MEMORANDUM
July 29, 2002
TO: Randy Lee, Via fax 694-3130
FROM: Bridgette George, Assistant Development Manager
SUBJECT: BUGBLASTERS ADDITION (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested but had to stop review. The
following page is a list of staff review comments detailing items that need to be
addressed. Please address the comments and submit the following information for
further staff review:
Two (2) revised site and landscaping plans.
If there are comments that you are not addressing with the revised site plan, please
attach a letter explaining the details. If you have any questions or need additional
information, please call Jennifer Reeves at 764-3570.
Attachments: Staff review comments
cc: Garrett Engineering, Via fax 846-3094
Case file #02-00500155
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: BUGBLASTERS ADDITION (SP) - 02-00500155)
THIS IS A STOP REVIEW: Items that need to be addressed may affect the layout
of the site. The following comments do not constitute a full site plan review.
PLANNING
1. Please show the sizes of the existing water/sewer lines.
2. Staff has concerns about the proposed parking configuration. The vacant space
between parking spaces 15 & 16, and to the west of 19, will require end islands at
the end of parking rows. With this configuration, staff has concerns about the safety
aspect of parked cars in 15, 16 & 19 with vehicles pulling in and out of these two
bays. We would consider a minimum 3-ft. raised island with enhanced concrete or
brick pavers in place of the required end islands.
3. The Fire Lane can only go 100-ft. into the site without a turn around. It appears that
you will not be meeting the distance requirement if you did back it up 100-ft. This will
require you to bring both 30-ft access easements up to full compliance to fire lane
standards. (Per Jon Mies - Fire Marshal 764-3781)
4. The plan shows a pad 12 feet by 6 feet for a "300 gallon metal container". We need
a 12 foot by 12 foot (inside dimension) FEL enclosure here. Also we need some
form of turn around area, as in the present configuration, the truck would have to
back out "blind" onto Longmire. ( Per Pete Caler - Sanitation Superintendent 764-
3841)
5. Please show meter location. Meters must be located within a utility easement or
ROW.
6. Please show Fire Department Connection
7. Please show curb and pavement detail.
LANDSCAPE
1. In the required buffer, the trees must be a minimum of 2" caliper canopy trees. The
buffer ordinance does not allow for the exchange of non-canopy trees for canopy.
2. Please delineate the caliper of all proposed and existing trees in the
land scape/streetscape legend.
3. Please note on the landscape plan that an irrigation plan must be approved prior to
CO.
Reviewed by: Jennifer Reeves Date: 07-26-02
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 2 of 3
ENGINEERING
1. No comments at this time.
Reviewed by: Spencer Thompson
Date: July 26, 2002
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
5. Developer provides digital AutoCAD 2000i version of plat and/or site plan.
email to rbolin(a~-ci.college-station.tx.us
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction
purposes.
8. Developer provides easements for electric infrastructure as installed for
electric lines (including street lights).
Reviewed by: Ronnie Bolin Date:7-25-02
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker or
Reduced Pressure Principle Back Flow Device and installed as per City Ordinance
2394.
2. All BackFlow devices must be installed and tested upon installation as per City
Ordinance 2394.
Reviewed by: Rob Werley
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.