Loading...
HomeMy WebLinkAboutApplication (10-156)Crry OP COTJ.F.GT? S7':-'T-TON Home of Texas A6M University` FINAL PLAT APPLICATION FOR OFFICE USE ONLY CASE NO.: DATE SUBMITTED+~ : l ' 0 TIME: Q. W STAFF: ALT (Check one) ❑ Minor ❑ Amending ❑ Final ❑ Vacating X❑Replat ($500.00) ($500.00) ($668.00) ($668.00) ($668.00) Is this plat in the ETJ? ❑ Yes 0 No is this plat Commercial © or Residential ❑ MINIMUM SUBMITTAL REQUIREMENTS: xl Fourteen (14) folded copies of plat. (A signed mylar original must be submitted after approval.) Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). Notice of Intent (NO[) if disturbed area is greater than five (5) acres cumulatively. Copy of original deed restrictions/covenants for replats (if applicable). X Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate current within ninety (90) days. The report must include applicable information such as ownership, liens, encumbrances, etc. ❑X Paid tax certificates from City of College Station, Brazos County and College Station I.S.D. fK Proof of parkland dedication consideration by the Parks & Recreation Board or Parks & Recreation Department (if applicable). x] The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not. NOTE: A mylar of the approved preliminary plat must be on file before a final plat application will be considered complete. If the mylar is submitted with the final plat application, it shall be considered a submittal for the preliminary plat project and processed and reviewed as such. Until the mylar has been confirmed by staff to be correct, the final plat application will be considered incomplete. Mx $500-$668 Final Plat Application Fee (see above). $167 Variance Request to Subdivision Regulations Fee (if applicable). $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 0.75% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). ❑X Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. Please attach pages if additional information is provided. Date of Optional Preapplication or Stormwater Management Conference 1-6-2010 NAME OF PROJECT Spring Creek Gardens - Phase 3 ADDRESS Decatur Drive SPECIFIED LOCATION OF PROPOSED PLAT: South side of Decatur Drive, east of Candace Courtin the Spring Creek Gardens Subdivision - Phase 3 1 APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Wallace Phillips E-mail wallace.phillips@verizon.net Street Address 4490 Castlegate Drive City College Station Phone Number 690-7250 State 7X Fax Number 690-1041 Zip Code 77845 1/10 Page 1 of 7 PROPERTY OWNER'S INFORMATION (ALL owners must be identified. Please attach an additional sheet for multiple owners): Name Spring Creek CS Development, Ltd. E-mail wal/ace_phillips@verizon.net Street Address 4490 Castlegate Drive City College Station State TX Zip Code 77845 Phone Number 690-7250 Fax Number 690-1041 ARCHITECT OR ENGINEER'S INFORMATION: Name Schultz Engineering, LLC. E-mail joeschultz84@verizon.net Street Address 2730 Longmire Drive, Suite A Citv College Station Phone Number 764-3900 State TX Zip Code 77845 Fax Number 764-3910 Do any deed restrictions or covenants exist for this property? Yes ❑ No x❑ Is there a temporary blanket easement on this property? If so, please provide the Volume and Page No. Total Acreage 2.817 Total No. of Lots 4 R-O-W Acreage 0 Existing Use Vacant Proposed Use Office/Self StorageJResidential Number of Lots By Zoning District 3 / R-1 1 / PDD 1 / A-P Average Acreage Of Each Residential Lot By Zoning District: 0.16 / R-1 Floodolain Acreage n/a Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? F Yes (X No A statement addressing any differences between the Final Plat and Preliminary Plat (if applicable): requested variance to subdivision regulations and reason for same (if applicable): one Regarding the variance request, explain how: 1. There are special circumstances or conditions affecting the land involved such that strict application of the subdivision regulations will deprive the applicant of the reasonable use of his land. 2. The waiver is necessary for the preservation and enjoyment of a substantial property right of the applicant. 1/10 Page 2 of 7 3. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other property in the area, or to the City in administering subdivision regulations. 4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in accordance with the provisions of the Unified Development Ordinance. Requested Oversize Participation No .4,-- Total Linear Footage of Proposed Public: 0 Streets 0 Sidewalks 0 Sanitary Sewer Lines 0 Water Lines 0 Channels 0 Storm Sewers 0 Bike Lanes I Paths Parkland Dedication due prior to filing the Final Plat: &M ACREAGE: No. of acres to be dedicated + $ development fee No. of acres in floodplain No. of acres in detention No. of acres in greenways OR FEE IN LIEU OF LAND: No. of SF Dwelling Units X $ = $ (date) Approved by Parks & Recreation Advisory Board NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true, correct, and complete. IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application must be accompanied by proof of authority for the company's representative to sign the application on its behalf. LIEN HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as described above. Signature and title Date 1110 Page 3 of 7 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is reissued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. Property Owner(s) Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 4. I, THE ENGINEER, AGREE T AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPM ~ PLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. e._~P_..°®••~.. q X1237 65889 AL 7-Z3-/o Date 1/10 Page 2 of 4