Loading...
HomeMy WebLinkAboutApplication (11-10)(*O CITY OP COI.LHGl: STATION Home of 7cras A&m University' FINAL PLAT APPLICATION FOR OFFICE USE ONLY CASE NO.: ' 1 4). DATE SUBMITTED: TIME: ''. O STAFF: (Check one) ❑ Minor ❑ Amending ❑X Final ❑ Vacating ❑ Replat ($700) ($700) ($932) ($932) ($932) Is this plat in the ETJ? ❑ Yes ❑X No Is this plat Commercial ❑X or Residential ❑ MINIMUM SUBMITTAL REQUIREMENTS: ❑X $700 -$932 Final Plat Application Fee (see above). -E5- $233 Variance Request to Subdivision Regulations Fee (if applicable). -B- $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). ❑X Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. Please attach pages if additional information is provided. 0 Fourteen (14) folded copies of plat. (A signed mylar original must be submitted after approval.) -8- Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. -� Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). -B- Copy of original deed restrictions /covenants for replats (if applicable). ❑X Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate current within ninety (90) days. The report must include applicable information such as ownership, liens, encumbrances, etc. ❑X Paid tax certificates from City of College Station, Brazos County and College Station I.S.D. ❑X The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not. NOTE: A mylar of the approved preliminary plat must be on file before a final plat application will be considered complete. If the mylar is submitted with the final plat application, it shall be considered a submittal for the preliminary plat project and processed and reviewed as such. Until the mylar has been confirmed by staff to be correct, the final plat application will be considered incomplete. Date of Optional Preapplication or Stormwater Management Conference NAME OF PROJECT Tow er Point Phase 12, Lots 1 -3, Block 2 ADDRESS Highway No. 6 SPECIFIED LOCATION OF PROPOSED PLAT: (South corner of the intersection of Arrington Road and State Highway No. 6 1 APPLICANT /PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Charles A. (Chuck) Ellison E -mail chuck @ellisonlaw.com Street Address 302 Holleman Drive East, Suite 76 City College Stati Phone Number 979-696 -9889 State TX Zip Code 77840 Fax Number 97 9- 693 -8819 10/10 Page 1 of 9 PROPERTY OWNER'S INFORMATION (All owners must be identified. Please attach an additional sheet for multiple owners): Name Colle S M a rk etp la ce, L.P. E -mail andyweiner @weinerdevelopment.com Street Address 520 Post Oak Blvd. Suite 880 City Houston State TX Zip Code 77027 Phone Number 713 - 623 -0188 Fax Number 713- 623 -0178 ARCHITECT OR ENGINEER'S INFORMATION: Name Kling Engineering & Surveying E -mail stewart@klingeng.com Street Address 4101 S. Texas Ave. Suite A City Bryan Phone Number 979184616212 State TX Zip Code 77802 Fax Number 979184618252 Do any deed restrictions or covenants exist for this property? Yes ❑x No ❑ Is there a temporary blanket easement on this property? If so, please provide the Volume and Page No Total Acreage 5.44 Total No. of Lots 3 R -O -W Acreage none Existing Use vacant Proposed Use commercial /retail Number of Lots By Zoning District 3 / C -1 Average Acreage Of Each Residential Lot By Zoning District: n/a / Floodplain Acreage none Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? F Yes R No A statement addressing any differences between the Final Plat and Preliminary Plat (if annlirnhla�- gone requested variance to subdivision regulations and reason for same (if applicable): one Regarding the variance request, explain how: 1. There are special circumstances or conditions affecting the land involved such that strict application of the subdivision regulations will deprive the applicant of the reasonable use of his land. Va 2. The waiver is necessary for the preservation and enjoyment of a substantial Drobertv riaht of the annIirant 10/10 Page 2 of 9 3. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other property in the area, or to the City in administering subdivision regulations. 4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in accordance with the provisions of the Unified Development Ordinance. Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable): F_ An alternative pedestrian way or multi -use path has been or will be provided outside the right -of -way; F The presence of unique or unusual topographic, vegetative, or other natural conditions exist so that strict adherence to the sidewalk requirements of the UDO is not physically feasible or is not in keeping with the purposes X 10" and goals of the UDO or the City's comprehensive Plan; F A capital improvement project is imminent that will include construction of the required sidewalk. Imminent shall mean the project is funded or projected to commence within twelve (12) months; F The proposed development is within an older residential subdivision meeting the criteria in Platting and Replatting within Older Residential Subdivisions Section of the UDO; or F The proposed development contains frontage on a Freeway / Expressway as designated by Map 6.6, Thoroughfare Plan - Functional Classification, in the City's Comprehensive Plan. Detailed explanation of condition identified above: n/a NOTE: A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the same time by the Planning & Zoning Commission. 10/10 Page 3 of 9 Requested Oversize Participation None Total Linear Footage of *k Proposed Public: Streets Sidewalks Sanitary Sewer Lines Water Lines Channels Storm Sewers Bike Lanes I Paths Par d Dedication due prior to filing the Final Plat: ACREAGE: No. of acres to edicated + $ development fee No. of acres in floodplai No. of acres in detention No. of acres in greenways OR FEE IN LIEU OF LAND: No. of SF Dwelling Units X $ _ $ (date) Approved by Parks & Recreation Advisory Board NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true, correct, and complete. IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application must be accompanied by proof of authority for the company's representative to sign the application on its behalf. LIEN HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as described above. Si nature and title / - �T'�� Date 'Public infrastructure submitted separately by Walter P. Moore. See development permit for.applicable footage. 10110 Page 4 of 9 CERTIF'ICAT'IONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. - rho permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re issued. 4. Development shall not be used or occupied unlit a Certificate of Occupancy is issued. 5, The permit will expire if no significant work is progressing within 24 months of issuance. 8. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOt and SWPPP. 7. If required, Elevation Certificates will be provided w th elevations certified during construction (forms at stab pre - pour) and post construction. 9. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. '113. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shalt be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station stiait apply. 11. The information and conclusions contained in the attached glans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations.. 12. Release of plans to (name or firm) is authorized for bidding purpose: only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. 1, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND lJ TE. P erty Owner(s) ik( �- Date Engineer Certification 1. The project has been designed to ensure that stormwater mitigation, inctudirig detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may require a sedimentation basin. 1 The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 4. 1, - > ENGINEE AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FO THE Dwl PMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND �t 2 7 1>� Date 10110 Page 5 of 9 \0b (*OOF� CITY OF COLLEGE. STATION Home ofTexwAe4M UnloeMty' FOR CASE NO.: . DATE SUB IV STAFF: V _ DEVELOPMENT PERMIT APPLICATION MINIMUM SUBMITTAL REQUIREMENTS: $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 1% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). ❑ Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. ❑ Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). Date of Optional Preapplication or Stormwater Management Conference SPECIAL FLOOD HAZARD AREA? ❑ Yes �No (Zone A or Zone AE on FEMA FIRM panels) NAME OF PROJECT L-D T^ 3o I N ADDRESS VW tvV loowo I " q-a/f1/V1Jb` N P4I LEGAL DESCRIPTION (Lot, Block, Subdivision) r Pol IV fi pl4l�lSii LOT-3 RLk Z APPLICANT / PROJECT MANAGER'S INFORMATION contact for the project): Name ' v_t6yl- 6/l/61414 E-mail kANiAtCb,-2,oY) Street Address 1301 kLIGI010&- 1 Ci'IZl �I� City 'K6bux"7J State no Zip Code `J701 O Phone Number 71 � `" 63 n V 73 o Fax Number 7 (3 _630 -73g .h PROPERTY OWNER'S INFORMATION: Name N I I,LG' &VDN T� E-mail M 6001,iT 0) uleim EIOVhr Cx�T.v✓t� Street Address :5-7­0 POC-y 51z, ezow City State IV Zip Code 770 27 Phone Number ti'�' J [ 6 a� FaxTN_umber 7t j -6 Z 3-017 9 ARCHITECT OR ENGINEER'S INFORMATION: Name �'�j,� n � '� f,VL( 6'ilj r E-mail Street Address City Phone Number 10/10 State Fax Number Zip Code Pagel of 4 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re -issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND C RATE. /I3/-/i Pr erty Owner(s) Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., Project over 10 acres may require a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 4. 1, TH ENGINE , AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR E D r MENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACC RAT . Engine Date 10/10 Page 2 of 4 The following CERTIFICATIONS apply to development in Special Flood Hazard Areas. Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only Permits:* A. 1, certify, as demonstrated in the attached drainage study, that the alterations or development covered by this permit, shall not: (1) increase the Base Flood elevation; (ii) create additional areas of Special Flood Hazard Area; (III) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor (v) increase Base Flood velocities. beyond those areas exempted by ordinance in Section 5.11.3a of Chapter 13 Code of Ordinances. Engineer Date Initial EJ* If a platting -status exemption to this requirement is asserted, provide written justification under separate letter in lieu of certification. Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits: LI certify to the following: (i) that any nonresidential or multi -family structure on or proposed to be on this site as part of this application is designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm. Engineer Date Additional certification for Floodway Encroachments: C. I, , certify that the construction, improvement, or fill covered by this permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments. Engineer Date 10/10 Page 3 of 4 Required for all projects proposing structures in required). Residential Structures: Flood Hazard Area (Elevation Certificate D. I, , certify that all new construction or any substantial improvement of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -pour) and post construction. Engineer/ Surveyor Commercial Structures: E. I, Date certify that all new construction or any substantial improvement of any commercial, industrial, or other non-residential structure are designed to have the lowest floor, including all utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation Engineer/ Surveyor Date m 1, , certify that the structure with its attendant utility, ductwork, basement and sanitary facilities is designed to be flood -proofed so that the structure and utilities, ductwork, basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the hydrostatic and hydrodynamic conditions. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction. Engineer/ Surveyor Conditions or comments as part of approval: Date 10110 Page 4 of 4 °uo'a B. DONNA FAULK _ __ _ __ =d° " " ', xo-,ary Public, State of Texas EI ER, Manager of COLLEGE STATION My Commission Expires ARKETP ACE, GP, LLC, a Texas limited liability August Ol, 2010 company THE STATE OF TEXAS § (ACKNOWLEDGMENT) COUNTY OF HARRIS This instrument was acknowledged before me on the 9,0 - day of January, 2009, by ANDY WEINER, Manager of COLLEGE STATION MARKETPLACE, GP, LLC Teas limited liability company, on behalf of said company. Notary Pubfic, State of Texas ,1xxr1i iusi