HomeMy WebLinkAboutApplication (11-10)(*O
CITY OP COI.LHGl: STATION
Home of 7cras A&m University'
FINAL PLAT APPLICATION
FOR OFFICE USE ONLY
CASE NO.: ' 1 4).
DATE SUBMITTED:
TIME: ''. O
STAFF:
(Check one) ❑ Minor ❑ Amending ❑X Final ❑ Vacating ❑ Replat
($700) ($700) ($932) ($932) ($932)
Is this plat in the ETJ? ❑ Yes ❑X No Is this plat Commercial ❑X or Residential ❑
MINIMUM SUBMITTAL REQUIREMENTS:
❑X $700 -$932 Final Plat Application Fee (see above).
-E5- $233 Variance Request to Subdivision Regulations Fee (if applicable).
-B- $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is
1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is
due prior to the issuance of any plans or development permit).
❑X Application completed in full. This application form provided by the City of College Station must be used and
may not be adjusted or altered. Please attach pages if additional information is provided.
0 Fourteen (14) folded copies of plat. (A signed mylar original must be submitted after approval.)
-8- Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
-� Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
-B- Copy of original deed restrictions /covenants for replats (if applicable).
❑X Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate
current within ninety (90) days. The report must include applicable information such as ownership, liens,
encumbrances, etc.
❑X Paid tax certificates from City of College Station, Brazos County and College Station I.S.D.
❑X The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not.
NOTE: A mylar of the approved preliminary plat must be on file before a final plat application will be considered
complete. If the mylar is submitted with the final plat application, it shall be considered a submittal for the
preliminary plat project and processed and reviewed as such. Until the mylar has been confirmed by staff
to be correct, the final plat application will be considered incomplete.
Date of Optional Preapplication or Stormwater Management Conference
NAME OF PROJECT Tow er Point Phase 12, Lots 1 -3, Block 2
ADDRESS Highway No. 6
SPECIFIED LOCATION OF PROPOSED PLAT:
(South corner of the intersection of Arrington Road and State Highway No. 6 1
APPLICANT /PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name Charles A. (Chuck) Ellison E -mail chuck @ellisonlaw.com
Street Address 302 Holleman Drive East, Suite 76
City College Stati
Phone Number 979-696 -9889
State TX Zip Code 77840
Fax Number 97 9- 693 -8819
10/10 Page 1 of 9
PROPERTY OWNER'S INFORMATION (All owners must be identified. Please attach an additional sheet for multiple
owners):
Name Colle S M a rk etp la ce, L.P. E -mail andyweiner @weinerdevelopment.com
Street Address 520 Post Oak Blvd. Suite 880
City Houston State TX Zip Code 77027
Phone Number 713 - 623 -0188 Fax Number 713- 623 -0178
ARCHITECT OR ENGINEER'S INFORMATION:
Name Kling Engineering & Surveying E -mail stewart@klingeng.com
Street Address 4101 S. Texas Ave. Suite A
City Bryan
Phone Number 979184616212
State TX Zip Code 77802
Fax Number 979184618252
Do any deed restrictions or covenants exist for this property? Yes ❑x No ❑
Is there a temporary blanket easement on this property? If so, please provide the Volume and Page No
Total Acreage 5.44 Total No. of Lots 3 R -O -W Acreage none
Existing Use vacant Proposed Use commercial /retail
Number of Lots By Zoning District 3 / C -1
Average Acreage Of Each Residential Lot By Zoning District:
n/a /
Floodplain Acreage none
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? F Yes R No
A statement addressing any differences between the Final Plat and Preliminary Plat (if annlirnhla�-
gone
requested variance to subdivision regulations and reason for same (if applicable):
one
Regarding the variance request, explain how:
1. There are special circumstances or conditions affecting the land involved such that strict application of the
subdivision regulations will deprive the applicant of the reasonable use of his land.
Va
2. The waiver is necessary for the preservation and enjoyment of a substantial Drobertv riaht of the annIirant
10/10 Page 2 of 9
3. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other
property in the area, or to the City in administering subdivision regulations.
4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in
accordance with the provisions of the Unified Development Ordinance.
Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable):
F_ An alternative pedestrian way or multi -use path has been or will be provided outside the right -of -way;
F The presence of unique or unusual topographic, vegetative, or other natural conditions exist so that strict
adherence to the sidewalk requirements of the UDO is not physically feasible or is not in keeping with the purposes
X 10" and goals of the UDO or the City's comprehensive Plan;
F A capital improvement project is imminent that will include construction of the required sidewalk. Imminent shall
mean the project is funded or projected to commence within twelve (12) months;
F The proposed development is within an older residential subdivision meeting the criteria in Platting and Replatting
within Older Residential Subdivisions Section of the UDO; or
F The proposed development contains frontage on a Freeway / Expressway as designated by Map 6.6, Thoroughfare
Plan - Functional Classification, in the City's Comprehensive Plan.
Detailed explanation of condition identified above:
n/a
NOTE: A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the
same time by the Planning & Zoning Commission.
10/10 Page 3 of 9
Requested Oversize Participation None
Total Linear Footage of
*k Proposed Public:
Streets
Sidewalks
Sanitary Sewer Lines
Water Lines
Channels
Storm Sewers
Bike Lanes I Paths
Par d Dedication due prior to filing the Final Plat:
ACREAGE:
No. of acres to edicated + $ development fee
No. of acres in floodplai
No. of acres in detention
No. of acres in greenways
OR
FEE IN LIEU OF LAND:
No. of SF Dwelling Units X $ _ $
(date) Approved by Parks & Recreation Advisory Board
NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are
true, correct, and complete. IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE
PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more
than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the
application must be accompanied by proof of authority for the company's representative to sign the application on its
behalf. LIEN HOLDERS identified in the title report are also considered owners and the appropriate signatures must be
provided as described above.
Si nature and title
/ - �T'��
Date
'Public infrastructure submitted separately by Walter P. Moore. See development permit for.applicable footage.
10110 Page 4 of 9
CERTIF'ICAT'IONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. - rho permit may be revoked if any false statements are made herein.
3. If revoked, all work must cease until permit is re issued.
4. Development shall not be used or occupied unlit a Certificate of Occupancy is issued.
5, The permit will expire if no significant work is progressing within 24 months of issuance.
8. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOt and SWPPP.
7. If required, Elevation Certificates will be provided w th elevations certified during construction (forms at stab pre -
pour) and post construction.
9. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
'113. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shalt be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station stiait apply.
11. The information and conclusions contained in the attached glans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations..
12. Release of plans to (name or firm) is authorized for bidding purpose:
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13. 1, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
lJ TE.
P erty Owner(s) ik( �- Date
Engineer Certification
1. The project has been designed to ensure that stormwater mitigation, inctudirig detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require a sedimentation basin.
1 The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. 1, - > ENGINEE AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS
FO THE Dwl PMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
�t 2 7 1>�
Date
10110 Page 5 of 9
\0b
(*OOF�
CITY OF COLLEGE. STATION
Home ofTexwAe4M UnloeMty'
FOR
CASE NO.: .
DATE SUB
IV
STAFF: V _
DEVELOPMENT PERMIT APPLICATION
MINIMUM SUBMITTAL REQUIREMENTS:
$600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 1% of
acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior
to the issuance of any plans or development permit).
❑ Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
❑ Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
Date of Optional Preapplication or Stormwater Management Conference
SPECIAL FLOOD HAZARD AREA? ❑ Yes �No
(Zone A or Zone AE on FEMA FIRM panels)
NAME OF PROJECT L-D T^ 3o I N
ADDRESS VW tvV loowo I " q-a/f1/V1Jb` N P4I
LEGAL DESCRIPTION (Lot, Block, Subdivision) r Pol IV fi pl4l�lSii LOT-3 RLk Z
APPLICANT / PROJECT MANAGER'S INFORMATION contact for the project):
Name ' v_t6yl- 6/l/61414 E-mail kANiAtCb,-2,oY)
Street Address 1301 kLIGI010&- 1 Ci'IZl �I�
City 'K6bux"7J State no Zip Code `J701 O
Phone Number 71 � `" 63 n V 73 o Fax Number 7 (3 _630 -73g .h
PROPERTY OWNER'S INFORMATION:
Name N I I,LG' &VDN T� E-mail M 6001,iT 0) uleim EIOVhr Cx�T.v✓t�
Street Address :5-70 POC-y 51z, ezow
City State IV Zip Code 770 27
Phone Number ti'�' J [ 6 a� FaxTN_umber 7t j -6 Z 3-017 9
ARCHITECT OR ENGINEER'S INFORMATION:
Name �'�j,� n � '� f,VL( 6'ilj r E-mail
Street Address
City
Phone Number
10/10
State
Fax Number
Zip Code
Pagel of 4
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein.
3. If revoked, all work must cease until permit is re -issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP.
7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
11. The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release of plans to (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
C RATE.
/I3/-/i
Pr erty Owner(s) Date
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., Project over 10 acres may
require a sedimentation basin.
3. The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. 1, TH ENGINE , AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS
FOR E D r
MENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACC RAT .
Engine Date
10/10 Page 2 of 4
The following CERTIFICATIONS apply to development in Special Flood Hazard Areas.
Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only
Permits:*
A. 1,
certify, as demonstrated in the attached drainage study, that the
alterations or development covered by this permit, shall not:
(1) increase the Base Flood elevation;
(ii) create additional areas of Special Flood Hazard Area;
(III) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway
and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can
also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or
areas where the depth of from the BFE to natural ground is 18 inches or greater;
(iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond
the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than
one foot per second without acceptable compensation as set forth in the City of College Station Code of
Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor
(v) increase Base Flood velocities.
beyond those areas exempted by ordinance in Section 5.11.3a of Chapter 13 Code of Ordinances.
Engineer
Date
Initial
EJ* If a platting -status exemption to this requirement is asserted, provide written justification under separate
letter in lieu of certification.
Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits:
LI
certify to the following:
(i) that any nonresidential or multi -family structure on or proposed to be on this site as part of this application is
designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm.
Engineer Date
Additional certification for Floodway Encroachments:
C. I, , certify that the construction, improvement, or fill covered by this
permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments.
Engineer
Date
10/10 Page 3 of 4
Required for all projects proposing structures in
required).
Residential Structures:
Flood Hazard Area (Elevation Certificate
D. I, , certify that all new construction or any substantial improvement
of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an
elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with
elevations certified during construction (forms at slab pre -pour) and post construction.
Engineer/ Surveyor
Commercial Structures:
E. I,
Date
certify that all new construction or any substantial improvement
of any commercial, industrial, or other non-residential structure are designed to have the lowest floor, including all
utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation
Engineer/ Surveyor Date
m
1, , certify that the structure with its attendant utility, ductwork,
basement and sanitary facilities is designed to be flood -proofed so that the structure and utilities, ductwork,
basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all
areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the
hydrostatic and hydrodynamic conditions.
Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
Engineer/ Surveyor
Conditions or comments as part of approval:
Date
10110 Page 4 of 4
°uo'a B. DONNA FAULK _ __ _ __
=d° " " ', xo-,ary Public, State of Texas EI ER, Manager of COLLEGE STATION
My Commission Expires ARKETP ACE, GP, LLC, a Texas limited liability
August Ol, 2010 company
THE STATE OF TEXAS § (ACKNOWLEDGMENT)
COUNTY OF HARRIS
This instrument was acknowledged before me on the 9,0 - day of January, 2009, by ANDY
WEINER, Manager of COLLEGE STATION MARKETPLACE, GP, LLC Teas limited liability
company, on behalf of said company.
Notary Pubfic, State of Texas
,1xxr1i iusi