Loading...
HomeMy WebLinkAboutApplication (10-277) FOR OFFICE USE ONLY CASE NO.: DATE SU ITTED: V CITY OF COIJ.EGE STATION TIME: Home of Texas A&M University ° STAFF: ZkL FINAL PLAT APPLICATION (Check one) ❑ Minor ❑ Amending ❑X Final ❑ Vacating ❑ Replat ($700) ($700) ($932) ($932) ($932) Is this plat in the ETJ? ❑ Yes ❑x No Is this plat Commercial ❑X or Residential ❑ MINIMUM SUBMITTAL REQUIREMENTS: ❑x $700-$932 Final Plat Application Fee (see above). ❑ $233 Variance Request to Subdivision Regulations Fee (if applicable). ❑x $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). N Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. Please attach pages if additional information is provided. 0 Fourteen (14) folded copies of plat. (A signed mylar original must be submitted after approval.) ❑x Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. ❑x Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). ❑ Copy of original deed restrictions/covenants for replats (if applicable). [_x] Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate current within ninety (90) days. The report must include applicable information such as ownership, liens, encumbrances, etc. 0 Paid tax certificates from City of College Station, Brazos County and College Station I.S.D. 0 The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not. NOTE: A mylar of the approved preliminary plat must be on file before a final plat application will be considered complete. If the mylar is submitted with the final plat application, it shall be considered a submittal for the preliminary plat project and processed and reviewed as such. Until the mylar has been confirmed by staff to be correct, the final plat application will be considered incomplete. Date of Optional Preapplication or Stormwater Management Conference NAME OF PROJECT Callaway-Jones Funeral Home ADDRESS Harvey Mitchell Parkway S., College Station, Texas SPECIFIED LOCATION OF PROPOSED PLAT: I The site is located approximately 1,000 feet south of the intersection of Harvey Mitchell Pkwy (F. M. 2818) and F&B Rd. APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Cody Jones E-mail cjones@callawayjones.com Street Address 3001 S. College Ave. City Bryan State Texas Zip Code 77801 Phone Number 979-823-3717 Fax Number 10/10 Page 1 of 9 PROPERTY OWNER'S INFORMATION (All owners must be identified. Please attach an additional sheet for multiple owners): Name CalJo, Inc. E-mail cjones@callawayjones.com Street Address 3001 S. College Ave. City Bryan State Texas Zip Code 77801 Phone Number 979-822-3717 Fax Number ARCHITECT OR ENGINEER'S INFORMATION: Name J. Dale Browne, Jr., P.E. I McClure & Browne Engr./Surv., Inc. E-mail dbrowne@mcclurebrowne.com Street Address 1008 Woodcreek Drive, Suite 103 City College Station State Texas Zip Code 77845 Phone Number 979-693-3838 Fax Number 979-693-2554 Do any deed restrictions or covenants exist for this property? Yes El No ❑x Is there a temporary blanket easement on this property? If so, please provide the Volume and Page No. Total Acreage 5.633 AC Total No. of Lots 2 R-O-W Acreage 0.487 Existing Use Undeveloped Proposed Use Commercial Number of Lots By Zoning District 2 / C-2 Average Acreage Of Each Residential Lot By Zoning District: Floodplain Acreage None Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? F Yes F No A statement addressing any differences between the Final Plat and Preliminary Plat (if applicable): one Requested variance to subdivision regulations and reason for same (if applicable): None Regarding the variance request, explain how: 1. There are special circumstances or conditions affecting the land involved such that strict application of the subdivision regulations will deprive the applicant of the reasonable use of his land. NIA 2. The waiver is necessary for the preservation and enjoyment of a substantial property right of the applicant. NIA 10/10 Page 2 of 9 3. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other property in the area, or to the City in administering subdivision regulations. /A 4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in accordance with the provisions of the Unified Development Ordinance. NIA Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable): r An alternative pedestrian way or multi-use path has been or will be provided outside the right-of-way; F The presence of unique or unusual topographic, vegetative, or other natural conditions exist so that strict adherence to the sidewalk requirements of the UDO is not physically feasible or is not in keeping with the purposes and goals of the LIDO or the City's comprehensive Plan; F A capital improvement project is imminent that will include construction of the required sidewalk. Imminent shall mean the project is funded or projected to commence within twelve (12) months; F The proposed development is within an older residential subdivision meeting the criteria in Platting and Replatting within Older Residential Subdivisions Section of the UDO; or F The proposed development contains frontage on a Freeway / Expressway as designated by Map 6.6, Thoroughfare Plan - Functional Classification, in the City's Comprehensive Plan. Detailed explanation of condition identified above: Exemption from participation in the sidewalk fund was granted, Internal Connectivity met as outlined in Sect. 7.9.E.4.c. NOTE: A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the same time by the Planning & Zoning Commission. 10/10 Page 3 of 9 Requested Oversize Participation n/a Total Linear Footage of Parkland Dedication due prior to filing the Final Plat: Proposed Public: ACREAGE: Streets n/a No. of acres to be dedicated + $ n/a development fee ~ Sidewalks n/a No. of acres in floodplain 0 Sanitary Sewer Lines n/a No. of acres in detention ~ Water Lines n/a No. of acres in greenways 0 Channels 0 Storm Sewers OR 0 Bike Lanes / Paths FEE IN LIEU OF LAND: n/a No. of SF Dwelling Units X $ n/a $ n/a n/a (date) Approved by Parks & Recreation Advisory Board NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true, correct, and complete. IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application must be accompanied by proof of authority for the company's representative to sign the application on its behalf. LIEN HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as described above. i -1 PTT l2 - o Sign urea d title Date 10/10 Page 4 of 9 Requested Oversize Participation n/a Total Linear Footage of Parkland Dedication due prior to filing the Final Plat: Proposed Public: 396 Streets ACREAGE: 255 n/a No. of acres to be dedicated + $ n/a development fee Sidewalks n/a No. of acres in floodplain 0 Sanitary Sewer Lines n/a No. of acres in detention ~ Water Lines n/a No. of acres in greenways 0 Channels 0 Storm Sewers OR 0 Bike Lanes / Paths FEE IN LIEU OF LAND: n/a No. of SF Dwelling Units X $ n/a $ n/a n/a (date) Approved by Parks & Recreation Advisory Board NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true, correct, and complete. IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application must be accompanied by proof of authority for the company's representative to sign the application on its behalf. LIEN HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as described above. / Pk S brN 0 -1`7 40I0 Signature an title Date 10/10 Page 4 of 9 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re-issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. 1, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPM E MIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCU . Property Owners Date Engineer Certification: To the best of my knowledge, information and belief: 1. The project plans include an initial erosion control plan that addresses stormwater mitigation, and includes a statement that stipulates stormwater mitigation features should be constructed first in the construction sequence. 2. The initial erosion control plan shown in the construction plans is in compliance with Local, State and Federal requirements, and the design does not preclude compliance with TPDES: (i.e. projects over 10 acres may require a sedimentation basin.) As the Engineer, I acknowledge that it is the responsibility of the Owner/Contractor to comply with Local, State and Federal permits pertaining to stormwater mitigation. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 4. 1, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND A TE. ngineer Date 10110 Page 5 of 9