MEMORANDUM
November 16, 2000
TO: Kling Engineering, Via fax 846--8252
FROM: Bridgette George, Asst. Development Coordinator
SUBJECT: DuckHaven Sah&p slon & TealModularHome Park -MasterDevelopmentPlan
Staff reviewed the above-mentioned master development plan as requested. The following page is
a list of staff review comments detailing items that need to be addressed. Please address the
comments and submit the following information by Monday, November 27, 10:00 a.m. to be
placed on the next available Planning and Zoning Commission meeting scheduled for December
77 20001 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue.
Ten (10) copies of the revised master development plan; and
The Mylar original of the Master Development Plan.
If you have any questions or need additional information, please call me at 764-3570.
Attachments: Staff review comments
Electrical & W/WW conunetlts
cc: Paul Clarke, Via fax 846-1461
Case file #00-209
Home of Texas A&M University
STAFF REVIEW COMMENTS
No. 1
Project: DUCK HAVEN SUB & TEAL MODULAR HOME (MDP)-MASTER
DEVELOPMENT PLAN (0-209)
PLANNING
1. Will curb and gutter be provided, or is the developer requesting a variance
to the minimum lot width of 100'?
2. Please clarify the dark line that crosses through Block 2, Lots 26 & 27, and
through Block 1, Lot 40 and the designated 2.9-acre detention and
sanitary sewer treatment site. What is the dotted line on either side of the
dark line?
Reviewed by: Shauna A. Laauwe Date: November 14, 2000
ENGINEERING
1. Will you be improving or moving any of the natural drainage channels?
Reviewed by: Spencer Thompson Date: November 16, 2000
NOTE: Any changes made to the plans, that have not been requested by the City of College
Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any
additional changes on these plans that have not been pointed out to the City, will constitute a
completely new review.
Staff Review Comments Page 1 of 2
i.~n~rcvr n~nonno nnr~
11/28/00 09:44 %Y979 846 8252 KLING ENGINEERIN
1,.ING ]ENG NM ERI NG & SURVEYING
Conrulting Engineera - ]Land Surveyove
4103 Texas Avenue, Suite 212 Post Office Box 4234
Bryan, Texas 778M Bryan, Texas 77805
Telephone 979/846212
Fax 9791846-8252
B.J. Kling, P.E., R.P.L.S.
S.M. Kling, R.P.L.S.
November 17, 2000
TO: City of College Station
ATTN: Bridgette George
FROM: S. M. Kling qf~L
RE: Staff Review Comments on:
Duck Haven Subdivision & Teal Modular Home Park - Master Development
Plan
PLANNING
1. Will curb and gutter be provided, or is the developer requesting a variance
to the minimum lot width of 1007
Ans: Yes - curb and gutter to be provided
No variance being requested
2. Please clarify the dark line that crosses through Block 2, Lots 26 & 27,
and through Block 1, Lot 40 and the designated 2.9 acre detention and
sanitary sewer treatment site. What is the dotted line on either side of
the dark line?
Ans: The dark line is the relocated creek approx. 650'
The dotted line is a 70' drainage easement for the relocated creek
ENGINEERING
1. Will you be improving or moving any of the natural drainage channels?
19 0 01
Ans: Yes - as shown by the dark line