MEMORANDUM
TO: Dale Browne, Ash & Browne Engineering, via fax 846-8914
FROM: Bridgette George, Assistant Development Manager
SUBJECT: STOP AND STORE MINI-STORAGE (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page
is a list of staff review comments detailing items that need to be addressed. The
next submittal will be the third and final review by staff for this round of reviews.
If all items have not been addressed on the next submittal, another $100
processing fee will need to be submitted for the subsequent set of three (3)
reviews. Please address the comments and submit the following information for
further staff review:
OR
Two (2) complete sets of construction documents for the proposed
development with the revised site and landscaping plans attached.
Two (2) revised site and landscaping plans.
If there are comments that you are not addressing with the revised site plan,
please attach a letter explaining the details. If you have any questions or need
additional information, please call me at 764-3570.
Attachments: Staff review comments
Case file #02-00500147
cc: Marek Brothers Construction, Pat Marek, P.O. Box 9715 College Station,
TX 77842-7715
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 2
Project: STOP AND STORE MINI-STORAGE (SP) - 02-00500147
PLANNING
1. The separation distance between Live Oaks is a minimum of 35-feet. To
retain the same Landscape layout, you may replace the Live Oaks with
another approved species of canopy tree.
2. The buffer ordinance requires a shrub every 3-feet along the property line.
Divide the length of the eastern property line by 3 to get the required number
of shrubs for the eastern buffer.
3. Please define the material used for the "privacy fence" along the southern
side of the property.
4. Please indicate the location of the gate in the southern fence.
5. Please include a note on the site plan that the arrows that show the drive
aisle is one way painted on the ground.
6. Please note on the plan that a KNOX BOX, for fire protection, must be
provided on any gate that restricts access to the site.
Reviewed by: Jennifer Flanery Date: August 19, 2002
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review.
2 of 2
NOTE TO FILE
Re: Staff Review #2
As per the meeting held with the developers on 8-7-09,, on the next submittal will have
to meet the planning comments as follows:
STAFF REVIEW COMMENTS NO. 1
Project: STOP AND STORE MINI-STORAGE (SP)-SITE PLAN - COMMERCIAL
(02-147)
PLANNING
FYI: Pages 1, 2, and 3 were considered as the site plan.
This is a stop review. Because the buffer requirement was not addressed, and the site
plan may change in an effort to meet ordinance requirements, staff will make a
complete review of the next submittal. The following comments are provided to help the
applicant make a more complete submittal.
This project will have to meet the new buffer ordinance (Section 8.10 of the Zoning
Ordinance). Please include this in the site plan. Buffer areas may be excluded from
the total site area when calculating the landscaping point requirement.
There is no buffer required on the western property line. There will be a 10- or
15- foot planted buffer the entire length of the eastern property line. There will
be a solid fence along the southern edge of the development, but they should
have a gate so they may access the back of the property. The majority of the
back area has to be barricaded. They will need to do a little work for drainage
from the detention pond to the creek, but everything else (trees, shrubs,
anything that provides a visual buffer) should be fenced. They have been told
that a metal fence with slats will not be accepted.
2. Parking spaces 5 and 6 will have to be relocated. Because of limited sight distances
and proximity to the entrance, these spaces will create unsafe conditions.
These spaces may remain, but the island against the building will have to be a
minimum of 180 sq.ft., the plantings on the island will have to be pushed to the
front of it so they do not interfere with what little a site triangle they will have,
they can not get into the required 55-ft. throat depth, and a note is made that
the arrows that show the drive aisle is one way is painted on the ground.
3. All parking spaces must be a minimum of 18 feet long with a 2-foot overhang or 20
feet long with no overhang.
Ignore this. I couldn't find the reason I had made this comment.
4. Please describe the treatment of the parking islands at the back of the property.
They are required to be planted or treated with enhanced paving.
This is standard stuff.
5. Please verify that you will be removing the existing easements near the eastern and
southern property lines.
This is standard stuff. Ask Spencer if you have questions.
6. The dumpster enclosure needs to be an 8-foot wooden fence.
This is standard stuff.
7. Please amend General Note #8 to include that the irrigation will be approved prior to
C.O.
This is standard stuff.
8. Will the project have security gates? If so, please show their location and swing
path.
Supposedly they are going to put gates where the western and eastern
buildings line up (ask Natalie if you have questions). This location is okay,
just make sure the gates go up and they provide a knox box.
Reviewed by: Molly Hitchcock Date: July 22, 2002
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
November 25, 2003
TO: Pat and Joe Marek, Via fax 696.3089 `Z
FROM: Bridgette George, Assistant Development Manager
SUBJECT: STOP AND STORE MINI-STORAGE (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. Please address the
comments and submit the following information for further staff review:
$200 processing fee for the next round of three (3) staff reviews; and,
One (1) revised site and landscaping plan.
If there are comments that you are not addressing with the revised site plan, please
attach a letter explaining the details. If you have any questions or need additional
information, please call Lauren Harrell at 764.3570.
Attachments: Staff review comments
cc: Case file #02-00500147
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 3
Project: STOP AND STORE MINI-STORAGE (SP) - 02-00500147
LANDSCAPE/STREETSCAPE
This is a stop review. The minimum requirements of a landscape plan have not been
provided, and this does not constitute a complete review.
I~Ixi Please show the entire site plan, indicating all landscaping changes.
.%2. Plan must include landscape points required for the site.
Plan must include streetscape points required for the site.
~,-4. Landscape legend must indicate the scientific nomenclature, size, type (canopy,
non-canopy, shrub), and points claimed for all proposed landscaping.
Staff does not consider pea gravel an approved groundcover or decorative rock.
One hundred percent coverage of groundcover, decorative paving, decorative rock,
or a perennial grass is required in parking lot islands, swales and drainage areas,
and the parking lot setback unless otherwise landscaped or existing plants are
preserved.
-6. In previous conversations, you proposed to protect and save the natural vegetation
along the eastern property line. This barricade should be indicated on the
landscape plan to ensure the protection of the natural vegetation.
7. An irrigation system plan or a general note indicating that an irrigation system to
service all new plantings will be installed by a certified installer must be supplied
before a certificate of occupancy will be issued.
Reviewed by: LAUREN HARRELL Date: November 25, 2003
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the
City, will constitute a completely new review.
2 of 2
MEMORANDUM
To: City of College Station
Development Services
Attn: Bridgette George, Assistant Development Manager
From: Pat & Joe Marek
Date: November 13, 2003
Re: Landscaping: Stop & Store Ministorage
3820 Harvey Road
Bridgette:
If you will recall, when we had our preapplication meeting regarding our
rezoning request for a second phase for the above referenced ministorage project,
we also discussed the landscaping for our soon to be completed phase 1. In that
regard, I am submitting a revised landscaping plan which incorporates more plant
material and sod than originally approved as well as provides for the use of native
plant materials in lieu of exotics. Additionally, if you will recall, Molly was going to
do an on site inspection of the existing natural buffer to satisfy herself that it would
be futile to tear out the existing native materials to plant new exotics when clearly
the native buffer serves the intended purpose much more effectively.
We would respectfully request that you consider allowing us to substitute this
revised landscape plan in lieu of the one that was originally submitted on our site
plan. Thank you in advance for an expedient response as we are anxious to get our
facility opened in the next few weeks.
Pat Marek
Office: 696-5562
Fax: 696-3089
Cell: 218-2914 (Pat)
1 I
f 1-1~-Q3
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
December 11, 2003
TO: Ash & Brown Engineering, Via fax 846-8914
FROM: Bridgette George, Asst. Development Manager
SUBJECT: STOP AND STORE MINI-STORAGE (SP)
Staff reviewed the above-mentioned site plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. Please address
the comments and submit the following information for further staff review and approval
of the plans:
$200 Processing fee (requested last time but not submitted with revised
plans)
Six (6) complete sets of construction documents for the proposed
development with the revised site and landscaping plans attached;
Two (2) revised site; and
One (1) landscaping plan.
If you have any questions or need additional information, please call me at 764-3570.
Attachments: Staff review comments
cc: Pat Marek, Via fax 696-3089
Case file # 02-00500147
STAFF REVIEW COMMENTS No. 4
Project: STOP AND STORE MINI-STORAGE (SP) - 02-00500147
LANDSCAPE/STREETSCAPE
1. Please differentiate between the symbols of the Monterrey Oaks and the Live
Oaks.
2. The number of plantings claimed in the legend cannot be found on the site plan.
Please indicate each of the plantings with symbols on the site plan, or designate
the number of each species to be planted in each area.
3. Retama (parkinsonia aculeata) cannot be classified as a canopy tree. In order to
maintain the calculated points, select a canopy tree from the approved plant list
for the City of College Station.
Reviewed by: LAUREN HARRELL Date: December 9, 2003
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the
City, will constitute a completely new review.
2 of 2
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764-3570 / Fax (979) 764-3496
MEMORANDUM
July 31, 2002
TO: Ash & Browne Engineering, Via fax 846-6914
FROM: Bridgette George, Assistant Development Manager
SUBJECT: STOP AND STORE MINI-STORAGE (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested but had to stop review. The
following page is a preliminary list of staff review comments detailing items that need to
be addressed. Please address the comments and submit the following information for
further staff review:
Two (2) revised site and landscaping plans.
If there are comments that you are not addressing with the revised site plan, please
attach a letter explaining the details. If you have any questions or need additional
information, please call Molly Hitchcock or myself at 764-3570.
Attachments: Staff review comments
cc: Pat Marek, Via fax 696-3089
Case file #02-00500147
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: STOP AND STORE MINI-STORAGE (SP)-SITE PLAN - COMMERCIAL
(02-147)
PLANNING
FYI: Pages 1, 2, and 3 were considered as the site plan.
This is a stop review. Because the buffer requirement was not addressed, and the site
plan may change in an effort to meet ordinance requirements, staff will make a
complete review of the next submittal. The following comments are provided to help
the applicant make a more complete submittal.
1. This project will have to meet the new buffer ordinance (Section 8.10 of the Zoning
Ordinance). Please include this in the site plan. Buffer areas may be excluded from
the total site area when calculating the landscaping point requirement.
2. Parking spaces 5 and 6 will have to be relocated. Because of limited sight distances
and proximity to the entrance, these spaces will create unsafe conditions.
3. All parking spaces must be a minimum of 18 feet long with a 2-foot overhang or 20
feet long with no overhang.
4. Please describe the treatment of the parking islands at the back of the property.
They are required to be planted or treated with enhanced paving.
5. Please verify that you will be removing the existing easements near the eastern and
southern property lines.
6. The dumpster enclosure needs to be an 8-foot wooden fence.
7. Please amend General Note #8 to include that the irrigation will be approved prior to
C.O.
8. Will the project have security gates? If so, please show their location and swing
path.
Reviewed by: Molly Hitchcock Date: July 22, 2002
ENGINEERING
1. Please provide easement for waterline extension.
2. Please be aware that additional cleanouts may be required to meet City Building
Code.
3. Comments on Development Permit will come separately.
Reviewed by: Spencer Thompson Date: July 30, 2002
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 2 of 3
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
5. Developer provides digital AutoCAD 2000i version of plat and/or site plan.
email to rbolin(aD-ci.college-station.tx.us
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction
purposes.
8. Developer provides easements for electric infrastructure as installed for
electric lines (including street lights).
Reviewed by: Ronnie Bolin Date:7-18-02
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker or
Reduced Pressure Principle Back Flow Device and installed as per City Ordinance
2394.
2. All BackFlow devices must be installed and tested upon installation as per City
Ordinance 2394.
Reviewed by: Rob Werley
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 3 of 3