Loading...
HomeMy WebLinkAbout02-00500157- 00074416CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM July 29, 2002 TO: Greg Taggart, Municipal Development Group, Via fax 693-4243 FROM: Bridgette George, Assistant Development Manager SUBJECT: CALLAWAY HOUSE PARKINGS (PP) - Preliminary Plat Staff reviewed the above-mentioned preliminary plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Monday, August 5, 10:00 a.m. to be placed on the next available Planning and Zoning Commission meeting scheduled for August 15, 2002, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Ten (10) copies of the revised preliminary plat; and, One (1) Mylar original of the revised preliminary plat. One (1) copy of the digital file of the preliminary plat on diskette or e-mail to nmanhart@ci.college-station.tx.us Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Michael Orsak, SHP Callaway Land, LP, Via fax 512-479-4067 Case file #02-00500157 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: CALLAWAY HOUSE PARKINGS (PP) - (02-00500157) PLANNING 1. Please show owner information in the Title Block 2. Please call out the (2-ft.) topography intervals. Reviewed by: Jennifer Flanery/Jennifer Reeves Date: 07-29-02 ENGINEERING 1. Survey information is inaccurate. Please make all calls, distances and directions, clear and accurate. 2. The Comprehensive Plan shows Marion Pugh as a Major Collector. ROW for a Major Collector 70-ft. Due to the fact that the existing ROW is 60-ft, you will be required to donate Y2 of the needed ROW. Reviewed by: Spencer Thompson Date: July 29, 2002 ELECTRICAL 1. Developer installs conduit as per city specs and design. 2. Developer pours transformer pad as per city specs and design. 3. Developer provides temp blanket easement for construction purposes. 4. Developer provides upon completion of project meets and bounds descriptive easements for all electric lines. 5. Developer provides digital site plan in AutoCAD 2000i. Email site plan to rbolin -ci.college-station.tx.us. 6. Developer load data for project. Reviewed by: Ronnie Bolin Date:7-25-02 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2 STAFF REVIEW COMMENTS NO. 2 Project: CALLAWAY HOUSE PARKINGS (PP) - 02-00500157 ENGINEERING 1. Show 6" water line along the front of the property. Reviewed by: Jennifer Flanery Date: August 6, 2002 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2 Commission Action Options: The Commission has final authority over the preliminary plat. The options regarding the preliminary plat are: ■ Approval with conditions; ■ Approval as submitted; ■ Denial; ■ Defer action only at applicant's request; or, ■ Table only at applicant's request. Supporting Materials: 1. Location Map 2. Application 3. Infrastructure and Facilities 4. Copy of Preliminary Plat 5. Section 7.17 District M-2 Heavy Industrial, College Station Zoning Ordinance 6. Staff Comments #2 INFRASTRUCTURE AND FACILITIES Water required for plat: No, 6" water existing along frontage. Water Service: Service will be taken from 6" main. Sewer required for plat: No, sewer main along rear of property. Sewer Service: Service will be taken from main in rear. Street(s) required for plat: No, however Marion Pugh is shown on the Thoroughfare Plan as a major collector requiring 70-ft of ROW. It appears that there is 60-ft existing ROW. This plat requires an additional 5-ft of ROW dedication. Streets/Access: The property fronts on and has access to Marion Pugh. There exists a joint access easement with McDonalds. Any other access to this property must meet the Driveway Ordinance. Off-site Easements required for plat: None known at this time. Drainage: A Development Permit is required for development of this site. It appears the site could drain to the rear along the railroad ROW or to the front into the City storm system. Flood Plain: The property is not located within the 100-year flood plain. Oversize request: None. Impact Fees: None. Parkland Dedication Fees: None, if developed as a parking lot. If the site redevelops as "dwelling units", parkland would be required.