Staff reviewed the above-mentioned site plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. Please address
the comments and submit the following information for further staff review and approval:
Three (3) complete sets of construction documents for the proposed
development with the revised site and landscaping plans attached.
If there are comments that you are not addressing with the revised site plan, please
attach a letter explaining the details. If you have any questions or need additional
information, please call Jennifer Flanery or Spencer Thompson at 764-3570.
Attachments: Staff review comments
cc: Michael Orsak, SHP Callaway Land, LP, Via fax 512-479-4067
Case file #02-00500169
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: CALLAWAY HOUSE PRKG SUB (SP) - 02-00500169
PLANNING
1. Please draw and dimension each parking space as it will be striped and draw and
dimension all drive aisles.
2. 180 sq-ft of landscaped islands are required at the ends of every parking row.
Additionally, 180 sq-ft of landscaped islands for every 15 interior parking spaces
must be provided within the interior rows of parking. If end islands are larger than is
required, then the additional square footage may be used toward the interior island
requirement. Please provide the square footage of islands on the site plan to be
sure this requirement is being met. If you need a clarification of which of your aisles
are interior or peripheral, please contact me.
3. Please provide the current zoning of each parcel. The correct zoning is M-2 and not
M-1.
4. Please indicate floodplain on the property. If there is no floodplain on site, please
make the note on the site plan.
5. Please locate and dimension distances from any existing opposite or adjacent
driveways along Marion Pugh Drive.
6. Please include all required information from the Site Plan checklist in the title block
of all pages, including the Landscape Plan.
7. Please either provide an irrigation plan or make a note on the landscape plan that
an irrigation plan must be approved prior to Certificate of Completion.
8. Streetscaping is required on Marion Pugh, a major collector, by section 10.2.N of the
Zoning Ordinance, "Additional Requirements."
9. Streetscaping is required on Wellborn Road because it is a major arterial.
10. Please insure that all parking spaces visible from the right-of-way (this includes
Marion Pugh and Wellborn) are screened.
11. The site area is 1.376 acres per the site plan. You are required 1,799 landscaping
points, plus the additional streetscaping points required.
12.The Preliminary Plat was approved with a crosswalk across Marion Pugh from the
Callaway House Dormitory to new parking area. Please keep this in mind when
considering the sidewalk layout. Please show the proposed location on the next site
plan. We are also working with our Traffic Engineers to determine a suitable
location.
Reviewed by: JENNIFER FLANERY Date: August 15, 2002
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 2 of 3
I
ENGINEERING
1. Please show public sewer and manholes on plan.
2. Six-foot discharge opening?
Reviewed by: Spencer Thompson
Date: August 15, 2002
ELECTRICAL
1. Developer provides 10' electrical easement for URD primary electric line from
transformer toward railroad track.
Reviewed by: Ronnie Bolin Date:8-14-02
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker or
Reduced Pressure Principle Back Flow Device and installed as per City Ordinance
2394.
2. All BackFlow devices must be installed and tested upon installation as per City
Ordinance 2394.
Reviewed by: Rob Werley
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 3 of 3
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764-3570 / Fax (979) 764-3496
MEMORANDUM
DATE: August 20, 2002
TO: Greg Taggart, Municipal Development Group
FROM: Jennifer Flanery, Staff Planner
SUBJECT: Callaway House Parking Site Plan (02-169) - Streetscape Ordinance
Interpretation.
As you are aware, this property is located on a major corridor to Texas A&M University,
Wellborn Road, and is highly visible from the main corridor to the George Bush
Presidential Library, George Bush Drive. The City of College Station has adopted a
Streetscape Plan to improve the aesthetic quality of and bring unity and identity to City
thoroughfares.
It is Staffs interpretation that the Streetscape Ordinance, found in Section 11.3 of the
College Station Zoning Ordinance, applies to development that fronts on Wellborn Road
adjacent to the railroad right-of-way. This requirement meets the intent of the Streetscape
Plan and the Zoning Ordinance and will apply to all developing property along Wellborn
Road.
This property enjoys the benefits of Wellborn frontage, including high visibility, and
must comply with all applicable regulations for properties with thoroughfare frontage,
including the Streetscape Ordinance and parking screening.
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 2
Project: CALLAWAY HOUSE PRKG SUBD (FP) - 02-00500185
ENGINEERING
1. Change directional of 240.18' property line from N/E to S/W for continuity.
2. Change City Engineer Certification. Take out "Bob Mosley" and inset blank line.
Reviewed by: Spencer Thompson Date: September 10, 2002
INFRASTRUCTURE AND FACILITIES
Water required for plat: No, 6" water existing along frontage.
Water Service: Service will be taken from the existing 6" main.
Sewer required for plat: No, sewer main along rear of property.
Sewer Service: Service will be taken from main in rear.
Street(s) required for plat: No, however Marion Pugh is shown on the
Thoroughfare Plan as a major collector requiring 70-ft of ROW. It
appears that there is 60-ft existing ROW. This plat requires an additional
5-ft of ROW dedication.
Streets/Access: The property fronts on and has access to Marion Pugh.
There exists a joint access easement with McDonalds. Any other access
to this property must meet the Driveway Ordinance. The required
sidewalk will be constructed to meet City Standards. Handicap ramps
will be required on both sides of the street to accommodate the
crosswalk.
Off-site Easements required for plat: None known at this time.
Drainage: A Development Permit is required for development of this
site. It appears the site could drain to the rear along the railroad ROW or
to the front into the City storm system.
Flood Plain: The property is not located within the 100-year flood plain.
Oversize request: None.
Impact Fees: None.
Parkland Dedication Fees: None, if developed as a parking lot. If the
site redevelops as "dwelling units", parkland would be required.