MEMORANDUM
November 16, 2000
TO: Brad Kerr, Kerr Surveying, Via fax 691-8904
FROM: Bridgette George, Asst. Development Coordinator 01
SUBJECT: HarveyRoadF,ast/SpringersFtuntage-AnalPlat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information by Monday, November 27, 10:00 a.m. to be placed on the
next available Planning and Zoning Commission meeting scheduled for December 7, 2000,
7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue.
Ten (10) copies of the revised final plat; and
The Mylar original of the revised final plat with the owner's signature.
If you have any questions or need additional information, please call me at 764-3570.
Attachments:
cc:
Staff review comments
Andrew Springer, Via fax 695-2147
Case file #00-208
Home of Texas A&M University
STAFF REVIEW COMMENTS
No. 1
Project: Harvey Road East Subdivision Replat
1. We are considering this a minor plat. Approval will be by City Staff. Please
remove the Certificate of P&Z and replace with Certificate of City Planner.
2. Please show Original Plat as it is on file (not as survey).
3. Please remove set back lines from Replat. Add note: 5. Setback lines to
meet City of College Station Zoning Ordinance.
4. The underground box culvert will need to be in a Public Utility Easement.
(Drainage Easements are intended for overland flow situations and have
restrictions accordingly.) Please show PUE on Replat.
Reviewed by: Spencer Thompson Date: 11/15/00
ELECTRICAL
1. Developer responsible for extending existing stubbed out conduit on
southeast corner of property and taking it to transformer location.
2. Developer is responsible for extending conduit from transformer to the
northwest corner of property along frontage road.
3. Developer responsible for installing conduit per city spec and design.
4. Developer responsible for providing easements to cover all primary electrical
and equipment.
J:\PZTEXT\PZ03933. DOC