HomeMy WebLinkAbout00-00000210- 00073940I/ LG~~ A l~Cl
FJ~ 2i0
PREDEVELOPMENT MEETING
The purpose of a predevelopment meeting io to meet the City Staff that will be involved
with your development and identify general issues that need further analysis. Along with
the discuooion of these major iooueo, staff will talk about the development proceSS,
distribute necessary information and discuoo what permits will be required for your
particular development. This meeting iS in noway a complete review of your project.
Staff will perform a formal thorough review once the minimum requirements are
Submitted for your particular development.
Date of Meeting: if - / -M q:D 0 pm
Applicant(S): "f3,e't1.4;er 7a 1rl c 6r1
City Staff present: -.govt
vl 0 Q ~ J
Fropooal: P( ap"A 1, f)
1 -1
Miscellaneous:
Land Use:
Zoning:
(Mdet ~D ( , cm
Special zoning district information:
5ub6ivi5ion/flatting looue5:
T-Fare Flan/Street looue5:
kf
Driveway Acce55: Pr"Iev1 Lo ACC-~~~ b~
r\ LAI) QL L)
~4~~
Farkland/Greenway5 Dedica ion:
Farko & Recreation Board Consideration:
Drainage 155ue5:
y
Utility 155uco:
Water Availability/Capacity:
Sanitary Sewer Availability/Capacity:
Impact fees:
Electrical
Fire Hydrant
MiSCellaneouo:
Landscaping/Streetocape:
Sidewalks:
Dumpoter Location:
Signs:
Screen i ng/Buffering:
Variance Requests:
Permits required for this development:
Development Permit
Building Permit
Conditional Use Permit
TxDOT Driveway Permit for work in State ROW
TxDOT Utility Permit for work in State ROW
Special Review required by:
Wolf Pen Creek Design Review Board (DRB)
Northgate Revitalization Committee (NR13)
Parks and Recreation Board
Planning and Zoning Commission (P&Z)
City Council
Project Review Committee (PRC)
Information provided:
Zoning Ordinance
Subdivision Regulations
Specifications for Street Construction
Drainage Policy & Design Standards
tt
CS Building Regulations (Local Amendments to the building Code)
Fire Department Construction & Development Guide
Driveway Access Location & Design Policy
Water & Sewer Specification Manual
CS Business Center Covenants & Restrictions
Guide to building & Development
Development Resource Guide
MINUTES
Planning and Zoning Commission
CITY OF COLLEGE STATION, TEXAS
December 7, 2000
AGENDA ITEM NO. 10: Consideration of a Master Development Plan for Horse
Haven Estates consisting of 118.4 acres located east of Earl Rudder Freeway
between Switch Station Road and the Raintree Subdivision. (00-210)
Staff Planner Hitchcock presented the staff report. In the past, the applicant has sold off
parts of the original tract without platting. In 1998, a Master Plan for Horse Haven
Estates was developed so the driving range could be legally sold, reoriented, and
developed on Lot 2 (25.07 acres). The Planning and Zoning Commission and the City
Council passed the plan, and Lot 2 was final platted in 1998. The plan expired after no
further action was taken. In October of 2000, a new Master Development Plan was
submitted to the Planning and Zoning Commission for consideration. The new plan
showed the platted Lot 2 (proposed as Tracts 2 and 3), and essentially maintained the
same boundaries for Tract 1, but other tracts were reconfigured. A portion of the
proposed Tract 6 was zoned R-1 Single Family Residential and the rest of the area
encompassed by the plan was A-O Agricultural Open.
The Commission denied the plan, expressing concerns about access and parkland
dedication. Essentially, the October 2000 plan is resubmitted at this time with a few
changes:
1. All proposed residential tracts have been changed from R-I Single Family Residential
to A-OR Agricultural Open Residential for larger lot sizes and a less dense residential
population.
2. Switch Station Drive and Switch Station Road have been proposed for secondary
access of future residents. (Public Utilities has agreed to this proposal for Switch
Station Road.)
3. The Gulf States Utilities Company Easement has been shown to be a future part of
the East Bypass bike path and linear park.
The proposed zoning for Tracts I (12.19 acres) and 2 (13.66 acres), which have frontage
on the Earl Rudder Freeway feeder road, is PDD-B Planned Development District-
Business. All other tracts are proposed A-OR Agricultural-Open Residential.
The Land Use Plan shows this area to be Mixed Use. Earl Rudder Freeway is classified
as a Freeway and Expressway on the Thoroughfare Plan. The East Bypass Study shows
the land along the frontage road to be Mixed Use and the lots to interior to be Residential.
Public Works has been notified that the greenway on this property is a level 5 acquisition
priority for the City of College Station. The developer plans to dedicate parkland.
Staff recommends approval of the final plat with the condition that the Staff Review
Comments #4 are addressed.
Chairman Mooney asked Ms. Hitchcock if in this plan that Switch Station Road is going
to connect to Appomattox. Ms. Hitchcock said yes, that with Tracts 4 and 5, Switch
Station Drive would be required to be built along with a portion of Switch Station Road
from Switch Station Drive to Appomattox.
Commissioner Floyd asked if it was possible to place a 911 gate on Appomattox to
prohibit entry into that neighborhood but allow access off of Switch Station Road.
Ms. Hitchcock stated that the Staff had concerns about keeping the residential and
business traffic separated while allowing a secondary access for the residents.
Commissioner Warren stated that while placing a street to the east, a cut-through to the
neighborhood should not be allowed.
Ed Hard, Transportation Planner stated that it is not a desirable option for the City from
an overall maintenance and operations standpoint. Commissioner Floyd suggested that
the developer be held responsible to maintain the street and gate to the City's standards.
Although this item is not scheduled for a public hearing, Chairman Mooney opened the
meeting for comments.
Mr. Taggart, Municipal Development Group, stated that the major concern regarding the
Master Plan was the need for an additional egress for the development. The Master Plan
before the Commission tonight has addressed this concern. A connection to Appomattox
is not an issue that is being insisted upon, but rather an attempt to satisfy the
Commission's safety concerns for the future development in regards to appropriate
access. The 911-gate solution discussed tonight is acceptable and adequate. The number
of turning moments and the actual physical distance required for this route, even if it
were to connect with Appomattox, to become a cut-through, fails on the grounds that
there is a longer distance. Also, with a normal signage scheme on Appomattox through
the Windwood Subdivision, it would actually become a long-cut rather than a short-cut.
Chairman Mooney asked for clarification on the size of the area that is going to be
required for fencing as being 20'x 20'. Also, an earlier concept was to have Horse Haven
Lane empty into the parking lot for Academy. Looking at the current plan, the other
possibility would be to have Horse Haven Lane connect at Switch Station Drive, thus
orienting the cul-de-sac to the north. He asked Mr. Taggart if this is a feasible concept
along with the 911-gate at Appomattox.
Mr. Taggart stated that the major concern in doing that would be the lack of making a
physical connection between the residential tracts and what is proposed as the Academy
tract to the East Bypass. This would create a one-entrance extended cul-de-sac.
Chairman Mooney expressed concern about Horse Haven Lane cutting through the
r
proposed Academy parking lot in order to access the Highway 6 feeder. Mr. Taggart
explained that the proposed Horse Haven Lane is a normal 60 feet wide public street. We
are not proposing for traffic to be allowed to cut through a parking lot.
Paul Williams, 2601 Sandalwood, stated that he does not want Appomattox to open up to
thru traffic. It is increasingly dangerous for the residents to enter and exit at Appomattox
and Highway 30 at this time without the additional traffic expected with the approval of
this proposal. The residents would like a safe entrance and exit out of Windwood on
Highway 30.
Chairman Mooney asked if Mr. Williams if there would be an advantage for Windwood
residents to be able to go to Switch Station Road to access the frontage road and then to
the signal light. Mr. Williams stated that this would be a solution except that it would
open it up at the other end as well.
Burt Hermann, referring to page 15, option 2 of the Highway 60 Neighborhood Plan,
would be the most economically feasible plan, taking into consideration the median that
is already in place on Highway 30. A 911-gate at Appomattox is acceptable.
Joe Steedham, a Windwood resident, stated that the 911-gate would be the best solution
in keeping the thru traffic from the neighborhood.
Joe Burns, 2608 Windgate Court, stated that the residents do not want Appomattox
opened up for thru traffic. Please search for other possible solutions by referring to the
East Bypass Study that was adopted by The City Council and that was lead by the City's
Senior Planner Lee Battle over the last nine months.
Sherry Ellison, 2705 Brookway Drive, pointed out that she had submitted other solutions
along with a letter to the Commission for their consideration in reference to this proposal.
Commissioner Warren asked if she was comfortable with the 911-gate placed a
Appomattox. Commissioner Mooney clarified that Switch Station Drive would continue
to Switch Station Road and a gate being placed across Appomattox to prevent traffic
entering the neighborhood there. Switch Station Road would continue to the bypass to
become a public road eventually. Appomattox Court could be developed but would not
be connected to Appomattox because of the 911-gate and there would not be an access
into Windwood off of Switch Station Road. Ms. Ellison stated that this would alleviate
the cut-through traffic for the time being and give the residents the opportunity to
research the East Bypass Study for a solution to this situation.
Chairman Mooney closed the public hearing.
Commissioner Floyd asked how much discretion the Commission has in making the road
a one-way. Assistant City Attorney stated that the road is off site and the Commission
does not have the authority to designate the road as a one-way road. Commissioner
Mooney asked if the Commission could make this recommendation to the City Council.
Ms. Nemcik said that this was within the purview of the Commission. Commission
Floyd stated that there may be another possible solution without economic impact. If
Switch Station Road were one way out to the bypass and there were no right hand turns
onto Appomattox, then theoretically there would not be any cut-through traffic and the
Windwood Subdivision would have an exit that would solve the Harvey Road traffic
problem. These two things would satisfy both the neighborhood and the applicant.
Chairman Mooney motioned to approve with the 911-gate placed at the end of Switch
Station Drive and a recommendation to City Council to consider the development of
Switch Station Road as a one-way and no right turn onto Appomattox exit from Horse
Haven Estates. Commissioner Warren seconded the motion. Commissioner Williams
stated that the one-way exit would not give the City access to the Switch Station.
Commissioner Mooney explained that the access to Switch Station Drive would be Horse
Haven Drive. The motion carried 5-1 with Commissioner Williams abstaining.