Loading...
HomeMy WebLinkAboutApplication (11-16) FOR OFFICE USE ONLY 11 CASE NO.: ` I v DATE SUBMITTED: l` CITY UP COLL.I=.G1; STATION TIME: ~3 Home of Texas ACW University' SITE PLAN APPLICATION STAFF: GENERAL' MINIMUM SUBMITTAL RE=QUIREMENTS: $932 Site Plan Application Fee.Cfrrl O,- 6'attE6E ST T-leA/ CAPiT/gt P90,FC7- $350 Non-Residential Architectural Standards Buildinry Review Application Fee (if applicable). AIYA $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 1 % of acceptable Engineer's Estimate for public infrcistructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). © Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. Fourteen (14) folded copies of site plan. One (1) folded copy of the landscape plan. One (1) copy of the following for Non-Residential Architectural Standards building review or Northgate Building Review (if applicable). ~]C Building elevations to scale for all buildings. A list of building materials for all facade and screening. Color samples for all buildings or list colors to be used from the approved color palette. ® Electronic copy of Site Plan e-mailed to csuelectdesign@cstx.gov. Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. Two (2) copies of the. Public infrastructure plans and supporting documents (if applicable). AP Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the proposed request (if applicable). The attached Site Plan Non-Residential Architectural Standards Building Review and Northgate Building Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not check off. Date of Optional Preapplication or Stormwater Management Conference 06. 4,2_010 NAME OF PROJECT ADDRESS LEGAL DESCRIPTION (Lot, Block, Subdivision) RFGro,2_/~~, ~gcr 71, Q' 4 APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name p4~A,220 41 E-mail f t /x~ cs x_ a cf/ Street Address ?j/Q XXE tEk 772qP City 6c4C(>,~5 Sr 7-1.1)A) State Zip Code -77R-jZ- Phone Number Fax Number 41-/rh PROPERTY OWNER'S INFORMATION: Name (17-Y G~ 6DCt E6- STAT/ON E-mail /f,.1A Street Address ?9(00 City c/L,,GE State '7_,X Zip Code 77942 Phone Number / 7 7 764-3V Fax Number A4 10/10 Page 1 of 10 0 0 CEFMFICATIOWS REQUIRED FOR ALL DEVELC)I-t&L-N Otevner Certification: 1. No wort; of any kind may start until a permit is issued. 2 The permit may be revoked if any false statements are made herein. 3 If revoked, all work must cease until permit is re-issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24, months of issuance. n Other permits may be required to fuliill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NCI and SkVPPP. If required, Elevation Certificates „vill be pro;•ide,l with eI_vationc cel ified during const-umi-nn (forms al pour) and po3i const l_!c;5on rJw'rfsr haret'i -)iveS tc' Ci !'2;✓r'3°'?"!i=tiJ'e-- i'_' +:lal:•s rCy~S.,li.Jhl'c Ir13!'_c.IC'ir, r'-ouire';1 f-- G4n itilr2.E". If, SiC'h7t 1= ;iril -J ','1 iS 1 f ii I' 11L Ir1~ t=ice 1,.9 E!'I It. ,C_ l l: )l_. , design sd art ~Jr l 'i(!_i; i; l "list in the cons-'i uciton ;s-q;iervS 41 pi oje 1. 110. In acco?dance with Ch_:pier 13 of the Code of Ordinances of the City of Coll ~e Station, rn-aaswes shall be talc. ; c• ins,-lie that all debits "tom c-onstructic-n, criosi_n_ a. id Seuiii i r i.cd.I r+ c!1! 'r~l be Cieposi.'ed in city Streets, 'Jr e;:isiing dlairla~--Je fac8i%ic5 All development shall be in acclfd,a,r,.e wiih the laps and ~,iiv f ' sp_. a.ions samitiLd to and approved by the City Engineer for the abo%,e named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11 The information and conclusions contained irs the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12 Release of plans to (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for consiruction is contingent on contractor signature on approved Development Permit 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND 7CURATE. Property Owner(s) fi t`~ c c f,; i r Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NO[ and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may require a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 4 I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. engineer Date 101,10 Page 3o(10 Cc The following CERTIFICATIONS apply to development in Special Flood Hazard Areas. Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only Permits:" A. I, rte' /'SUE 6:. b&,f a4 certify, as demonstrated in the attached drainage study, that the alterations or development covered by this permit, shall not: (i) increase the Base Flood elevation; (ii) create additional areas of Special Flood Hazard Area; (iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can Iso be approxinnaied to be either areas %-vithin 100 feet of the bo.inaary of the regulatory flood vay or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Flazard area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set fodh in the City of College Station Code of Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor (v) increase Base Flood velocities. beyond those areas exempted by ordinance in Section 5.11.3a of Chapter 13 Code of Ordinances. 7 Engineer Date Initial If a platting-status exemption to this requirement is asserted, provide written justification under separate letter in lieu of certification. Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits: B. I, SyE~IG~~! certify to the following: (i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm. 1401(1 Engineer Date Additional certification for Floodway Encroachments: C. I, 5MV 6- flue , certify that the construction, improvement, or fill covered by this permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments. Engineer Date 10/10 Page 4 of 10 ARCHITECT OR ENGINEER'S INFORMATION: CA 7-.x- 1~p6fllly? /T- E-mail Name Street Address t'REE/u I3. City AVS'rnA,) State Zip Code ~J09~ Phone Number 7/,3- j Z3 f~ D -7!? Fax Number OTHER CONTACTS (Please specify type of contact): Name &,Z/ E-mail Street Address City State Zip Code Phone Number Fax Number Current zoning R-14 Present use of property LoA)C_.6551Q1tt5 A! ti ZESTkoom_s &,Urt q1 pjn4~K Proposed use of property hSTDOn7?'~ E joi4L l"& Number of parking spaces required ./:Z® Number of parking spaces proposed 1762 Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? j Yes No MULTI-FAMILY RESIDENTIAL PARKLAND DEDICATION (Fees due prior to the issuance of a Building Permit) Total Acreage # of Multi-Family Dwelling Units Floodplain Acreage X$1646=$ Housing Units # of acres in floodplain # of 1 Bedroom Units # of acres in detention # of 2 Bedroom Units # of acres in greenways # of 3 Bedroom Units Date dedication approved by Parks & # of 4 Bedroom Units Recreation Advisory Board COMMERCIAL FOR 2 BEDROOM UNITS ONLY Total Acreage / fJc~Es # Bedrooms = 132 sq. ft. Building Square Feet 2 S~ # Bedrooms < 132 sq. ft. Floodplain Acreage * Projects that were vested prior to January 1, 2008, per Chapter 245 of the Texas Local Government Code may be assessed a different amount. Please contact city staff for additional information. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true and correct. ~,AAI V AP-k 26120& Signature and title SS/STf}N'T C~r~ EN6iN~ Date 10/10 Page 2 of 10