Loading...
HomeMy WebLinkAbout00-00000207- 00073924CON General Contractors Div. of CDS Enterprises, lnc. 1707 Graham Rd. • College Station, TX 77845 • 409-690-7711 • Fax: 409-690-9797 November 17, 2000 Bridgette George Asst. Development Coordinator City of College Station 1101 Texas Avenue South College Station, TX 77842 RE: Castlegate Subdivision, Section 4, Phase 1 - College Station, Texas Dear Ms. George: Attached are 10 copies of the revised Final Plat, the revised mylar original, 5 revised copies of the construction documents, 2 revised drainage reports, and the "redlined" copy of the construction documents. Also attached is a summary of our response to the Staff Review Comments. If you have any questions or need additional information, please do not hesitate to give me a call at (979) 690-7711. Sincerely Yours, 'U'tt- Joe Schultz, P.E. Civil Engineer ~7-~D 2: ` 0 em CO-207 Attachments Castlegate Subdivision, Section 4, Phase 1 Response to Staff Review Comments No. 1 Engineering: Final Plat 1. Sheet 1 - changes made per comments. 2. Sheet 2 - changes made per comments. Construction Documents 1. Sheet 2 - changes made per comments. (Changes reflected on Sheet 7). 2. Sheet 9 - changes made per comments. Drainage Report 1. Page 4 - changes made per comments. 2. Page 6 - changes made per comments. General: 1. Two copies of the Engineer's Cost Estimate are attached. 2. Two copies of the Sewer Design Report are attached. 3. The Fire Flow Analysis for all sections of Castlegate was addressed in a report prepared by CSC Engineering & Environmental Consultants, Inc. This report was submitted on 11-8-00 and was approved on 11-15-00 by your office. Green Prairie Investors, Ltd. 5010 Augusta Circle College Station, TX 77845 January 17, 2001 Natalie Thomas Ruiz, AICP Development Review Manager City of College Station 1101 Texas Ave. South College Station, TX 77842 RE: Castlegate Subdivision - College Station, Texas Dear Ms. Ruiz: This letter addresses the development of the park land for the Castlegate Subdivision - Sections 1 through 4. The following is a summary of the timeline for the development of the parks: Park At Subdivision Entrance on Greens Prairie Road Pond & path design Construction completed 12-15-00 12-15-00 thru 4-1-01 Neighborhood Park for Sections 1 - 4 Park Planning 10-15-00 thru 2-15-01 Design 2-15-00 thru 4-1-01 Construction 4-1-01 thru 8-31-01 The schedule for the subdivision infrastructure construction is as follows: Section 1 - Phase 1 Section 4 - Phase 1 Section 2 - Phase 1 Section 3 - Phase 1 11-1-00 thru 3-1-01 12-1-00 thru 5-1-01 2-1-01 thru 7-1-01 3-1-01 thru 9-1-01 If you have any questions or need additional information, please do not hesitate to give me a call at (979) 693-7830. Sincerely Yours, Wallace Phillips Manager