Loading...
HomeMy WebLinkAboutresponse to commentslp.W ;5 `2, 'D MEMORANDUM May 3, 2010 TO: Matt Robinson, Staff Planner FROM: Jane Kee, IPS Group, r SUBJECT: SPRING CREEK RTAt]L & OFFICE (REZ) - Rezoning Please find response to staff comments received 4-28-10 as well as: V One (1) 24"x36" copy of the revised Rezoning Map; Nineteen (19) 11"x17" copies of the revised Rezoning Map; One (1) 24"x36" copy of the revised Concept Plan; Nineteen (19) 11"x17" copies of the revised Concept Plan; One (1) copy of the digital file of the revised rezoning Metes & Bounds on diskette or e-mail to P&DS_Digital_Submittal@cstx.gov. STAFF REVIEW COMMENTS N0.1 , Project: SPRING CREEK RETAIL & OFFICE (REZ) - (10-00500060) PLANNING 1. City staff will coordinate with the developer and area HOAs to schedule a neighborhood meeting to discuss issues of compatibility in design, use and buffering. 2. Rezoning Map: a. Provide legal description on map - Done 3. Concept Plan: a. Staff recommends removing self service storage as an allowed use. - OK b. Please provide a written description of the architectural design of the building and how it will comply with the Comprehensive Plan. Specific examples should be given on how the proposed buildings will complement the adjacent residential areas (i.e. materials, fagade treatments etc.). - See below Roof lines will be pitched to match typical single family homes in the adjacent neighborhood. Roof materials will consist of typical shingle style and colors similar to those on the homes. There will be no flat or metal roofs. Buildings will be two- story and facades visible from the street will consist of a combination of two or more of the following materials (not counting windows and doors): brick, stone, EFTS, and / or siding of wood, vinyl, hardie plank or equivalent materials. Facades will have articulation similar in scale and type to residential structures in the surrounding neighborhoods. More definitive architectural design will occur at the time of the development of the building plans. c. Since drive-thrus are included on the application as a part of the permitted uses, please show where on site and on which sides of the buildings they may be located. - Done. See concept plan revised. d. Please provide a general statement regarding the proposed drainage. - Done e. Is there enough room to provide the required buffer of 15' and a masonry wall between the property line and the pond? At detailed site plan we will examine this more closely. It may be that one of the alternatives to use a fence and greater separation may be necessary. But until detailed engineering and site work is done, this cannot be determined for sure. f. As an fyi, no freestanding signage would be allowed under C-3, Light Commercial standards. A variation could be requested, but would need to incorporate a height limit. We are requesting to use the sign regulations of the C-3 district. The low profile sign type is compatible with this type of suburban commercial development. Per Joe Guerra, the City's Transportation Planner, the number of trips generated by the 10,000 sf Professional/Medical Office the trip rate is only 1.55 trips/ksf and overall 15.5 trips. OK