Loading...
HomeMy WebLinkAbout09-00500138- 00074760Drainage Report for Aggieland Business Park II College Station, Texas September, 2009 Developer: 60-Jones, LLC 6161 Imperial Lop, Suite 101 College Station, Texas 77840 (979) 571-4341 Engineer: Civil Development, Ltd. 2033 Harvey Mitchell Parkway South College Station, Texas 77840 (979) 764-7743 ,6P-/F I 2`lj 40 a Executive Summary Report Aggieland Business Park II College Station, Texas September, 2009 ENGINEER Civil Development, Ltd. - Kent Laza, P.E. (klaza@cdlbcs.com) P.O. Box 11929 College Station, Texas 77842 Phone: (979) 764-7743 Fax: (979) 764-7759 OWNER/DEVELOPER 60-Jones, LLC 6161 Imperial Loop, Suite 101 College Station, Texas 77840 Phone: (979) 571-4341 GENERAL This project is located on the northeast corner of Jones Road and FM 60 and is part of the Aggieland Business Park II development project. The site is anticipated to be developed as a convenience store although no formal plans have been developed at this time. The general stormwater plan consists of improving a natural drainage channel that runs through the upper portion of the lot, and the installation of 3-42" storm pipes to carry water through the middle portion of the site where the future buildings and driveways will be located. HYDROLOGIC CHARACTERISTICS & EXISTING CONDITIONS The site has recently been cleared, but the previous land cover was dense brush and trees. The soil is classified as a sandy loam (Soil Group B) by the USGS Soil Maps of Brazos County. The drainage basin that encompasses this property includes a total of about 126 acres as shown in Exhibit A. Runoff from this basin flows in a southerly direction, and enters the property through an existing drainage channel. Immediately downstream of the site is FM 60, which has two box culverts in close proximity to each other to carry the runoff under the roadway. One is a 5'x 5' culvert and the other is a 4'x 2' culvert. A second drainage basin encompassing approximately 64 acres and located immediately adjacent to the first basin also drains to the same crossing point along the TxDOT right-of-way and contributes to the flow under FM 60. A third basin located west of Jones Road and encompassing about 25 acres flows to these culverts along the TxDOT right-of- way as well. Calculations indicate that the two culverts under FM 60 were not designed to pass runoff from these three basins during a 100-yr rainfall event. As a result, water pools upstream of FM 60 and builds up until it flows over the roadway. The roadway serves as a dam and the resulting pool functions as a detention pond upstream of the roadway where the proposed site is located. Under the anticipated development plan, the existing channel through the site will be improved for a length of approximately 160 feet, then be directed into 3-42" storm pipes to pass water through the site. The anticipated development plan will require that the site be raised sufficiently to prevent it from being inundated during heavy rainfall events, but some storage will still be maintained along the channel and immediately adjacent to the TxDOT right-of-way. The analysis that follows takes into account the storage provided by the FM 60 roadway in both the pre- and post-development scenarios. Detention calculations for the post-development scenario were made using assumptions regarding the final grading along the stream and the front of the site. No additional detention facility is planned. Applicable Exhibits: Exhibit A - Drainage Area Map (pre-development conditions) Exhibit B - Drainage Area Map (post-development conditions) CHANNEL DESIGN INFORMATION Design Software Hydraflow Express Extension for Autocad 2010 Manning's n Value: 0.035 (dense grass) Slope: 0.6% Bottom Width: 2 ft Top Width: 30 ft Depth: 3.5 ft Side Slopes: 4:1 Summarv of Channel Designn Analvsis: 100 year flow rate: 192.2 cfs Velocity: 4.47 ft/s Depth: 3.06 ft Top Width: 26.48 ft * The flowrate used for the channel design is taken from 100 year pre-development peak flowrate for Drainage Area 150 in HEC-HMS. This value can be found in Exhibit A. Applicable Exhibits: Exhibit C - Hydraflow Channel Design Report STORM SEWER DESIGN INFORMATION Design Software: Hydraflow Storm Sewer Extension for Autocad 2010 Pipe Size: 42 inch, HPDE Manning's n-value: 0.012 Pipe Length: 285 ft Slope: 0.5% Summary of Storm Sewer Design Analysis. Pipe Capacity: 231.6 cfs 100 year flow rate: 192.2 cfs Velocity: 7.22 ft/s Applicable Exhibits: Exhibit D - Hydraflow Pipe Design Report CONCLUSIONS From the HEC-HMS analysis shown above, we conclude that the FM 60 roadway provides a level of detention resulting from the culvert sizes that were installed when the facility was built. These culverts were not designed to pass the 100-yr event, so we presume that TxDOT anticipated the pooling of runoff upstream of the roadway during large rainfall events. When analyzed under both pre- and post- development scenarios, this detention provides a reduction in runoff from the mid- range storm events, but allows slightly higher peak flows during the 2-yr and 100- yr events. The slightly higher peak flowrate for the 100-yr event represents about a 1% increase from the pre-development scenario, which computes to be 0.01 feet (about 1/8t' of an inch) increase in the water surface elevation over the FM 60 roadway. This is a negligible amount of increase that will have no noticeable impact on downstream properties. As a result, we conclude that additional detention facilities are not necessary for the development of this site. Applicable Exhibits: Exhibit E - HEC-HMS Analysis Report (pre-development conditions) Exhibit F - HEC-HMS Analysis Report (post-development conditions) X o~ 1 '-Iil fig Q_ i o\ IN, 1 151 \ 64. 8 \ 26.6 150 126.6 ACREAGE i LEGEND DRAINAGE AREA LABEL ~'"ate °a'B'r AGGIELAND BUSINESS PARK, II R a A PRE DEVELOPMENT 2U33 M~rve MM1OM1etl P_,wy &wM ColMpe 81~Ibn, Tap new P.C. Sm 11no, Cdw" &m-. T~p. "M DRAINAGE AREA MAP (979)TW-7743 Fp:(9M? -no l og~\ 251 a I LEGEND DRAINAGE AREA LABEL 150 126.6 ACREAGE r s r ~ i ow \ Ap \ l` f19 ~ I i I I I 1 250A 117.64 Al\ r~ EXHIBIT AGGIELAND BUSINESS PARK, II mwm K~ B POST DEVELOPMENT ]p3 C,14g, Stot MbTno,. TahwySONA ° Colbp~ n 77B10 DRAINAGE AREA MAP °~~7~»:~`~:~N 1 7717 EXHIBIT C Aggieland Business Park II Hydraflow Channel Report Channel Desien Bottom Width = 2 Side Slopes = 4:1 Total Depth = 3.5 ft Slope = 0.60% n-value = 0.035 Storm Return Period Flow* (cfs) Depth (ft) Veloc (ft/s) Top Width (ft) Energy (ft) 100-year 192.2 3.06 4.47 26.48 3.37 50-year 161.0 2.85 4.28 24.80 3.13 25-year 125.5 2.58 4.01 22.64 2.83 10-year 100.9 2.36 3.80 20.88 2.58 2-year 37.1 1.56 2.96 14.48 1.70 * The flowrates in the column labeled "Flow" were taken from the values calculated in HEC-HMS EXHIBIT D Aggieland Business Park II Hydraflow Pipe Report Pipe Design Size = 3 - 42 inch HDPE Pipe Length = 285 ft Slope = 0.50% n-value = 0.012 Capacity (full)= 231.6 cfs Storm Return Period Flow* (cfs) Avg Veloc (ft/s) Depth Up (ft) Depth Dn (ft) HGL Up (ft) HGL Down (ft) 100-year 192.2 7.22 2.87 3.50 290.34 289.54 50-year 161.0 6.43 2.57 3.50 290.04 289.54 25-year 125.5 5.32 2.34 3.50 289.81 289.54 10-year 100.9 4.42 2.23 3.50 289.70 289.54 2-year 37.1 1.72 2.09 3.50 289.56 289.54 * The flowrates in the column labeled "Flow" were taken from the values calculated in HEC-HMS Exhibit E HEC-HMS Pre-Development Analysis Report Project: Aggieland II Simulation Run: Pre 2 yr Start of Run: 01Jan2007, 00:00 Basin Model: Pre Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 2 yr Compute Time: 26Aug2009, 15:39:03 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 150 0.19780 37.1 01 Jan2007, 14:10 1.311 151 0.10059 14.3 01 Jan2007, 14:00 0.973 152 0.03922 69.8 01 Jan2007, 12:15 4.357 Existing Topo 0.33761 68.9 01 Jan2007, 12:20 1.563 Outfall 0.33761 68.9 01 Jan2007, 12:20 1.563 Project: Aggieland II Simulation Run: Pre 10 yr Start of Run: 01 Jan2007, 00:00 Basin Model: Pre Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 10 yr Compute Time: 26Aug2009, 15:38:58 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 150 0.19780 100.9 01 Jan2007, 14:05 3.354 151 0.10059 46.0 01 Jan2007, 13:50 2.787 152 0.03922 115.7 01 Jan2007, 12:15 7.244 Existing Topo 0.33761 156.5 01 Jan2007, 14:00 3.633 Outfall 0.33761 156.5 01 Jan2007, 14:00 3.633 Project: Aggieland II Simulation Run: Pre 25 yr Start of Run: 01 Jan2007, 00:00 Basin Model: Pre Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 25 yr Compute Time: 26Aug2009, 15:39:00 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 150 0.19780 125.5 01 Jan2007, 14:00 4.142 151 0.10059 58.7 01 Jan2007, 13:45 3.512 152 0.03922 131.5 01 Jan2007, 12:15 8.241 Existing Topo 0.33761 190.2 01 Jan2007, 14:10 4.425 Outfall 0.33761 190.2 01 Jan2007, 14:10 4.425 Project: Aggieland II Simulation Run: Pre 50 yr Start of Run: 01Jan2007, 00:00 Basin Model: Pre Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 50 yr Compute Time: 08Sep2009, 10:18:25 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 150 0.19780 161.0 01 Jan2007, 14:00 5.290 151 0.10059 77.5 01 Jan2007, 13:45 4.584 152 0.03922 153.6 01 Jan2007, 12:15 9.636 Existing Topo 0.33761 236.1 01 Jan2007, 14:20 5.578 Outfall 0.33761 236.1 01 Jan2007, 14:20 5.578 Project: Aggieland II Simulation Run: Pre 100 yr Start of Run: 01 Jan2007, 00:00 Basin Model: Pre Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 100 yr Compute Time: 26Aug2009, 15:38:55 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 150 0.19780 192.2 01 Jan2007, 14:00 6.307 151 0.10059 94.2 01 Jan2007, 13:45 5.544 152 0.03922 172.5 01 Jan2007, 12:15 10.833 Existing Topo 0.33761 285.8 01 Jan2007, 14:15 6.597 Outfall 0.33761 285.8 01 Jan2007, 14:15 6.597 Project: Aggieland II Simulation Run: Pre 100 yr Reservoir: Existing Topo Start of Run: 01 Jan2007, 00:00 Basin Model: Pre Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 100 yr Compute Time: 26Aug2009, 15:38:55 Control Specifications: 24 hr duration Volume Units: IN Computed Results Peak Inflow : 300.9 (CFS) Peak Outflow : 285.8 (CFS) Total Inflow : 6.605 (IN) Total Outflow : 6.597 (IN) Date/Time of Peak Inflow : Date/Time of Peak Outflow Peak Storage : Peak Elevation 01 Jan2007, 13:50 01 Jan2007, 14:15 5.6 (AC-FT) 292.05 (FT) Exhibit F HEC-HMS Post-Development Analysis Report Project: Aggieland II Simulation Run: Post 2 yr Start of Run: 01 Jan2007, 00:00 Basin Model: Post Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 2 yr Compute Time: 08Sep2009, 10:32:05 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 250A 0.18380 34.5 01 Jan2007, 14:10 1.305 250B 0.00759 7.1 01 Jan2007, 12:15 1.891 250C 0.00641 13.9 01 Jan2007, 12:05 4.144 251 0.10059 14.3 01 Jan2007, 14:00 0.973 252 0.03922 69.8 01 Jan2007, 12:15 4.357 Det Pond 0.33761 83.4 01 Jan2007, 12:20 1.621 Jct 1 0.18380 34.5 01 Jan2007, 14:10 1.305 Jct 2 0.19139 35.2 01 Jan2007, 14:20 1.324 Outfall 0.33761 83.4 01 Jan2007, 12:20 1.621 Reach 1 0.18380 34.5 01 Jan2007, 14:20 1.300 Project: Aggieland II Simulation Run: Post 10 yr Start of Run: 01Jan2007, 00:00 Basin Model: End of Run: 02Jan2007, 00:05 Meteorologic Model: Compute Time: 08Sep2009, 10:32:01 Control Specifications Volume Units: IN Post Dev 10 yr 24 hr duration Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 250A 0.18380 94.1 01 Jan2007, 14:00 3.345 250B 0.00759 16.5 01 Jan2007, 12:10 4.274 250C 0.00641 23.4 01 Jan2007, 12:05 7.010 251 0.10059 46.0 01 Jan2007, 13:50 2.787 252 0.03922 115.7 01 Jan2007, 12:15 7.244 Det Pond 0.33761 156.1 01 Jan2007, 12:20 3.703 Jct 1 0.18380 94.1 01 Jan2007, 14:00 3.345 Jct 2 0.19139 95.6 01 Jan2007, 14:10 3.372 Outfall 0.33761 156.1 01 Jan2007, 12:20 3.703 Reach 1 0.18380 94.1 01 Jan2007, 14:10 3.335 Project: Aggieland II Simulation Run: Post 25 yr Start of Run: 01 Jan2007, 00:00 Basin Model: Post Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 25 yr Compute Time: 08Sep2009, 10:32:03 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 250A 0.18380 117.0 01 Jan2007, 14:00 4.132 250B 0.00759 19.9 01 Jan2007, 12:10 5.156 250C 0.00641 26.7 01 Jan2007, 12:05 8.003 251 0.10059 58.7 01 Jan2007, 13:45 3.512 252 0.03922 131.5 01 Jan2007, 12:15 8.241 Det Pond 0.33761 186.5 01 Jan2007, 14:10 4.497 Jct 1 0.18380 117.0 01 Jan2007, 14:00 4.132 Jct 2 0.19139 118.8 01 Jan2007, 14:10 4.162 Outfall 0.33761 186.5 01 Jan2007, 14:10 4.497 Reach l 0.18380 117.0 01 Jan2007, 14:10 4.120 Project: Aggieland II Simulation Run: Post 50 yr Start of Run: 01 Jan2007, 00:00 Basin Model: Post Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 50 yr Compute Time: 08Sep2009, 10:32:07 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 250A 0.18380 150.2 01 Jan2007, 14:00 5.280 250B 0.00759 24.7 01 Jan2007, 12:10 6.422 250C 0.00641 31.3 01 Jan2007, 12:05 9.395 251 0.10059 77.5 01 Jan2007, 13:45 4.584 252 0.03922 153.6 01 Jan2007, 12:15 9.636 Det Pond 0.33761 236.0 01 Jan2007, 14:15 5.653 Jct 1 0.18380 150.2 01 Jan2007, 14:00 5.280 Jct 2 0.19139 152.2 01 Jan2007, 14:10 5.311 Outfall 0.33761 236.0 01 Jan2007, 14:15 5.653 Reach 1 0.18380 150.1 01 Jan2007, 14:10 5.266 Project: Aggieland II Simulation Run: Post 100 yr Start of Run: 01Jan2007, 00:00 Basin Model: Post Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 100 yr Compute Time: 08Sep2009, 10:31:58 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 250A 0.18380 179.3 01 Jan2007, 14:00 6.295 250B 0.00759 28.9 01 Jan2007, 12:10 7.528 250C 0.00641 35.2 01 Jan2007, 12:05 10.590 251 0.10059 94.2 01 Jan2007, 13:45 5.544 252 0.03922 172.5 01 Jan2007, 12:15 10.833 Det Pond 0.33761 289.2 01 Jan2007, 14:05 6.676 Jct 1 0.18380 179.3 01 Jan2007, 14:00 6.295 Jct 2 0.19139 181.8 01 Jan2007, 14:05 6.329 Outfall 0.33761 289.2 01 Jan2007, 14:05 6.676 Reach 1 0.18380 179.2 01 Jan2007, 14:05 6.279 Project: Aggieland II Simulation Run: Post 100 yr Reservoir: Det Pond Start of Run: 01 Jan2007, 00:00 Basin Model: Post Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 100 yr Compute Time: 08Sep2009, 10:31:58 Control Specifications: 24 hr duration Volume Units: IN Computed Results Peak Inflow : 290.6 (CFS) Peak Outflow : 289.2 (CFS) Total Inflow : 6.699 (IN) Total Outflow : 6.676 (IN) Date/Time of Peak Inflow : Date/Time of Peak Outflow Peak Storage : Peak Elevation 01Jan2007, 13:55 01 Jan2007, 14:05 3.9 (AC-FT) 292.06 (FT) Executive Summary Report Aggieland Business Park II College Station, Texas September, 2009 ENGINEER Civil Development, Ltd. - Kent Laza, P.E. (klaza@cdlbcs.com) P.O. Box 11929 College Station, Texas 77842 Phone: (979) 764-7743 Fax: (979) 764-7759 OWNER/DEVELOPER 60-Jones, LLC 6161 Imperial Loop, Suite 101 College Station, Texas 77840 Phone: (979) 571-4341 GENERAL This project is located on the northeast corner of Jones Road and FM 60 and is part of the Aggieland Business Park II development project. The site is anticipated to be developed as a convenience store although no formal plans have been developed at this time. The general stormwater plan consists of improving a natural drainage channel that runs through the upper portion of the lot, and the installation of 3-42" storm pipes to carry water through the middle portion of the site where the future buildings and driveways will be located. HYDROLOGIC CHARACTERISTICS & EXISTING CONDITIONS The site has recently been cleared, but the previous land cover was dense brush and trees. The soil is classified as a sandy loam (Soil Group B) by the USGS Soil Maps of Brazos County. The drainage basin that encompasses this property includes a total of about 126 acres as shown in Exhibit A. Runoff from this basin flows in a southerly direction, and enters the property through an existing drainage channel. Immediately downstream of the site is FM 60, which has two box culverts in close proximity to each other to carry the runoff under the roadway. One is a 5'x 5' culvert and the other is a 4'x 2' culvert. A second drainage basin encompassing approximately 64 acres and located immediately adjacent to the first basin also drains to the same crossing point along the TxDOT right-of-way and contributes to the flow under FM 60. A third basin located west of Jones Road and encompassing about 25 acres flows to these culverts along the TxDOT right-of- way as well. Calculations indicate that the two culverts under FM 60 were not designed to pass runoff from these three basins during a 100-yr rainfall event. As a result, water pools upstream of FM 60 and builds up until it flows over the roadway. The roadway serves as a dam and the resulting pool functions as a detention pond upstream of the roadway where the proposed site is located. Under the anticipated development plan, the existing channel through the site will be improved for a length of approximately 160 feet, then be directed into 3-42" storm pipes to pass water through the site. The anticipated development plan will require that the site be raised sufficiently to prevent it from being inundated during heavy rainfall events, but some storage will still be maintained along the channel and immediately adjacent to the TxDOT right-of-way. 12 The analysis that follows takes into account the storage provided by the FM 60 roadway in both the pre- and post-development scenarios. Detention calculations for the post-development scenario were made using assumptions regarding the final grading along the stream and the front of the site. No additional detention facility is planned. Applicable Exhibits: Exhibit A - Drainage Area Map (pre-development conditions) Exhibit B - Drainage Area Map (post-development conditions) CHANNEL DESIGN INFORMATION Design Software Hydraflow Express Extension for Autocad 2010 Manning's n Value: 0.035 (dense grass) Slope: 0.6% Bottom Width: 2 ft Top Width: 30 ft Depth: 3.5 ft Side Slopes: 4:1 Summary of Channel Design Analysis: 100 year flow rate: 192.2 cfs Velocity: 4.47 ft/s Depth: 3.06 ft Top Width: 26.48 ft * The flowrate used for the channel design is taken from 100 year pre-development peak flowrate for Drainage Area 150 in HEC-HMS. This value can be found in Exhibit A. Applicable Exhibits: Exhibit C - Hydraflow Channel Design Report STORM SEWER DESIGN INFORMATION Design Software: Hydraflow Storm Sewer Extension for Autocad 2010 Pipe Size: 42 inch, HPDE Manning's n-value: 0.012 Pipe Length: 285 ft Slope: 0.5% Summary of Storm Sewer Design Anal Pipe Capacity: 231.6 cfs 100 year flow rate: 192.2 cfs Velocity: 7.22 ft/s Applicable Exhibits: Exhibit D - Hydraflow Pipe Design Report DETENTION ANALYSIS Design Software: Methodology: Design Storms: HEC-HMS Version 3.3 SCS Unit Hydrograph 2, 10, 25, 50, 100-year storms Input Data Pre-Develeopment Conditions Lag Drainage ge Area CN o Time Imperv (min.' 150 126.60 65.7 0.0 109 151 64.38 60.0 0.0 94 152 25.10 92.0 85.0 13 Post-Develeopment Conditions Lag Drainage Length Area i CN % Time Area - Imperv (feet) (acres) min. 250A 117.64 . . . 66.1 0.0 108 250B . . . . . . . . . 4.86 , 73.2 0.0 . 10 . 250C , 4.10 87.4 85.0 e 5 251 . 64.4 60.0 0.0 94 . 252 . 25.1 92.0 _ 85.0 13 *Reach 1 . . 158 . 84.0 . 5 . . . . *Reach 2 285 99.0 4 * Reaches I and 2 were combined in HEC-HMS into a single reach with a total lag time of 9 minutes. HEC-HMS Analysis Summary The pre- and post-development flowrates were analyzed immediately downstream of the FM 60 culverts. This point is referred to as the Outfall in the HEC-HMS model. The following table shows the peak flowrates at the Outfall point. C di i 2 r 10 r 25 r 50 r 100 r on t on cfs cfs cfs cfs cfs Pre Dev 68.9 156.5 190.2 236.1 285.8 Post Dev 83.4 156.1 186.5 236.0 289.2 Change in Flowrate 14.5 -0.4 -3.7 -0.1 3.4 Change in Water Surface Elev. 0.13 0.00 0.00 0.00 0.01** The results for the change in water surface elevations for the 100 year storm can be found in Exhibit F. CONCLUSIONS From the HEC-HMS analysis shown above, we conclude that the FM 60 roadway provides a level of detention resulting from the culvert sizes that were installed when the facility was built. These culverts were not designed to pass the 100-yr event, so we presume that TxDOT anticipated the pooling of runoff upstream of the roadway during large rainfall events. When analyzed under both pre- and post- development scenarios, this detention provides a reduction in runoff from the mid- range storm events, but allows slightly higher peak flows during the 2-yr and 100- yr events. The slightly higher peak flowrate for the 100-yr event represents about a 1% increase from the pre-development scenario, which computes to be 0.01 feet (about 1/8`h of an inch) increase in the water surface elevation over the FM 60 roadway. This is a negligible amount of increase that will have no noticeable impact on downstream properties. As a result, we conclude that additional detention facilities are not necessary for the development of this site. Applicable Exhibits: Exhibit E - HEC-HMS Analysis Report (pre-development conditions) Exhibit F - HEC-HMS Analysis Report (post-development conditions) l 151 64. C) LEGEND DRAINAGE AREA LABEL 150 126.6 ACREAGE . V r \ t t ( ! j 1 r \ ~~w \ A \ e~ 26.6 r1 ; a D0i11"T AGGIELAND BUSINESS PARK, fl A(,i°a//ePSQrimvrj,w(A ,E w~ orax ,,,E 0 A 3033 N•rvaY MXO.e1 ..M 3pM PRE DEVELOPMENT Co1MpeS~•~p^*~-nW v O. Bm 11M CdWp SWw Tm••nW DRAINAGE AREA MAP "79"°`.7713 F°'$N" 77 ° t `i l ` I i J/ P 0 I ~i jt f oy, \ I 1 250A 117.64 u l r ~ r F 251 64 LEGEND DRAINAGE AREA LABEL 150 126.6 ACREAGE ,wow EXHIBIT AGGIELAND BUSINESS PARK, II valJsvswo Hmas4L x°. lint B POST DEVELOPMENT ]03C'lwo. MMO~~II-"77 SOUM ° Col- Station, T „!10 DRAINAGE AREA MAP °rveoc is n13"-(eni 1841,N EXHIBIT C Aggieland Business Park II Hydraflow Channel Report Channel Design Bottom Width = 2 Side Slopes = 4:1 Total Depth = 3.5 ft Slope = 0.60% n-value = 0.035 Storm Return Period Flow* (cfs) Depth (ft) Veloc (ft/s) Top Width (ft) Energy (ft) 100-year 192.2 3.06 4.47 26.48 3.37 50-year 161.0 2.85 4.28 24.80 3.13 25-year 125.5 2.58 4.01 22.64 2.83 10-year 100.9 2.36 3.80 20.88 2.58 2- ear 37.1 1.56 2.96 14.48 1.70 * The flowrates in the column labeled "Flow" were taken from the values calculated in HEC-HMS EXHIBIT D Aggieland Business Park II Hydraflow Pipe Report Pine Design Size = 3 - 42 inch HDPE Pipe Length = 285 ft Slope= 0.50% n-value = 0.012 Capacity (full)= 231.6 cfs Storm Return Period Flow* (cfs) Avg Veloc (ft/s) Depth Up (ft) Depth Dn (ft) HGL Up (ft) HGL Down (ft) 100-year .......192:2...... ~..2 .........2:87........ . 3.50 290.34 289.54 50-year 161.0 6.43 2.57 3.50 290.04 289.54 25-year .......125 :5...... 5 :32........... :34......... 3.5......... ....289; 81..... .......289:54....... 10-year 100.9 4.42 2.23 3.50 289.70 289.54 2-year 37.1 1.72 2.09 3.50 289.56 289.54 * The flowrates in the column labeled "Flow" were taken from the values calculated in HEC-HMS Exhibit E HEC-HMS Pre-Development Analysis Report Project: Aggieland II Simulation Run: Pre 2 yr Start of Run: 01 Jan2007, 00:00 Basin Model: Pre Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 2 yr Compute Time: 26Aug2009, 15:39:03 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 150 0.19780 37.1 01 Jan2007, 14:10 1.31 151 0.10059 14.3 01 Jan2007, 14:00 0.97 152 0.03922 69.8 01 Jan2007, 12:15 4.36 Existing Topo 0.33761 68.9 01 Jan2007, 12:20 1.56 Outfall 0.33761 68.9 01 Jan2007, 12:20 1.56 Project: Aggieland II Simulation Run: Pre 10 yr Start of Run: 01Jan2007, 00:00 Basin Model: Pre Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 10 yr Compute Time: 26Aug2009, 15:38:58 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 150 0.19780 100.9 01 Jan2007, 14:05 3.35 151 0.10059 46.0 01 Jan2007, 13:50 2.79 152 0.03922 115.7 01 Jan2007, 12:15 7.24 Existing Topo 0.33761 156.5 01 Jan2007, 14:00 3.63 Outfall 0.33761 156.5 01 Jan2007, 14:00 3.63 Project: Aggieland II Simulation Run: Pre 25 yr Start of Run: 01 Jan2007, 00:00 Basin Model: Pre Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 25 yr Compute Time: 26Aug2009, 15:39:00 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 150 0.19780 125.5 01 Jan2007, 14:00 4.14 151 0.10059 58.7 01 Jan2007, 13:45 3.51 152 0.03922 131.5 01 Jan2007, 12:15 8.24 Existing Topo 0.33761 190.2 01 Jan2007, 14:10 4.43 Outfall 0.33761 190.2 01 Jan2007, 14:10 4.43 Project: Aggieland II Simulation Run: Pre 50 yr Start of Run: 01 Jan2007, 00:00 Basin Model: Pre Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 50 yr Compute Time: 26Aug2009, 15:39:06 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 150 0.19780 161.0 01 Jan2007, 14:00 5.29 151 0.10059 77.5 01 Jan2007, 13:45 4.58 152 0.03922 153.6 01 Jan2007, 12:15 9.64 Existing Topo 0.33761 236.1 01 Jan2007, 14:20 5.58 Outfall 0.33761 236.1 01 Jan2007, 14:20 5.58 Project: Aggieland II Simulation Run: Pre 100 yr Start of Run: 01 Jan2007, 00:00 Basin Model: Pre Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 100 yr Compute Time: 26Aug2009, 15:38:55 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 150 0.19780 192.2 01 Jan2007, 14:00 6.31 151 0.10059 94.2 01 Jan2007, 13:45 5.54 152 0.03922 172.5 01 Jan2007, 12:15 10.83 Existing Topo 0.33761 285.8 01 Jan2007, 14:15 6.60 Outfall 0.33761 285.8 01 Jan2007, 14:15 6.60 Exhibit F HEC-HMS Post-Development Analysis Report Project: Aggieland II Simulation Run: Post 2 yr Start of Run: 01 Jan2007, 00:00 Basin Model: Post Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 2 yr Compute Time: 08Sep2009, 10:32:05 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 250A 0.18380 34.5 01 Jan2007, 14:10 1.30 250B 0.00759 7.1 01 Jan2007, 12:15 1.89 250C 0.00641 13.9 01 Jan2007, 12:05 4.14 251 0.10059 14.3 01 Jan2007, 14:00 0.97 252 0.03922 69.8 01 Jan2007, 12:15 4.36 Det Pond 0.33761 83.4 01 Jan2007, 12:20 1.62 Jct 1 0.18380 34.5 01 Jan2007, 14:10 1.30 Jct 2 0.19139 35.2 01 Jan2007, 14:20 1.32 Outfall 0.33761 83.4 01 Jan2007, 12:20 1.62 Reach 1 0.18380 34.5 01 Jan2007, 14:20 1.30 Project: Aggieland II Simulation Run: Post 10 yr Start of Run: 01Jan2007, 00:00 Basin Model: Post Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 10 yr Compute Time: 08Sep2009, 10:32:01 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 250A 0.18380 94.1 01 Jan2007, 14:00 3.34 250B 0.00759 16.5 01 Jan2007, 12:10 4.27 250C 0.00641 23.4 01 Jan2007, 12:05 7.01 251 0.10059 46.0 01 Jan2007, 13:50 2.79 252 0.03922 115.7 01 Jan2007, 12:15 7.24 Det Pond 0.33761 156.1 01 Jan2007, 12:20 3.70 Jct 1 0.18380 94.1 01 Jan2007, 14:00 3.34 Jct 2 0.19139 95.6 01 Jan2007, 14:10 3.37 Outfall 0.33761 156.1 01 Jan2007, 12:20 3.70 Reach 1 0.18380 94.1 01 Jan2007, 14:10 3.33 Project: Aggieland II Simulation Run: Post 25 yr Start of Run: 01Jan2007, 00:00 Basin Model: End of Run: 02Jan2007, 00:05 Meteorologic Model: Compute Time: 08Sep2009, 10:32:03 Control Specifications Volume Units: IN Post Dev 25 yr 24 hr duration Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 250A 0.18380 117.0 01 Jan2007, 14:00 4.13 250B 0.00759 19.9 01 Jan2007, 12:10 5.16 250C 0.00641 26.7 01 Jan2007, 12:05 8.00 251 0.10059 58.7 01 Jan2007, 13:45 3.51 252 0.03922 131.5 01 Jan2007, 12:15 8.24 Det Pond 0.33761 186.5 01 Jan2007, 14:10 4.50 Jct 1 0.18380 117.0 01 Jan2007, 14:00 4.13 Jct 2 0.19139 118.8 01 Jan2007, 14:10 4.16 Outfall 0.33761 186.5 01 Jan2007, 14:10 4.50 Reach 1 0.18380 117.0 01 Jan2007, 14:10 4.12 NI Project: Aggieland II Simulation Run: Post 50 yr Start of Run: 01 Jan2007, 00:00 Basin Model: Post Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 50 yr Compute Time: 08Sep2009, 10:32:07 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 250A 0.18380 150.2 01 Jan2007, 14:00 5.28 250B 0.00759 24.7 01 Jan2007, 12:10 6.42 250C 0.00641 31.3 01 Jan2007, 12:05 9.39 251 0.10059 77.5 01 Jan2007, 13:45 4.58 252 0.03922 153.6 01 Jan2007, 12:15 9.64 Det Pond 0.33761 236.0 01 Jan2007, 14:15 5.65 Jct 1 0.18380 150.2 01 Jan2007, 14:00 5.28 Jct 2 0.19139 152.2 01 Jan2007, 14:10 5.31 Outfall 0.33761 236.0 01 Jan2007, 14:15 5.65 Reach l 0.18380 150.1 01 Jan2007, 14:10 5.27 1 Project: Aggieland II Simulation Run: Post 100 yr Start of Run: 01 Jan2007, 00:00 Basin Model: Post Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 100 yr Compute Time: 08Sep2009, 10:31:58 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 250A 0.18380 179.3 01 Jan2007, 14:00 6.30 250B 0.00759 28.9 01 Jan2007, 12:10 7.53 250C 0.00641 35.2 01 Jan2007, 12:05 10.59 251 0.10059 94.2 01 Jan2007, 13:45 5.54 252 0.03922 172.5 01 Jan2007, 12:15 10.83 Det Pond 0.33761 289.2 01 Jan2007, 14:05 6.68 Jct 1 0.18380 179.3 01 Jan2007, 14:00 6.30 Jct 2 0.19139 181.8 01 Jan2007, 14:05 6.33 Outfall 0.33761 289.2 01 Jan2007, 14:05 6.68 Reach 1 0.18380 179.2 01 Jan2007, 14:05 6.28 Project: Aggieland II Simulation Run: Pre 100 yr Reservoir: Existing Topo Start of Run: 01Jan2007, 00:00 Basin Model: Pre Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 100 yr Compute Time: 26Aug2009, 15:38:55 Control Specifications: 24 hr duration Volume Units: IN Computed Results Peak Inflow : 300.92 (CFS) Date/Time of Peak Inflow : 01Jan2007, 13:50 Peak Outflow : 285.82 (CFS) Date/Time of Peak Outflow : 01Jan2007, 14:15 Total Inflow : 6.605 (IN) Peak Storage : 5.6 (AC-FT) Total Outflow : 6.597 (IN) Peak Elevation : 292.05 (FT) Project: Aggieland II Simulation Run: Post 100 yr Reservoir: Det Pond Start of Run: 01Jan2007, 00:00 Basin Model: End of Run: 02Jan2007, 00:05 Meteorologic Model: Compute Time: 08Sep2009, 10:31:58 Control Specifications: Volume Units: IN Computed Results Peak Inflow : 290.56 (CFS) Peak Outflow : 289.19 (CFS) Total Inflow : 6.699 (IN) Total Outflow : 6.676 (IN) Date/Time of Peak Inflow : Date/Time of Peak Outflow Peak Storage : Peak Elevation Post Dev 100 yr 24 hr duration 01Jan2007, 13:55 01 Jan2007, 14:05 3.9 (AC-FT) 292.06 (FT) Drainage Report for Aggieland Business Park II College Station, Texas September, 2009 Developer: 60-Jones, LLC 6161 Imperial Lop, Suite 101 College Station, Texas 77840 (979) 571-4341 Engineer: Civil Development, Ltd. 2033 Harvey Mitchell Parkway South College Station, Texas 77840 (979) 764-7743 ,6P-/F I 2`lj 40 a Executive Summary Report Aggieland Business Park II College Station, Texas September, 2009 ENGINEER Civil Development, Ltd. - Kent Laza, P.E. (klaza@cdlbcs.com) P.O. Box 11929 College Station, Texas 77842 Phone: (979) 764-7743 Fax: (979) 764-7759 OWNER/DEVELOPER 60-Jones, LLC 6161 Imperial Loop, Suite 101 College Station, Texas 77840 Phone: (979) 571-4341 GENERAL This project is located on the northeast corner of Jones Road and FM 60 and is part of the Aggieland Business Park II development project. The site is anticipated to be developed as a convenience store although no formal plans have been developed at this time. The general stormwater plan consists of improving a natural drainage channel that runs through the upper portion of the lot, and the installation of 3-42" storm pipes to carry water through the middle portion of the site where the future buildings and driveways will be located. HYDROLOGIC CHARACTERISTICS & EXISTING CONDITIONS The site has recently been cleared, but the previous land cover was dense brush and trees. The soil is classified as a sandy loam (Soil Group B) by the USGS Soil Maps of Brazos County. The drainage basin that encompasses this property includes a total of about 126 acres as shown in Exhibit A. Runoff from this basin flows in a southerly direction, and enters the property through an existing drainage channel. Immediately downstream of the site is FM 60, which has two box culverts in close proximity to each other to carry the runoff under the roadway. One is a 5'x 5' culvert and the other is a 4'x 2' culvert. A second drainage basin encompassing approximately 64 acres and located immediately adjacent to the first basin also drains to the same crossing point along the TxDOT right-of-way and contributes to the flow under FM 60. A third basin located west of Jones Road and encompassing about 25 acres flows to these culverts along the TxDOT right-of- way as well. Calculations indicate that the two culverts under FM 60 were not designed to pass runoff from these three basins during a 100-yr rainfall event. As a result, water pools upstream of FM 60 and builds up until it flows over the roadway. The roadway serves as a dam and the resulting pool functions as a detention pond upstream of the roadway where the proposed site is located. Under the anticipated development plan, the existing channel through the site will be improved for a length of approximately 160 feet, then be directed into 3-42" storm pipes to pass water through the site. The anticipated development plan will require that the site be raised sufficiently to prevent it from being inundated during heavy rainfall events, but some storage will still be maintained along the channel and immediately adjacent to the TxDOT right-of-way. The analysis that follows takes into account the storage provided by the FM 60 roadway in both the pre- and post-development scenarios. Detention calculations for the post-development scenario were made using assumptions regarding the final grading along the stream and the front of the site. No additional detention facility is planned. Applicable Exhibits: Exhibit A - Drainage Area Map (pre-development conditions) Exhibit B - Drainage Area Map (post-development conditions) CHANNEL DESIGN INFORMATION Design Software Hydraflow Express Extension for Autocad 2010 Manning's n Value: 0.035 (dense grass) Slope: 0.6% Bottom Width: 2 ft Top Width: 30 ft Depth: 3.5 ft Side Slopes: 4:1 Summarv of Channel Designn Analvsis: 100 year flow rate: 192.2 cfs Velocity: 4.47 ft/s Depth: 3.06 ft Top Width: 26.48 ft * The flowrate used for the channel design is taken from 100 year pre-development peak flowrate for Drainage Area 150 in HEC-HMS. This value can be found in Exhibit A. Applicable Exhibits: Exhibit C - Hydraflow Channel Design Report STORM SEWER DESIGN INFORMATION Design Software: Hydraflow Storm Sewer Extension for Autocad 2010 Pipe Size: 42 inch, HPDE Manning's n-value: 0.012 Pipe Length: 285 ft Slope: 0.5% Summary of Storm Sewer Design Analysis. Pipe Capacity: 231.6 cfs 100 year flow rate: 192.2 cfs Velocity: 7.22 ft/s Applicable Exhibits: Exhibit D - Hydraflow Pipe Design Report CONCLUSIONS From the HEC-HMS analysis shown above, we conclude that the FM 60 roadway provides a level of detention resulting from the culvert sizes that were installed when the facility was built. These culverts were not designed to pass the 100-yr event, so we presume that TxDOT anticipated the pooling of runoff upstream of the roadway during large rainfall events. When analyzed under both pre- and post- development scenarios, this detention provides a reduction in runoff from the mid- range storm events, but allows slightly higher peak flows during the 2-yr and 100- yr events. The slightly higher peak flowrate for the 100-yr event represents about a 1% increase from the pre-development scenario, which computes to be 0.01 feet (about 1/8t' of an inch) increase in the water surface elevation over the FM 60 roadway. This is a negligible amount of increase that will have no noticeable impact on downstream properties. As a result, we conclude that additional detention facilities are not necessary for the development of this site. Applicable Exhibits: Exhibit E - HEC-HMS Analysis Report (pre-development conditions) Exhibit F - HEC-HMS Analysis Report (post-development conditions) X o~ 1 '-Iil fig Q_ i o\ IN, 1 151 \ 64. 8 \ 26.6 150 126.6 ACREAGE i LEGEND DRAINAGE AREA LABEL ~'"ate °a'B'r AGGIELAND BUSINESS PARK, II R a A PRE DEVELOPMENT 2U33 M~rve MM1OM1etl P_,wy &wM ColMpe 81~Ibn, Tap new P.C. Sm 11no, Cdw" &m-. T~p. "M DRAINAGE AREA MAP (979)TW-7743 Fp:(9M? -no l og~\ 251 a I LEGEND DRAINAGE AREA LABEL 150 126.6 ACREAGE r s r ~ i ow \ Ap \ l` f19 ~ I i I I I 1 250A 117.64 Al\ r~ EXHIBIT AGGIELAND BUSINESS PARK, II mwm K~ B POST DEVELOPMENT ]p3 C,14g, Stot MbTno,. TahwySONA ° Colbp~ n 77B10 DRAINAGE AREA MAP °~~7~»:~`~:~N 1 7717 EXHIBIT C Aggieland Business Park II Hydraflow Channel Report Channel Desien Bottom Width = 2 Side Slopes = 4:1 Total Depth = 3.5 ft Slope = 0.60% n-value = 0.035 Storm Return Period Flow* (cfs) Depth (ft) Veloc (ft/s) Top Width (ft) Energy (ft) 100-year 192.2 3.06 4.47 26.48 3.37 50-year 161.0 2.85 4.28 24.80 3.13 25-year 125.5 2.58 4.01 22.64 2.83 10-year 100.9 2.36 3.80 20.88 2.58 2-year 37.1 1.56 2.96 14.48 1.70 * The flowrates in the column labeled "Flow" were taken from the values calculated in HEC-HMS EXHIBIT D Aggieland Business Park II Hydraflow Pipe Report Pipe Design Size = 3 - 42 inch HDPE Pipe Length = 285 ft Slope = 0.50% n-value = 0.012 Capacity (full)= 231.6 cfs Storm Return Period Flow* (cfs) Avg Veloc (ft/s) Depth Up (ft) Depth Dn (ft) HGL Up (ft) HGL Down (ft) 100-year 192.2 7.22 2.87 3.50 290.34 289.54 50-year 161.0 6.43 2.57 3.50 290.04 289.54 25-year 125.5 5.32 2.34 3.50 289.81 289.54 10-year 100.9 4.42 2.23 3.50 289.70 289.54 2-year 37.1 1.72 2.09 3.50 289.56 289.54 * The flowrates in the column labeled "Flow" were taken from the values calculated in HEC-HMS Exhibit E HEC-HMS Pre-Development Analysis Report Project: Aggieland II Simulation Run: Pre 2 yr Start of Run: 01Jan2007, 00:00 Basin Model: Pre Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 2 yr Compute Time: 26Aug2009, 15:39:03 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 150 0.19780 37.1 01 Jan2007, 14:10 1.311 151 0.10059 14.3 01 Jan2007, 14:00 0.973 152 0.03922 69.8 01 Jan2007, 12:15 4.357 Existing Topo 0.33761 68.9 01 Jan2007, 12:20 1.563 Outfall 0.33761 68.9 01 Jan2007, 12:20 1.563 Project: Aggieland II Simulation Run: Pre 10 yr Start of Run: 01 Jan2007, 00:00 Basin Model: Pre Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 10 yr Compute Time: 26Aug2009, 15:38:58 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 150 0.19780 100.9 01 Jan2007, 14:05 3.354 151 0.10059 46.0 01 Jan2007, 13:50 2.787 152 0.03922 115.7 01 Jan2007, 12:15 7.244 Existing Topo 0.33761 156.5 01 Jan2007, 14:00 3.633 Outfall 0.33761 156.5 01 Jan2007, 14:00 3.633 Project: Aggieland II Simulation Run: Pre 25 yr Start of Run: 01 Jan2007, 00:00 Basin Model: Pre Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 25 yr Compute Time: 26Aug2009, 15:39:00 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 150 0.19780 125.5 01 Jan2007, 14:00 4.142 151 0.10059 58.7 01 Jan2007, 13:45 3.512 152 0.03922 131.5 01 Jan2007, 12:15 8.241 Existing Topo 0.33761 190.2 01 Jan2007, 14:10 4.425 Outfall 0.33761 190.2 01 Jan2007, 14:10 4.425 Project: Aggieland II Simulation Run: Pre 50 yr Start of Run: 01Jan2007, 00:00 Basin Model: Pre Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 50 yr Compute Time: 08Sep2009, 10:18:25 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 150 0.19780 161.0 01 Jan2007, 14:00 5.290 151 0.10059 77.5 01 Jan2007, 13:45 4.584 152 0.03922 153.6 01 Jan2007, 12:15 9.636 Existing Topo 0.33761 236.1 01 Jan2007, 14:20 5.578 Outfall 0.33761 236.1 01 Jan2007, 14:20 5.578 Project: Aggieland II Simulation Run: Pre 100 yr Start of Run: 01 Jan2007, 00:00 Basin Model: Pre Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 100 yr Compute Time: 26Aug2009, 15:38:55 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 150 0.19780 192.2 01 Jan2007, 14:00 6.307 151 0.10059 94.2 01 Jan2007, 13:45 5.544 152 0.03922 172.5 01 Jan2007, 12:15 10.833 Existing Topo 0.33761 285.8 01 Jan2007, 14:15 6.597 Outfall 0.33761 285.8 01 Jan2007, 14:15 6.597 Project: Aggieland II Simulation Run: Pre 100 yr Reservoir: Existing Topo Start of Run: 01 Jan2007, 00:00 Basin Model: Pre Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 100 yr Compute Time: 26Aug2009, 15:38:55 Control Specifications: 24 hr duration Volume Units: IN Computed Results Peak Inflow : 300.9 (CFS) Peak Outflow : 285.8 (CFS) Total Inflow : 6.605 (IN) Total Outflow : 6.597 (IN) Date/Time of Peak Inflow : Date/Time of Peak Outflow Peak Storage : Peak Elevation 01 Jan2007, 13:50 01 Jan2007, 14:15 5.6 (AC-FT) 292.05 (FT) Exhibit F HEC-HMS Post-Development Analysis Report Project: Aggieland II Simulation Run: Post 2 yr Start of Run: 01 Jan2007, 00:00 Basin Model: Post Dev End of Run: 02Jan2007, 00:05 Meteorologic Model: 2 yr Compute Time: 08Sep2009, 10:32:05 Control Specifications: 24 hr duration Volume Units: IN Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (IN) 250A 0.18380 34.5 01 Jan2007, 14:10 1.305 250B 0.00759 7.1 01 Jan2007, 12:15 1.891 250C 0.00641 13.9 01 Jan2007, 12:05 4.144 251 0.10059 14.3 01 Jan2007, 14:00 0.973 252 0.03922 69.8 01 Jan2007, 12:15 4.357 Det Pond 0.33761 83.4 01 Jan2007, 12:20 1.621 Jct 1 0.18380 34.5 01 Jan2007, 14:10 1.305 Jct 2 0.19139 35.2 01 Jan2007, 14:20 1.324 Outfall 0.33761 83.4 01 Jan2007, 12:20 1.621 Reach 1 0.18380 34.5 01 Jan2007, 14:20 1.300