Loading...
HomeMy WebLinkAboutEmails Page 1 of 2 Lauren Hovde - Re: 11A FP From:   Stewart Kling <stewart@klingeng.com> To:   Lauren Hovde <Lhovde@cstx.gov> Date:   11/23/2010 10:55 AM Subject:   Re: 11A FP   That is correct.  Thanks. On 11/23/2010 10:44 AM, Lauren Hovde wrote: So you don't want this plat to go to the December 2nd P&Z meeting?   Lauren   Lauren Amelia Hovde '06 Staff Planner Planning & Development Services Department 979-764-3570 >>> Stewart Kling <stewart@klingeng.com> 11/23/2010 10:42 AM >>> Lauren, That is correct.  As you are aware, the plat as currently submitted creates a 63' wide PUE across the entire frontage of Lot 7 and a 40' PUE across the entire frontage of Lot 8.  This will require that the monument signs be located outside of these PUE's which is undesirable.  The design team is evaluating options and anticipates a final plat re-submittal during the week of November 29th.  Please let me know if you have any questions. Stewart On 11/22/2010 4:54 PM, Lauren Hovde wrote: Stewart,   I haven't seen 11A come back in.  Can you let me know that the status?   Lauren     Lauren Amelia Hovde '06 Staff Planner Planning & Development Services Department 979-764-3570 file://C:\Documents and Settings\lhovde\Local Settings\Temp\XPgrpwise\4CEB9DA6Cit...11/23/2010 Page 2 of 2 -- Kling Engineering & Surveying 4101 S. Texas Ave. Suite A Bryan, TX 77802 (979)846-6212 - PH (979)846-8252 - FAX -- Kling Engineering & Surveying 4101 S. Texas Ave. Suite A Bryan, TX 77802 (979)846-6212 - PH (979)846-8252 - FAX file://C:\Documents and Settings\lhovde\Local Settings\Temp\XPgrpwise\4CEB9DA6Cit...11/23/2010