HomeMy WebLinkAboutEmails
Page 1 of 2
Lauren Hovde - Re: 11A FP
From: Stewart Kling <stewart@klingeng.com>
To: Lauren Hovde <Lhovde@cstx.gov>
Date: 11/23/2010 10:55 AM
Subject: Re: 11A FP
That is correct. Thanks.
On 11/23/2010 10:44 AM, Lauren Hovde wrote:
So you don't want this plat to go to the December 2nd P&Z meeting?
Lauren
Lauren Amelia Hovde '06
Staff Planner
Planning & Development Services Department
979-764-3570
>>> Stewart Kling <stewart@klingeng.com> 11/23/2010 10:42 AM >>>
Lauren,
That is correct. As you are aware, the plat as currently submitted creates a 63' wide PUE
across the entire frontage of Lot 7 and a 40' PUE across the entire frontage of Lot 8. This
will require that the monument signs be located outside of these PUE's which is
undesirable. The design team is evaluating options and anticipates a final plat re-submittal
during the week of November 29th. Please let me know if you have any questions.
Stewart
On 11/22/2010 4:54 PM, Lauren Hovde wrote:
Stewart,
I haven't seen 11A come back in. Can you let me know that the status?
Lauren
Lauren Amelia Hovde '06
Staff Planner
Planning & Development Services Department
979-764-3570
file://C:\Documents and Settings\lhovde\Local Settings\Temp\XPgrpwise\4CEB9DA6Cit...11/23/2010
Page 2 of 2
--
Kling Engineering & Surveying
4101 S. Texas Ave. Suite A
Bryan, TX 77802
(979)846-6212 - PH
(979)846-8252 - FAX
--
Kling Engineering & Surveying
4101 S. Texas Ave. Suite A
Bryan, TX 77802
(979)846-6212 - PH
(979)846-8252 - FAX
file://C:\Documents and Settings\lhovde\Local Settings\Temp\XPgrpwise\4CEB9DA6Cit...11/23/2010