedestals provided by CSU).
8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan.
Email to:
gmartinez(ucstx.gov.
9. Developer provides load data to CSU as soon as it is available to avoid construction
delays. Delivery time for transformers not in stock is approximately 40 weeks.
10. Final site plan must show all proposed electrical facilities necessary to provide
electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and
conduit routing as designed by CSU.
11. To discuss any of the above electrical comments please contact Gilbert Martinez at
979.764.6255.
Reviewed by: Gilbert Martinez Date: 08.05.2010
GREENWAYS
1. No comments
Reviewed by: Venessa Garza Date: August 3, 2010