Loading...
HomeMy WebLinkAboutStaff Review Comments STAFF REVIEW COMMENTS No. 2 Project: LIVING HOPE BAPTIST CHURCH (CUP)- CONDITIONAL USE PERMIT (0 -206) PLANNING 1 -4. Ok 5 -6. Is an easement existing for these proposed utilities (water meter, underground electrical) that are shown to be on the Fire Station property? Please show the easement on the site plan, or one will need to be dedicated. 7. Ok 8. Show fire department connections for the fire sprinkler system. 9 -10. Ok 11. The existing concrete slab encroaches into the 15' building rear setback by 3 feet. Slabs may encroach the setback, however any type of structure requiring a building permit, (100 sq. ft. or larger), may not encroach into the setback area. 12 -21. Ok 22. Include fire lane note on the parking plan. Fire lanes are to be marked in accordance with city ordinance specifications, Chapter 6 Section 1(B)(4) subsection 602.6.8(a) City of College Station Code of Ordinances. Fire lanes must be an 8" red stripe painted on drive surface with 4" white letters stating "FIRE LANE NO PARKING TOW -AWAY ZONE." 23. Ok 24. Ok — 24' landscape reserve setback line only applies to property lines along road frontages. 25 -29. Ok Staff Review Comments Page 1 of 1 II New Comments: 30. May count all shrubs toward plant total. Counted many more shrubs that the 69 noted. Please amend the landscape table and point total. 31. I counted 17 Crepe Myrtles. 32. Will need to add parking screening in areas blocked by elevation level notations. 33. Two parking spaces adjacent to one of the enlarged end islands are not 9' wide. (Front set of parking nearest the building- facing the right side of the structure.) Reviewed by: SHAUNA A. LAAUWE Date: November 27, 2000 ENGINEERING 1. Please show all necessary cleanouts. 2. Your drainage report has been approved. Reviewed by: Thomas V. Vennochi Jr. Date: 11/30/00 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 2 of 1 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM November 14, 2000 TO: William Hutton, P. E., Via fax 690-7889 FROM: Bridgette George, Asst. Development Coordinator SUBJECT: Living Hope Baptist Churst - Conditional Use Permit Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Monday, November 27, 10:00 a.m. to be placed on the next available Planning and Zoning Commission meeting scheduled for December 7, 2000, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Ten (10) copies of the revised site plan; At* If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Butch Smith, 4170 S.H. 6 South, College Station, TX, 77845 Tod Branson, Via fax (281) 477-7633 Case file #00-206 Home of Texas A&M University MEMORANDUM March 29, 2001 TO: Carl Warren FROM: Tom Vennochi SUBJECT: Elevation Certificate for Living Hope Baptist Church Please be advised that upon a further investigation of the topography in the vacinity of Living Hope Baptist Church, in relation to Lick Creek, it has been determined that an Elevation Certificate is not necessary. A11160k STAFF REVIEW COMMENTS No. 1 Project: LIVING HOPE BAPTIST CHURCH (CUP)-CONDITIONAL USE PERMIT (0-206) NOTE TO FILE: Situation: The proposed development of the Drozd Subdivision has their driveway entrance approximately 50' from their shared property line with the Living Hope Baptist Church. The Living Hope driveway is 168' from this shared property line. The minimum distance to the adjacent driveway needs to be 275', ((168'+50')-275'= -57'). There is 345' to the fire house driveway to the south. Hence, they need approximately 57' more to the north and have 70', to the south, to play with to achieve the minimum 275' in accordance with our "Driveway Access Location and Design Policy", Ordinance #1971. Info: But, it appears that the location of this drive was approved previously in 1998, when the temporary structure and small concrete parking lot of Living Hope was developed (see archive file 98-705). Although I cannot find any previously submitted TXDOT driveway permit, Bridgette and Edwin believe it was approved. Conclusion: In light of the previous paragraph and the firehouse being an emergency response facility, I think the additional distance to the south and the shorter distance to the north to be acceptable although the letter of the Policy is not met. The added adjacent distance to the firehouse is an added measure of safety when emergency vehicles are active. Q Tom Vennochi PV at Nov. 13, 2000 / , CAA)" tX V - ' -4 10 i~ d JOB J~A dAA1 o~ ~x r t GP r P,P~- I STAFF REVIEW COMMENTS No. 2 Project: LIVING HOPE BAPTIST CHURCH (CUP)-CONDITIONAL USE PERMIT (0-206) PLANNING 1-4. Ok 5-6. Is an easement existing for these proposed utilities (water meter, underground electrical) that are shown to be on the Fire Station property? Please show the easement on the site plan, or one will need to be dedicated. She -shee lef 4. EEXi sriuv zo' Access k u "o-ITy aA-me AEuT. 7. Ok 8. Show fire department connections for the fire sprinkler system. SSF- "PDG't ~i +t mF 3~ltc.o~Go..►SN~gT2oP~. 9-10. Ok 11. The existing concrete slab encroaches into the 15' building rear setback by 3 feet. Slabs may encroach the setback, however any type of structure requiring a building permit, (100 sq. ft. or larger), may not encroach into the setback area. NoTEA. 12-21. Ok 22. Include fire lane note on the parking plan. Fire lanes are to be marked in accordance with city ordinance specifications, Chapter 6 Section 1(13)(4) subsection 602.6.8(a) City of College Station Code of Ordinances. Fire lanes must be an 8" red stripe painted on drive surface with 4° white letters stating "FIRE LANE NO PARKING TOW-AWAY ZONE." See '*`FiRE.LAme,5" cfe ®n SHatr Sofa. 23. Ok 24. Ok - 24' landscape reserve setback line only applies to property lines along road frontages. Notad 25-29. Ok Staff Review Comments Page 1 of 1 New Comments: 30. May count all shrubs toward plant total. Counted many more shrubs that the 69 noted. Please amend the landscape table and point total. TWDla. A nMVnenJf 4,+6 114C.lVCtQ q0 yaupon-b rind % 3 c.-¢pe M~rt ~s• 31. 1 counted 17 Crepe Myrtles. Raouaec-rc k's C-~ce V3%, •%as . 32. Will need to add parking screening in areas blocked by elevation level notations. ifkAeASEo, you pons AWIJ6 F4aaTAGE. seg s"W-Gi< 40 '4. 33. Two parking spaces adjacent to one of the enlarged end islands are not 9' wide. (Front set of parking nearest the building- facing the right side of the structure.) AIt 9ga v.%wo F,K~•Ep i v-Apped A rr q OD F_ Sea ShQ¢t %-~4. Reviewed by: SHAUNA A. LAAUWE Date: November 27, 2000 ENGINEERING 1. Please show all necessary cleanouts. C#-Lr-A"&urs s06wt4 oq .5oeat' Zo 4-. 2. Your drainage report has been approved. Reviewed by: Thomas V. Vennochi Jr. Date: 11/30/00 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 2 of 1 Wm. C. Hutton Consultants, Inc. 4809 Saint Andrews Drive College Station, Texas 77845 Tel. 979-690-7888 Fax 979-690-7889 email: wch@myriad.net PUBLIC UTILITY EASEMENT On the LIVING HOPE BAPTIST CHURCH 4.09 ACRE TRACT 4170 SOUTH STATE HIGHWAY 6 COLLEGE STATION, TX. 77845 According to the plat recorded in the ROBERT STEVENSON LEAGUE, Abstract 54, Volume 3881, Page 32 and 35, of the Deed Records of Brazos County Texas, I William C. Hutton Registered Professional Land Surveyor No. 2993 do hereby certify that the attached plat is true and correct and is based upon a 20 foot Public Utility Easement survey made by me on October 25, 2000, on the above named 4.09 acre tract. EASEMENT: Being a 20 foot Public Utility Easement located in all of that certain 4.09 tract or parcel of land, lying and being situated in the ROBERT STEVENSON LEAGUE, Abstract 54, College Station, Brazos County, Texas, and being a part of that 9.072 acre tract of land conveyed to Phillip G.E. Vanderckhove, Trustee, by Philip J. Tremont et al and recorded in Volume 603, page 49, Deed Records of Brazos County, Texas and being described as follows: COMMENCE: At a 1/2" rebar found at the east corner of the 4.09 acre tract, same being in the southwest right-of-way line of State Highway 6; THENCE: S 44040'36" W - 169.0 feet along the south tract line of the 4.09 acre tract and along and adjacent to the north tract line of the Shenandoah Phase One subdivision to the most southerly corner of this easement which is the PLACE OF BEGINING; THENCE: N 47°07'52" W - 126.0 feet along the southwest easement line to a point for a corner, THENCE: S 44°40'36" W - 47.0 feet along the easement line to a point for a corner, THENCE: N 47°07'52" W - 20.0 feet along the easement line to a point for a corner; THENCE: N 44°40'36" E - 47.0 feet along the easement line to a point for a corner, THENCE: N 47°07'52" W - 268.0 feet along the southwest easement line to a point for a corner, THENCE: N 44'18'02-" E - 20.0 feet along the north tract line of the 4.09 acre tract for the easement line to the most northerly point of this easement for a corner, THENCE: S 47°07'52" E - 414.1 feet along the northeast easement line to a point for corner, THENCE: S 44°40'36" W - 20.0 feet along the easement line to the PLACE OF BEGINNING for the southern ending of this Public Utility Easement. Wm. C. Hutton, RPLS No. 2993 STAFF REVIEW COMMENTS No. 1 Project: LIVING HOPE BAPTIST CHURCH (CUP)-CONDITIONAL USE PERMIT (0-206) PLANNING 1. Title block needs to include the name, number, and address of the applicant, developer/owner, and engineer. (City does not need the lender information on the site plan.) 2. Show ownership and zoning of parcel and all abutting parcels. 3. Give the distance of the adjacent drive to the north (not property line). 4. Also note the FEMA flood information note on the final grade and parking plan sheet. 5. Give more precise locations of electrical and utility easements. Plan needs to show clearly the location, width and length of the easements. 6. Where is your water meter to be located? 7. Show location of proposed or nearest fire hydrant on the parking plan sheet. Staff needs this information to ensure adequate access and fire protection. 8. Show fire department connections to the sprinkler system. 9. Note the gross square footage of the worship center on the parking plan. 10. Show the utility demands for the worship center. 11. Show all building setbacks on the parking plan. 12. Label a parking space with the typical dimension to represent the measurements of all spaces. 13. Designate number of parking spaces. Show parking calculations of required and proposed parking. 14. Show dimensions of handicap parking spaces. Will need to show a detail of the spaces and any sidewalk ramp that may be provided. 15. Label and dimension any proposed sidewalks. 16. Provide a 4' backing maneuver turnaround for dead-end parking aisles. Staff Review Comments Page 1 of 2 17. Site needs 544 square feet of interior parking islands. 82 interior parking spaces / 15 (180 sq.ft. of islands for every 15 spaces) = 5.466 X 180 sq.ft. = 984 sq.ft. of interior islands required One end island = 800 sq.ft. - 360 sq.ft. end island required = 440 sq.ft. excess to be counted towards the 984 sq.ft. = 544 sq.ft. of islands still needed. 18. Dimension drive aisle widths. 19. Indicate the driveway throat length. 20. Dimension distance from property line to parking lot pavement. Pavement may not be less than 6' from the property line. 21. Show dumpster location on the parking plan. Dumpster may not be visible from roadway. 22. Show fire lanes. Fire lanes are required if any portion of the proposed structure is more than 150 ft. from curb line. 23. To be awarded protected tree points for existing trees, the trees must be barricaded according to Section 11 of the Zoning Ordinance. Will need to also provide a barricade detail. 24. Show 24' Landscape Reserve Setback line. 25. Parking lot is not adequately screened. Front row parking must be screened with shrubbery or a berm of a minimum of 3 feet above parking lot elevation. 26. Canopy trees must be at least 20 feet from other canopy trees. Live Oaks must be at least 35 feet from other Live Oaks. (May want to substitute the Live Oaks for a different type of canopy tree.) 27.100% coverage of groundcover or grass is required in parking lot islands and in the 24' Landscape Reserve unless otherwise landscaped or existing plants are preserved. Parking islands must be either planted or treated with enhanced paving. Make a note on the plan indicating what type of groundcover will be used in nonpaved areas. 28. Clarify transformer location. 29. Transformer needs to be screened with vegetation. Reviewed by: Shauna A. Laauwe Date: November 10, 2000 Staff Review Comments Page 2 of 2 ENGINEERING 1. Is it necessary to propose a manhole at the Worship Center instead of a clean out? 2. Please annotate what type of material is to be used for the proposed 4" sewer. 3. Do you intend on having 45 degree bends in the sewer line? There is some permissible flexibility in PVC pipe. 4. A water meter is necessary where your proposed waterline ties into the existing 8" waterline. A public access easement is not necessary because the firehouse is city property. 5. Are you using the term 'FIRE PLUG' as synonymous with fire hydrant? Please use the term 'FIRE HYDRANT'. 6. Justify why your proposed underground electrical is extending into the Drozd Subdivision. 7. Please annotate the type and size of the existing driveway drainage pipe. Please clarify whether it is being replaced or not. 8. The applicant needs to satisfy the driveway requirements of the City of College Station according to our 'Driveway Access Location and Design Policy'. We then need to process a TXDOT Form 1058, (Permit to Construct Access Driveway Facilities on Highway Right of Way), to TXDOT. We need two originally signed driveway permits (Form 1058) for our files from them. Please send three additional copies of the 'Grade and Parking Plan' so we can forward to TXDOT. 9. Please identify your drainage areas (N1-N6, S1-S11) pictorially with boundaries. Please identify your North and South Retention Areas with boundaries. Please identify and annotate where you are placing concrete curbing. Please identify exactly where your curb cuts are at the northeast corner of the property. It appears you are using parking lot retention in curb and sump areas. Please identify those areas. Reviewed by: ELECTRICAL Thomas V. Vennochi Jr. Date: Nov. 14, 2000 1. No Comment Reviewed by: Jennifer Reeves Date: 11/9/00 Staff Review Comments Page 3 of 2 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. 2. Back Flow devises must be tested upon installation as per City Ordinance 2394. Reviewed by: Rob Werley NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 4 of 2 STAFF REVIEW COMMENTS No. 1 Project: LIVING HOPE BAPTIST CHURCH (CUP) -CONDITIONAL USE PERMIT (0-206) PLANNING 1. Title block needs to include the name, number, and address of the applicant, developer/owner, and engineer. (City does not need the lender information on the site plan.) 2. Show ownership and zoning of parcel and all abutting parcels. 3. Give the distance of the adjacent drive to the north (not property line). 4. Also note the FEMA flood information note on the final grade and parking plan sheet. 5. Give more precise locations of electrical and utility easements. Plan needs to show clearly the location, width and length of the easements. 6. Where is your water meter to be located? 7. Show location of proposed or nearest fire hydrant on the parking plan sheet. Staff needs this information to ensure adequate access and fire protection. 8. Show fire department connections to the sprinkler system. 9. Note the gross square footage of the worship center on the parking plan. 10. Show the utility demands for the worship center. 11. Show all building setbacks on the parking plan. 12. Label a parking space with the typical dimension to represent the measurements of all spaces. 13. Designate number of parking spaces. Show parking calculations of required and proposed parking. 14. Show dimensions of handicap parking spaces. Will need to show a detail of the spaces and any sidewalk ramp that may be provided. 15. Label and dimension any proposed sidewalks. 16. Provide a 4' backing maneuver turnaround for dead-end parking aisles. 17. Site needs 544 square feet of interior parking islands. Staff Review Comments Page 1 of 2 82 interior parking spaces / 15 (180 sq.ft. of islands for every 15 spaces) = 5.466 X 180 sq.ft. = 984 sq.ft. of interior islands required One end island = 800 sq.ft. — 360 sq.ft. end island required = 440 sq.ft. excess to be counted towards the 984 sq.ft. = 544 sq.ft. of islands still needed. 18. Dimension drive aisle widths. 19. Indicate the driveway throat length. 20. Dimension distance from property line to parking lot pavement. Pavement may not be less than 6' from the property line. 21. Show dumpster location on the parking plan. Dumpster may not be visible from roadway. 22. Show fire lanes. Fire lanes are required if any portion of the proposed structure is more than 150 ft. from curb line. 23.To be awarded protected tree points for existing trees, the trees must be barricaded according to Section 11 of the Zoning Ordinance. Will need to also provide a barricade detail. 24. Show 24' Landscape Reserve Setback line. 25. Parking lot is not adequately screened. Front row parking must be screened with shrubbery or a berm of a minimum of 3 feet above parking lot elevation. 26. Canopy trees must be at least 20 feet from other canopy trees. Live Oaks must be at least 35 feet from other Live Oaks. (May want to substitute the Live Oaks for a different type of canopy tree.) 27.100% coverage of groundcover or grass is required in parking lot islands and in the 24' Landscape Reserve unless otherwise landscaped or existing plants are preserved. Parking islands must be either planted or treated with enhanced paving. Make a note on the plan indicating what type of groundcover will be used in nonpaved areas. 28. Clarify transformer location. 29. Transformer needs to be screened with vegetation. Reviewed by: Shauna A. Laauwe Date: November 10, 2000 ENGINEERING Staff Review Comments Page 2 of 2 1. Is it necessary to propose a manhole at the Worship Center instead of a clean out? 2. Please annotate what type of material is to be used for the proposed 4" sewe r. 3. Do you intend on having 45 degree bends in the sewer line? There is some permissible flexibility in PVC pipe. 4. A water meter is necessary where your proposed waterline ties into the existing 8" waterline. A public access easement is not necessary because the firehouse is city property. 5. Are you using the term 'FIRE PLUG' as synonymous with fire hydrant? Please use the term 'FIRE HYDRANT'. 6. Justify why your proposed underground electrical is extending into the Drozd Subdivision. 7. Please annotate the type and size of the existing driveway drainage pipe. Please clarify whether it is being replaced or not. 8. The applicant needs to satisfy the driveway requirements of the City of College Station according to our 'Driveway Access Location and Design Policy'. We then need to process a TXDOT Form 1058, (Permit to Construct Access Driveway Facilities on Highway Right of Way), to TXDOT. We need two originally signed driveway permits (Form 1058) for our files from them. Please send three additional copies of the 'Grade and Parking Plan' so we can forward to TXDOT. 9. Please identify your drainage areas (N1 -N6, S1 -S11) pictorially with boundaries. Please identify your North and South Retention Areas with boundaries. Please identify and annotate where you are placing concrete curbing. Please identify exactly where your curb cuts are at the northeast corner of the property. It appears you are using parking lot retention in curb and sump areas. Please identify those areas. Reviewed by: ELECTRICAL 1. No Comment Reviewed by: Thomas V. Vennochi Jr Jennifer Reeves Date: Nov. 14. 2000 Date: 11/9/00 Staff Review Comments Page 3 of 2 LVA l I+.101 =I I Wel L1 =1611K 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. 2. Back Flow devises must be tested upon installation as per City Ordinance 2394. Reviewed by: Rob Werley NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 4 of 2