Loading...
HomeMy WebLinkAboutResponse to CommentsRESPONSE TO STAFF REVIEW COMMENTS NO. 1 Project: SPRING CREEK GARDENS PH 3 (FP-REPLAT) - (10-00500156) PLANNING 1) Please remove the solid line separating the portion of Lot 1 that is zoned PDD from the portion zoned A-P. The line has been removed. 2) Please revise the "Certificate of Ownership and Dedication" to include the new lot numbers and both block numbers. The "Certificate of Ownership and Dedication" has been revised to include the new lot numbers and both block numbers. 3) Please remove zoning information and ownership been removed from all lots on the replat. All zoning and ownership information has 4) Please revise the line table for the replat so that the line segments are in order. The line table has been revised so that the line segments are in order. 5) Please note that any changes made to the plans, that have not been requested by the City plans. not been made aware of will College Station, mcha a on these plans that the City lhasl plans. Any additional ges constitute a completely new review. Noted. The plat call along the back side of Block 2, Lots 24-28 has been corrected on the replat to match the original plat. ENGINEERING COMMENTS NO. 1 1) Please label the 5.5 feet at the rear of Lot 34, 35 & 36 as a PUE. The 5.5 feet at the rear of Lots 34-36 has been labeled as a PUE. 2) The "scale" legend does not match 1 to 50. The scale has been corrected. lo~t~ 11 -10 q1.0c) Ac-.,