HomeMy WebLinkAbout02-00500168- 00074718AUTUMN CHASE SUBDIVISION
8.35 ACRE TRACT
1. STORM WATER DETENTION BASIN SIZING:
Rational Method (Q = CIA)
Pre-Development, Ac.: 6.43 1.92 8.35
Area
Description (acres) C C(area)
Grassland 8.35 0.35 2.92
Post-Development
Area
Description
(acres) C C(area)
Landscaping
0.75 0.35 0.26
Impervious Area
7.60 0.90 6.84
8.35 7.10
C(avg) = 7.10 =
8.35
0.85
Frequency
Intensity
Qpost
Vpre
Vpost
Required
(Years)
(in/in) (Tc=10
Cpre
Cpost
Qpre (cfs)
(cfs)
(cf)
(c
Storage
min)
Volume
100
12.6
0.35
0.85
36.82
89.43
33,141
80,486
47,345
50
11.1
0.35
0.85
32.44
78.78
29,196
70,904
41,708
25
9.9
0.35
0.85
28.93
70.27
26,039
63,239
37,199
10
8.6
0.35
0.85
25.13
61.04
22,620
54,935
32,315
5
7.7
0.35
0.85
22.50
54.65
20,253
49,186
28,933
Vol_ (cfl = 1 /3(Aton + Abottom + SORT(Aton x Abottom)) x Depth
Atop (sf)
Abot. (sf)
At x Ab (sf)
Depth (ft)
Volume (cf)
Detention Volume
Res B
10913
4760
51945880
4
30,477
Res A
4528
440
1992320
3.5
7,435
Total
37,912
O.K.
Rational Method 8.37Rev2 Page 1 of 2
AUTUMN CHASE SUBDIVISION
8.35 ACRE TRACT
II. STORM SEWER OUTFALL:
1. ASSUME 30" F.L. IN ON W. SIDE OF CORNELL DRIVE _
2. FALL UNDER STREET: 60 LF @ 0.5% _
3. F.L. OF 30" INTO DETENTION BASIN =
4. FALL ACROSS DET. BASIN: 80 LF @ 0.76% =
5. F.L. OF OUTFALL OUT OF DETENTION BASIN =
6. F.L. OF 36" @ CREEK FOR JACKSON RIDGE _
7. FALL FROM DETION BASIN TO CREEK=
8. DISTANCE FROM DETENTION BASIN TO CREEK =
9. SLOPE FROM DETION BASIN TO CREEK=
III. SIZE OF OUTFALL:
1. ASSUME "n" = 0.014
A. 42" diameter @ 0.096% grade =
B. 48" diameter @ .05% grade=
2. EQUIVALENT RECTANGLES FOR 29 CFS (QPRE)
A. 42" = 9.6 S.F. = 2 FT. x 5 FT. WIDE @ 0.096%
B. 48" =12.6 S.F. = 2 FT. x 6.5 FT. WIDE @ 0.05%
290.20 FT.
-0.30 FT.
289.90 FT.
-0.61 FT.
289.29 FT.
289.00 FT.
0.29 FT.
360 FT.
0.08%
C
0.35 FT.
0.18 FT. O.K.
USE
~as>
Rational Method 8.37Rev2 Page 2 of 2
AUTUMN CHASE SUBDIVISION
8.35 ACRE TRACT
WATER AND SANITARY SEWER USEAGES
1. LAND FOR R2 ZONING:
R2 = 540ft. x 100ft./43,560ft.2/ac. = 1.24ac.
Water Demands:
AVER = 1.24ac. x 2,500gpd/ac. = 3,100gpd
MAXD = 3,100 x 1.7 = 5,300gpd
MAXp = 3,100 x 3.77 = 11,700gpd
Sanitary Sewer:
AVER = 1.24ac. x 2,000gpd/ac. = 2,500gpd
MAXp = 3.0 x 2,500 = 7,500gpd
INF = 0.1 x 2,500 = 300gpd
Total Peak = 7,800gpd
2. LAND FOR R5 ZONING:
R5 = 8.35ac. -(1.24ac. + 0.74ac.) - 0.57ac. (ft. x 60 ft. ROW/ 43,560 ft.2)
R5 = 8.35ac. - 1.92ac. - 0.57ac. = 5.86ac.
Water Demands:
AVER = 5.86ac. x 2,500gpd/ac. = 14,600gpd
MAXD = 14,600 x 1.7 = 24,800gpd
MAXp = 14,600 x 3.77 = 55,000gpd
Sanitary Sewer:
AVER = 5.86ac. x 2,000gpd/ac. = 11,600gpd
MAXp = 3.0 x 11,600 = 34,800gpd
INF = 0.1 X 11,600 = 1,200gpd
Total Peak = 36,000gpd
3. TOTALS FOR 8.35ac.
Water Demands:
AVER = 3,100 + 14,600 = 17,700gpd
MAXD = 5,300 + 24,800 = 30,100gpd
MAXp = 11,700 + 55,000 = 66,700gpd
6"d @ 2fps = 260,000gpd 66,700gpd
water&sewer
1 of 1
i
PARKLAND DEDICATION
PROJECT REVIEW CHECKLIST
Please provide the following information in order for the
Parks and Recreation Board to process your request:
Minimum Submittal Requirements
The proposed street layout of the subdivision;
The location of proposed parkland;
Delineated floodplain;
The location and design of any detention in proposed parkland; and,
The location of any greenway that is part of the approved City of College Station
Greenway Master Plan on proposed parkland dedication.
REQUIREMENT COMPLIANCE
SECTION 10-8.1: Land Dedication
Single-family Dwelling Units: 0
Multi-family Dwelling Units:
Total Land Dedication Requirement: 0.672 Acres
(Single-family: 1 acre per 101 DUs; Multi-family: 1 acre per 125 DUs)
Proposed Dedication: 0.350 Acres
SECTION 10-B.2: Fee in Lieu of Land
Park Acquisition Fee:
Single-family Fee ($198/dwelling unit): $0
Multi-family Fee ($160/dwelling unit): $6,400
Total Acquisition Fee: $6,400
SECTION 10-B.3: Park Development Fee
Park Development Costs:
Single-family Fee ($358/dwelling unit): $0
Multi-family Fee ($292/dwelling unit): $11,680
TOTAL PARKLAND DEDICATION FEE REQUIRED
Acquisition and Development Fee:
Single-family Fee: ($556/dwelling unit): $0
Multi-family Fee ($452/dwelling unit): $18,080
SECTION 10-F: Additional Requirements:
Is land in the 100-year floodplain? No Percentage:
Acreage in floodplain:
0
Percentage:
Acreage in detention: 0.350 Percentage:
Acreage in greenways: 0 Percentage:
Comments:
AUTUMN CHASE SUBDIVISION
8.37 ACRE TRACT
WATER AND SANITARY SEWER USEAGES
1. LAND FOR R2 ZONING:
R2 = 540ft. x 100ft./43,560ft.2/ac. = 1.24ac.
Water Demands:
AVER = 1.24ac. x 2,500gpd/ac. = 3,100gpd
MAXD = 3,100 x 1.7 = 5,300gpd
MAXp = 3,100 x 3.77 = 11,700gpd
Sanitary Sewer:
AVER = 1.24ac. x 2,000gpd/ac. = 2,500gpd
MAXp = 3.0 x 2,500 = 7,500gpd
INF = 0.1 x 2,500 = 300gpd
Total Peak = 7,800gpd
2. LAND FOR R5 ZONING:
R5 = 8.37ac. -(1.24ac. + 0.74ac.) - 0.57ac. (ft. x 60 ft. ROW/ 43,560 ft.2)
R5 = 8.37ac. - 1.98ac. - 0.57ac. = 5.82ac.
Water Demands:
AVER = 5.82ac. x 2,500gpd/ac. = 14,600gpd
MAXD = 14,600 x 1.7 = 24,800gpd
MAXp = 14,600 x 3.77 = 55,000gpd
Sanitary Sewer:
AVER = 5.82ac. x 2,000gpd/ac. = 11,600gpd
MAXp = 3.0 x 11,600 = 34,800gpd
INF = 0.1 X 11,600 = 1,200gpd
Total Peak = 36,000gpd
3. TOTALS FOR 8.37ac.
Water Demands:
AVER = 3,100 + 14,600 = 17,700gpd
MAXD = 5,300 + 24,800 = 30,100gpd
MAXp = 11,700 + 55,000 = 66,700gpd
6"d @ 2fps = 260,000gpd 66,700gpd
. -e
water&sewer.xls Page 1 of 1
AUTUMN CHASE SUBDIVISION
8.37 ACRE TRACT
1. STORM WATER DETENTION BASIN SIZING:
Rational Method (Q = CIA)
Pre-Development, Ac.: 6.43 1.94 8.37
Area
Description (acres) C C(area)
Grassland 8.37 0.35 2.9295
Post-Development
Area
Description
(acres)
C
C(area)
Landscaping
0.75
0.35
0.2637
Impervious Area
7.62
0.9
6.8550
8.37
7.1187
C(avg) =
7.1187
0.85
8.37
i
d
Frequency
(years)
Intensity in/in)
(
(Tc=10min)
Cpre
Cpost
Qpre
(cfs)
Qpost
(cfs)
Vpre
(c~
Vpost
(cfl
re
Requ
Storage
Volume
100
12.6
0.35
0.85
36.91
89.64
33,221
80,678
47,458
808
41
50
11.1
0.35
0.85
32.52
78.97
29,266
71,074
,
25
9.9
0.35
0.85
29.00
70.43
26,102
63,390
37,288
392
32
10
8.6
0.35
0.85
25.19
61.18
22,674
55,066
,
002
29
5
7.7
0.35
0.85
22.56
54.78
20,301
49,303
,
Vol. (cf) = 1/3(Atop + Abottom + SQRT(Atop x Abottom)) x Depth
Atop (sf) Abot. (sf) At x Ab (sf) Depth (ft) Volume (cf)
Detention Volume
13324 6394 85193656
Rational Method 8.37Revl.xls
4 38,559 O.K.
Page 1 of 2
AUTUMN CHASE SUBDIVISION
8.37 ACRE TRACT
H. STORM SEWER OUTFALL:
1.
ASSUME 30" F.L. IN ON W. SIDE OF CORNELL DRIVE =
290.20 FT.
2.
FALL UNDER STREET: 60 LF @ 0.5% _
-0.30 FT.
3.
F.L. OF 30" INTO DETENTION BASIN =
289.90 FT.
4.
FALL ACROSS DET. BASIN: 80 LF @ 0.76% _
-0.61 FT.
5.
F.L. OF OUTFALL OUT OF DETENTION BASIN =
289.29 FT.
6.
F.L. OF 36" @ CREEK FOR JACKSON RIDGE =
289.00 FT.
7.
FALL FROM DETION BASIN TO CREEK:
0.29 FT.
8.
DISTANCE FROM DETENTION BASIN TO CREEK =
360 FT.
9.
SLOPE FROM DETION BASIN TO CREEK:
0.08%
III. SIZE OF OUTFALL:
1. ASSUME "n" = 0.014
A. 42" diameter @ 0.096% grade = 0.35 FT.
B. 48" diameter @.05% grade = 0.18 FT.
2. EQUIVALENT RECTANGLES FOR 29 CFS (QPRE)
A. 42" = 9.6 S.F. = 2 FT. x 5 FT. WIDE @ 0.096%
B. 48" = 12.6 S.F. = 2 FT. x 6.5 FT. WIDE @ 0.05% USE
O.K.
°~SPi!®00~•4p
4. x r'°G~4N JR.
r.:
F~ra_sS..feve•
gJ 0-
Rational Method 8.37Revl.xls Page 2 of 2