Loading...
HomeMy WebLinkAbout10-00500193- 00075022(*Or"" CITY OF COUFGI, STATION Home of Texx A&M University' FOR OFFMUSE CAS E NO.: ;5, 0 DATE SUBMITTED:-_ TIME: U STAFF: i64H 9' 8- /o (Check one) Minor ❑X Amending ❑ Final ❑ vacating ❑Replat e ($500.00) ($500.00) ($668.00) ($668.00) ($668.00) Is this plat in the ETJ? ❑ Yes 0 No Is this plat Commercial ❑ or Residential ❑X MINIMUM SUBMITTAL REQUIREMENTS: ❑X $500-$668 Final Plat Application Fee (see above). !V~❑ $167 Variance Request to Subdivision Regulations Fee (if applicable). IV;'❑ $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 0.75% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). ❑X Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. Please attach pages if additional information is provided. ❑X Fourteen (14) folded copies of plat. (A signed mylar original must be submitted after approval.) NA❑ Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. NIA Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). $1A❑ Notice of Intent (NOI) if disturbed area is greater than five (5) acres cumulatively. NIA ❑ Copy of original deed restrictions/covenants for replats (if applicable). ❑X Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate current within ninety (90) days. The report must include applicable information such as ownership, liens, encumbrances, etc. ❑x Paid tax certificates from City of College Station, Brazos County and College Station I.S.D. NIA ❑ Proof of parkland dedication consideration by the Parks & Recreation Board or Parks & Recreation Department (if applicable). ❑x The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not. NOTE: A mylar of the approved preliminary plat must be on file before a final plat application will be considered complete. If the mylar is submitted with the final plat application, it shall be considered a submittal for the preliminary plat project and processed and reviewed as such. Until the mylar has been confirmed by staff to be correct, the final plat application will be considered incomplete. Date of Optional Preapplication or Stormwater Management Conference N/A NAME OF PROJECT Castlegate Subdivision - Section 8 ADDRESS 4307 & 4309 Velencia Court SPECIFIED LOCATION OF PROPOSED PLAT: Castlegate Subdivision, Section 8 APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Wallace Phillips E-mail wallace.phillips@verizon.net Street Address 4490 Castlegate Drive City College Station Phone Number 979.690.7250 1/10 FINAL PLAT APPLICATION State TX Zip Code 77845 Fax Number 979.690.1041 Page 1 of 7 PROPERTY OWNER'S INFORMATION (ALL owners must be identified. Please attach an additional sheet for multiple owners): verizon.net Name Greens Prairie Investors, Ltd. E-mail waliace.phillips@verizon.net Address 4490 Castlegate Drive City College Station State TX Zip Code 77845 979.690.7250 Fax Number 979.690.1041 Phone Number ARCHITECT OR ENGINEER'S INFORMATION: Nam, Schultz Engineering, LLC Street Address 2730 Longmire Drive, Suite A City College Station Phone Number 979.764.3900 Do any deed restrictions or covenants exist for this property? Yes El No ❑x Is there a temporary blanket easement on this property? If so, please provide the Volume and Page No. Total Acreage 0.342 Existing Use Residential Total No. of Lots 1 Proposed Use Number of Lots By Zoning District 1 / PDD Average Acreage Of Each Residential Lot By Zoning District: 0.342 / PDD I Floodplain Acreage 0.0025 AC. Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? (X Yes r No A statement addressing any differences between the Final Plat and Preliminary Plat (if applicable): variance to subdivision regulations and reason for same Regarding the variance request, explain how: 1. There are special circumstances or conditions affecting the land involved such that strict application of the subdivision regulations will deprive the applicant of the reasonaoie use or ms iano. VIA nnrnaanrv fnr th, nremprvation and eniovment of a substantial property right of the applicant. VIA State 7X Zip Code 77845 Fax Number 979.764.3910 E-mail joeschultz84@verizon.net R-O-W Acreage N/A Residential / Page 2 of 7 1/10 3. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other property in the area, or to the City in administering subdivision regulations. 4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in accordance with the provisions of the Unified Development Ordinance. Requested Oversize Participation Total Linear Footage of Proposed Public: N/A Streets N/A Sidewalks N/A Sanitary Sewer Lines WA Water Lines N/A Channels N/A Storm Sewers N/A Bike Lanes I Paths Parkland Dedication due prior to filing the Final Plat: ACREAGE: N/A No. of acres to be dedicated + $ development fee N/A No. of acres in floodplain N/A No. of acres in detention N/A No. of acres in greenways OR FEE IN LIEU OF LAND: No. of SF Dwelling Units X $ _ $ (date) Approved by Parks & Recreation Advisory Board NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this Happlication and certifies that the facts stated herein IS APPLICATION IS FILED BY ANYONE OTHER nTHAN bTHE OWNER OF THE true, correct, and complete. IF T the PROPERTY this application must be ompanied the sin the appli ation or the power of attorney . If the ownereis of companythere is application on its the than one owner, all owners must g sentative to sign application must be accompanied by proof title report are also considered ownersreand the appropriate signatures must be behalf. LIEN HOLDERS identified in the provided as described above. Signature and title ` Date 9-;-10 Page 3 of 7 1/10 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re-issued. 4. Development shall not be used or occupied until aCertificate of Occupancy is months of issuance. issued. 5. The permit will expire if no significant work is progressing 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. proposed as part of this project, it shall be 9. If, stormwater mitigation is required, including detention ponds designed and constructed first in the construction sequence of the project. shall 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, emeasu d in res t eetse taken posi to insure that all debris from ° development shall be and accordance sedimentation cations submitted to with the pans and specif city existing drainage facilities. All livable codes and ordinances of the and approved by the City Engineer for the above named project. All of the app City of College Station shall apply. documents will comply with the 11. The information and conclusions contained in the attached plans and supporting current requirements of the City of College Station, Standard Cpetails~All evelopment has _been designed inked Design Guidelines Technical Specifications, accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release plans to (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY N ALL STATEMENTS HEREIN, AND IN TO THE BEST OF MY KNOWLEDGE, TRUE, ANDS FOR THE DEVELOPMENT PERMIT APPLICATIO ACCURATE. Ay Property Owner(s) Date Engineer Certification: ure that storrwater mitigation, including detention ponds, proposed as part . The project has been designed to ens 1 of the project will be constructed first in the constructions State and Federal Permits prior to construction. 2. 1 will obtain or can show compliance with all necessary with the ocuments comply 3. The information and conclusions y of College Station, Te ached plans and supporting City Code, Chapter 3dand associated BCS Unified current requirements of the City Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERM APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, RUE, AND ACCURATE. Engineer Date Page 2 of 4 1/10 The following CERTIFICATIONS apply to development in Special Flood Hazard Areas. Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only Permits:" A I certify, as demonstrated in the attached drainage study, that the alterations or development covered by this permit, shall not: (i) increase the Base Flood elevation; (ii) create additional areas of Special Flood Hazard Area; (iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor (v) increase Base Flood velocities. beyond those areas exempted by ordinance in Section 5.11.3a of Chapter 13 Code of Ordinances. Engineer Date Initial * If a platting-status exemption to this requirement is asserted, provide written justification under separate letter in lieu of certification. Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits: B I , certify to the following: (i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm. Engineer Additional certification for Floodway Encroachments: Date certify that the construction, improvement, or fill covered by this C I permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments. Engineer Date Page 3 of 4 1/10 Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate required). Residential Structures: D 1 certify that all new construction or any substantial improvement of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-pour) and post construction. Engineer / Surveyor Date Commercial Structures: E 1 certify that all new construction or any substantial improvement Flood Elevationest floor, including all of any commercial, industrial, or other evated at least' olne structure are foot above esigned to have the utilities, ductwork and basements o Engineer / Surveyor Date OR 1, 1 certify that the structure with its attendant utility, ductwork, basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities, ductwork, basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the hydrostatic and hydrodynamic conditions. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. Engineer / Surveyor Date Conditions or comments as part of approval: Print Form Page 4 of 4 1/10 FINAL PLAT MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: (Requirements based on Heid survey and marked by monuments and markers.) ❑X Drawn on 24" x 36" sheet to scale of 100' per inch. 0 Vicinity map which includes enough of surrounding area to show general location of subject property in relationship to College Station and its City Limits. No scale required but include north arrow. 0 Title Block with the following information: X❑ Name and address of subdivider, recorded owner, planner, engineer and surveyor. ❑X Proposed name of subdivision. (Subdivision name & street names will be approved through Brazos County 911.) ❑X Date of preparation. ❑ Engineer's scale in feet. ❑X Total area intended to be developed. ❑X North Arrow. ❑X Subdivision boundary indicated by heavy lines. N\ AR If more than 1 sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch or larger. X❑ All applicable certifications based on the type of final plat. ❑X Ownership and Dedication R Surveyor and/or Engineer ❑ City Engineer (and City Planner, if a minor plat) ❑X Planning and Zoning Commission (delete if minor plat) ❑X Brazos County Clerk ❑X Brazos County Commissioners Court Approval (ETJ Plats only) ❑X If submitting a replat where there are existing improvements, submit a survey of the subject property showing the improvements to ensure that no encroachments will be created. NlA ❑ If using private septic systems, add a general note on the plat that no private sewage facility may be installed on any lot in this subdivision without the issuance of a license by the Brazos County Health Unit under the provisions of the private facility regulations adopted by the Commissioner's Court of Brazos County, pursuant to the provisions of Section 21.084 of the Texas Water Code. ❑X Location of the 100-Year Floodplain and floodway, if applicable, according to the most recent available data. ❑X Lot corner markers and survey monuments (by symbol) and clearly tied to basic survey data. ❑X Matches the approved preliminary plat. 0 The location and description with accurate dimensions, bearings or deflection angles and radii, area, center angle, degree of curvature, tangent distance and length of all curves for all of the following: (Show existing items that are intersecting or contiguous with the boundary of or forming a boundary with the subdivision, as well as, those within the subdivision). Existing Proposed X❑ ❑ Streets. Continuous or end in a cul-de-sac, stubbed out streets must end into a temp turn around unless they are shorter than 100 feet. X❑ ❑ Public and private R.O.W. locations and widths. (All existing and proposed R.O.W.'s sufficient to meet Thoroughfare Plan.) ❑ ❑ Street offsets and/or intersection angles meet ordinance. Page 6 of 7 1/10 Existing Proposed 0 ❑ Alleys. 0 ❑ Easements. 0 ❑ A number or letter to identify each lot or site and each block (numbered sequentially). ❑X ❑ Parkland dedication/greenbelt area/park linkages. All proposed dedications must be reviewed by the Parks and Recreation Board and documentation of their recommendation provided prior to being scheduled for P & Z Commission consideration. It is the responsibility of the applicant to provide documentation from the Parks Department of the Board's recommendation. glAR Construction documents for all public infrastructure drawn on 24" x 36" sheets and properly sealed by a Licensed Texas Professional Engineer that include the following: ❑ Street, alley and sidewalk plans, profiles and sections. One sheet must show the overall street, alley and/or sidewalk layout of the subdivision. (may be combined with other utilities). ❑ Sewer Design Report. ❑ Sanitary sewer plan and profile showing depth and grades. One sheet must show the overall sewer layout of the subdivision. (Utilities of sufficient size/depth to meet the utility master plan and any future growth areas.) ❑ Water Design Report and/or Fire Flow Report. ❑ Water line plan showing fire hydrants, valves, etc. with plan and profile lines showing depth and grades. One sheet must show the overall water layout of the subdivision. (Utilities of sufficient size/depth to meet the utility master plan and any future growth areas.) ❑ Storm drainage system plan with contours, street profile, inlets, storm sewer and drainage channels, with profiles and sections. Drainage and runoff areas, and runoff based on 5, 10, 25, 50 and 100 year rain intensity. Detailed drainage structure design, channel lining design & detention if used. One sheet must show the overall drainage layout of the subdivision. ❑ Detailed cost estimates for all public infrastructure listed above sealed by Texas P.E. ❑ Drainage Report with a Technical Design Summary. ❑ Erosion Control Plan (must be included in construction plans). .41p❑ All off-site easements necessary for infrastructure construction must be shown on the final plat witha volume and page listed to indicate where the separate instrument easements were filed. Separate instrument easements must be executed prior to being scheduled for P&Z Commission consideration. ❑X Are there impact fees associated with this development? Z Yes ❑ No Impact fees must be paid prior to building permit. ❑X Will any construction occur in TxDOT rights-of-way? ❑ Yes ❑X No If yes, TxDOT permit must be submitted along with the construction documents. NOTE: 1. We will be requesting the corrected Final Plat to be submitted in digital form if available prior to filing the plat at the Courthouse. 2. If the construction area is greater than 5 acres, EPA Notice of Intent (NOI) must be submitted prior to issuance of a development permit. 1/10 Print Form Page 7 of 7