HomeMy WebLinkAboutApplication (2)(*0F4"
CITY OF COLLF,GI✓ Srkl'ION
Home of lixas ABM University`
FOR
CASE NO.:
DATE
TIME:
STAFF:
DESIGN REVIEW BOARD APPLICATION
APPEALS & WAIVERS - GENERAL
MINIMUM SUBMITTAL REQUIREMENTS:
❑x $350 Design Review Board Application Fee.
❑x Application completed in full. This application form provided by the City of College Station must be used
and may not be adjusted or altered. Please attach pages if additional information is provided.
N/® Ten (10) samples of the proposed color (if applicable).
❑x Additional materials may be required of the applicant such as material samples, elevations, site plans, and
landscaping plans. The applicant shall be informed of any extra materials required.
Date of Optional Preapplication Conference 1162010
NAME OF PROJECT Spring Creek Office & Storage
ADDRESS Decatur Drive
LEGAL DESCRIPTION (Lot, Block, Subdivision) Block 3 Lot 1 Spring Creek Gardens - Phase 3
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name Dusty Phillips - 3-D Development
Street Address 4490 Castlegate Drive
City College Station
Phone Number 979-690-7250
E-mail n/a
PROPERTY OWNER'S INFORMATION:
Fax Number
Zip Code 77845
979-690-1041
Name Spring Creek CS Development, LTD E-mail wallace.phillips@verizon.net
Street Address 4490 Castlegate Drive
City College Station State Tx Zip Code 77845
Phone Number 979-690-7250 Fax Number 979-690-1041
Current zoning PDD
APPEAUWAIVER REQUESTED (circle one):
❑ Buffer Requirements ❑ Driveways
❑ WPC Parking ❑ Krenek Tap Corridor Overlay District
❑X Site Plan Review Criteria ❑ Other
Applicable ordinance section being appealed/seeking waiver from:
Section 7.9.8.3. a. an ectlon .
Explanation of appealtwaiver request:
IThe Developer is requesting the use o alternate ui ing materials to meet the stone requirements or the building
acades and to use more than 20.16 metal paneling on the west facade of the building.
State Tx
10110 Page 1 of 2
GENERAL APPEALSMAIVER REQUEST
1. The followina specific alternative to/waiver from the ordinance is requested:
2. The unnecessary hardship(s) involved by meeting the provisions of the ordinance other than financial hardship
is/are-
3. The following alternatives to the requested appeat/waiver are possible:
use of typical masonry matena►S ►S not aeS►reo Tor trll5 Du►IQITIy UC(:dUSC V► It It; VVCGnual Uan 10yc w urc IUl
proposed materials can be easily maintained or replaced, while masonry materials could require additional
rtenance and would be hard to replace or repair to match the original color of the material or mortar.
IN ADDITION, FOR ALTERNATIVE MATERIALS IN THE KRENEK TAP OVERLAY DISTRICT, ANSWER THE
FOLLOWING AS APPLICABLE (see the Unified Development Ordinance Section 5.8 Overlay Districts for more
information):
1- For existina buildings, describe existing facade materials.
9 Fnr new construction. describe how this material(s) meet or exceeds the material standards for the KTO.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true,
correct, and complete.
Signature an title
C1- 3--10
Date
10/10 Print Form Page 2 of 2
1. The following specific alternative to/waiver from the ordinance is requested:
Request the use of Rigid Rock Material as a building material on the facade of the building in lieu of the
materials listed in section 7.9.B.3.a. Also, request the use of "Stuccolite" pre-finished metal panels on
the facades of the buildings and this material be allowed for meeting the minimum stone requirements.
Request the use of metal siding for more than 20% of the west facade. This facade cannot be seen from
a Right-of-way and there is a 6' high screen wall with landscaping along the property line with the
adjacent residential lots.
2. The unnecessary hardship(s) involved by meeting the provisions of the ordinance other
than financial hardship is/are:
The proposed use is primarily for self-storage which are typically all metal construction. The
proposed facade materials are the most practical for this use.
• Stucco applied on these panels in the factory has a 20 year warranty. The stucco applied on site
by conventional methods does not have a warranty.
• Rigid Rock will move and flex with the building. Stone or brick on a brick ledge will contract and
expand at different rates which will lead to cracking and water proofing problems.