Loading...
HomeMy WebLinkAbout10-00500196- 00074209CITY OF COLLf?.GE STATION Home of Texas AdM University' C FINAL PLAT APPLICATION FOR OFFIC~ SE ONLY CASE NO.: DATE SUBMI ED. '10 . 10 TIME: STAFF: (Check one) ❑ Minor ❑ Amending ❑ Final ❑ vacating ❑Replat ($500.00) ($500.00) ($668.00) ($668.00) ($668.00) Is this plat in the ETJ? ❑ Yes R No Is this plat Commercial ❑ or Residential ❑X MINIMUM SUBMITTAL REQUIREMENTS: ❑X $500-$668 Final Plat Application Fee (see above). ❑ $167 Variance Request to Subdivision Regulations Fee (if applicable). ❑ $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 0.75% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). ❑x Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. Please attach pages if additional information is provided. ❑x Fourteen (14) folded copies of plat. (A signed mylar original must be submitted after approval.) ❑ Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. ❑ Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). ❑ Notice of Intent (NOI) if disturbed area is greater than five (5) acres cumulatively. ❑ Copy of original deed restrictions/covenants for replats (if applicable). ❑x Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate current within ninety (90) days. The report must include applicable information such as ownership, liens, encumbrances, etc. 0 Paid tax certificates from City of College Station, Brazos County and College Station I.S.D. FxJ Proof of parkland dedication consideration by the Parks & Recreation Board or Parks & Recreation Department (if applicable). ❑X The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not. NOTE: A mylar of the approved preliminary plat must be on file before a final plat application will be considered complete. If the mylar is submitted with the final plat application, it shall be considered a submittal for the preliminary plat project and processed and reviewed as such. Until the mylar has been confirmed by staff to be correct, the final plat application will be considered incomplete. Date of Optional Preapplication or Stormwater Management Conference Not Applicable NAME OF PROJECT t*- pvtib onl ~Ufa~IvlSlo~.t ADDRESS 115 Sterling Street SPECIFIED LOCATION OF PROPOSED PLAT: APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name RME Consulting Engineers (c% Rabon Metcalf) E-mail rabon@rmengineer.com Street Address P.O. Box 9253 City College Station Phone Number (979) 764-0704 State TX Zip Code 77842 Fax Number (979) 764-0704 1110 Page 1 of 7 PROPERTY OWNER'S INFORMATION (ALL owners must be identified. Please attach an additional sheet for multiple owners): Name DH Properties, LLC (c/o Glenn Hudson) E-mail ghudson@sunbelt-graphics.com Street Address 2020 Oakwood Trail City College Station State TX Zip Code 77845 Phone Number (979) 218-1858 Fax Number ARCHITECT OR ENGINEER'S INFORMATION: Name Same As Applicant E-mail Street Address City State Zip Code Phone Number Fax Number Do any deed restrictions or covenants exist for this property? Yes ❑ No ❑x Is there a temporary blanket easement on this property? If so, please provide the Volume and Page No. Total Acreage 0.248 Total No. of Lots 2 R-O-W Acreage 0.00 Existing Use Vacant Proposed Use Single-Family Residential Number of Lots By Zoning District 2 / R-1 / l Average Acreage Of Each Residential Lot By Zoning District: 0.109 / R-1 Floodplain Acreage 0_0 Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? F- Yes F No ~ statement addressing any differences between the Final Plat and Preliminary Plat (if applicable): lone tequested variance to subdivision regulations and reason for same (if applicable): Jone Regarding the variance request, explain how: 1. There are special. circumstances or conditions affecting the land involved such that strict application of the subdivision regulations will deprive the applicant of the reasonable use of his land. 2. The waiver is necessary for the preservation and enjoyment of a substantial property right of the applicant. 1/10 Page 2 of 7 O O 3. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other property in the area, or to the City in administering subdivision regulations. 4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in accordance with the provisions of the Unified Development Ordinance. Requested Oversize Participation. Total Linear Footage of Proposed Public: Streets Sidewalks Sanitary Sewer Lines Water Lines Channels Storm Sewers Bike Lanes / Paths Parkland Dedication due prior to filing the Final Plat: ACREAGE: No. of acres to be dedicated + $ development fee No. of acres in floodplain No. of acres in detention No. of acres in greenways OR FEE IN LIEU OF LAND: f j'O' ZI f z,921 No. of SF Dwelling Units X $ 6rO $ 0 (date) Approved by Parks & Recreation Advisory Board NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true, correct, and complete. IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY, this application must be accompanied by a power of attorney statement f tom the he owner owner. of cothere is more mpany, the company, than one owner, all owners must sign the application or the power of attorney. licati on its application must be accompanied by proof of authority for the company's representative to sign the app behalf. LIEN HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as described above. Propu-47,6 04 -7 1 2-o Sig ature and title Date Page 3 of 7 1/10 in CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re-issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOP 7RMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURA E Property Owner(s) Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 4. I, THE ENGINEER, AGREE TO ND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT P MIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. Engineer 1/10 ~o Date Page 2 of 4 n The following CERTIFICATIONS apply to development in Special Flood Hazard Areas. Required for Site Plans, Final Plats, Construction Plans, Fill I Grading Permits, and Clearing Only Permits:* A. I, Rabon A. Metcalf, P.E. certify, as demonstrated in the attached drainage study, that the alterations or development covered by this permit, shall not: (i) increase the Base Flood elevation; (ii) create additional areas of Special Flood Hazard Area; (iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor (v) increase Base Flood velocities. beyond those areas exempted by ordi nce in Section 5.11.3a of Chapter 13 Code of Ordinances. Date Engineer Initial * If a platting-status exemption to this requirement is asserted, provide written justification under separate letter in lieu of certification. Required for Site Plans, Final Plats, Construction Plans, and Fill I Grading Permits: B. I, , certify to the following: (i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm. Engineer Date Additional certification for Floodway Encroachments: C. I, Not Applicable , certify that the construction, improvement, or fill covered by this permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments. Engineer Date Page 3 of 4 1/10 h Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate required). Residential Structures: D. I, Not Applicable , certify that all new construction or any substantial improvement of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-pour) and post construction. Engineer / Surveyor Date Commercial Structures: E. I, Not Applicable , certify that all new construction or any substantial improvement of any commercial, industrial, or other non-residential structure are designed to have the lowest floor, including all utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation Engineer / Surveyor Date OR I, , certify that the structure with its attendant utility, ductwork, basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities, ductwork, basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the hydrostatic and hydrodynamic conditions. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. Engineer / Surveyor Date Conditions or comments as part of approval: 1/10 Page 4 of 4