MEMORANDUM
February 18, 2008
TO: Rabon Metcalf, via email rabon@rmengineer.com
FROM: Lindsay Boyer, AICP, Senior Planner
SUBJECT: SUMMIT CROSSING PH 1 (FP) - Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. If all comments have been
addressed and the following information submitted by Monday, February 25th, 10:00 a.m., your
project will be placed on the next available Planning and Zoning Commission meeting
scheduled for, Thursday, March 20th, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas
Avenue.
One (1) 24"x36" copy of the revised final plat;
Nineteen (19) 11"x17" copies of the revised final plat;
Parkland Development Fee in the amount of $45,108 must be submitted prior to
the filing of the final plat;
One (1) Mylar original of the revised final plat (required after P&Z approval); and
One (1) copy of the digital file of the final plat on diskette or e-mail to
mtrevino@cstx.gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that if all comments have
not been addressed your project will not be scheduled for a Planning & Zoning Commission
meeting. Your project may be placed on a future agenda once all the revisions have been made
and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the
agenda and staff report can be accessed at the following web site on Monday the week of the
P&Z meeting.
http://www.cstx.gov/home/index.asp?page=2481
Please note that a Mylar original of the revised final plat will be required after P&Z approval and
prior to the filing of the plat. If you have any questions or need additional information, please call
me at 979.764.3570.
Attachments: Staff review comments
cc: Mike Davis, 3060 Development, via email mikedavis@suddenlink.net
Case file #08-00500026
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review. 1 of 3
STAFF REVIEW COMMENTS NO. 1
Project: SUMMIT CROSSING PH 1 (FP) - 08-00500026
PLANNING
1. The call for curve C5 needs to be checked.
2. Please note that any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and "bubbled" on
your plans. Any additional changes on these plans that the City has not been made aware of
will constitute a completely new review.
3. The construction documents and reports are still under review and may affect the plat.
Reviewed by: Lindsay Boyer Date: February 14, 2008
ENGINEERING COMMENTS NO. 1
1. Additional easement appears to be needed in the areas where multiple utilities are
located, as the BCS Guidelines requires 30-ft in these cases. Although some of these
areas are located along ROW, this will only provide for approximately 22ft of workable
utility space.
2. Along SH 30 where there is 3 utilities proposed in one PUE and with the water main
existing, will the 30-ft PUE provide for adequate utility spacing and workable space?
3. Please make the PAE dedication note separate from the existing PUE metes and
bounds along SH 30.
4. The proposed utilities located adjacent to alleys appear to only have 11 feet once the
proposed PUE and ROW area not covered by pavement is accounted for, please
address.
5. Please add a note to the plat addressing the ownership and maintenance responsibilities
of the private common, drainage and access areas, much like note 5 on the preliminary
plat.
Reviewed by: Josh Norton
Date: February 18, 2008
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes.
2. Developer provides easements for electric infrastructure as installed for electric lines
(including street lights).
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per City specs and design.
2. City will provide drawings for conduit installation.
3. Developer provides 30' of rigid or IMC conduit for each riser pole. City installs riser.
4. Developer pours transformer pad(s) per City specs and design.
5. Developer installs pull boxes and secondary pedestals as per City specs and design (pull
boxes and secondary pedestals provided by the City).
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review. 2 of 3
6. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to:
sweido(a)-cstx.gov.
7. Developer provides load data for project.
8. To discuss any of the above electrical comments please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido Date: 2-14-08
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: February 13, 2008
ADDRESSING
1. Please change the Summit Pass street name, Summit already exists.
Reviewed by: Mandi Alford Date: 2/11 /08
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review. 3 of 3
M~
';..,,,Gomult/ny Err9ineers
February 4, 2008
Josh Norton, E.I.T.
Graduate Civil Engineer
and
Lindsay Boyer, A.I.C.P.
Senior Planner
City of College Station
Planning & Development Services
1101 Texas Avenue South
College Station, TX 77842
RE: Summit Crossing, Phase One - Initial Submission Package
RME No. 227-0338
Josh Norton and Lindsay Boyer:
I \1
Please find attached the Final Plat and Construction Drawings (Part 2) for the above referenced
project. The plans are submitted for your review and commenting and placement on the March
6, 2008 P&Z Commission meeting.
2 - Construction Drawings (Part 2) (B/CS & TxDOT standard detail sheets will be submitted
with the permit sets);
2 - Engineer's Cost Estimate (Part 2 Improvements);
2 - Drainage Report;
2 - Water & Sanitary Sewer Study;
2 - TxDOT Driveway Permits (4 copies of each permit);
1 - TCEQ NOI packet;
14 - Final Plats;
1 - Final Plat Application ($400.00 Plat Fee & $600.00 Public Infrastructure Fee);
1 - Paid Tax Certificate;
The following additional items will be submitted once the plans have been reviewed and
approved.
❖ Letter Acknowledging City Standards;
❖ TCEQ Exception Letter (Water & Sewer Improvements);
❖ Electronic File (DWG format) of Final Plat;
Please do not hesitate to call should you have any questions.
Rabon A. MetcaX P.E.
ra bon(dI rmengi neer.com
CDI-227-0338-L02
P.O. Box 9253, College Station, TX 77842
Off/Fax: (979) 690-0329
email: civil@rmengineer.com
Page 1 of 1
Gor~sul-ri"9 E`~9[neers
March 17, 2008
Josh Norton, E.I.T.
Graduate Civil Engineer
and
Lindsay Boyer, A.I.C.P.
Senior Planner
City of College Station
Planning & Development Services
1101 Texas Avenue South
College Station, TX 77842
9F3 -Iq I09
& ao~^
P.O. Box 9253, College Station, TX 77842/ AY-0
Off/Fax: (979) 690-0329igg./ *
email: civil@rmengineer.com
RE: Summit Crossing, Phase One - 2nd Submission Package
RME No. 227-0338
Josh Norton and Lindsay Boyer:
Please find attached the revised Final Plat and Construction Drawings for the above referenced
project. The plans are submitted for your review and commenting. The Construction Drawings
for Sanitary Sewer Line "S 1" are submitted for your review and permitting and issuance of a
revised Development Permit (if required).
Sanitary Sewer Line "S I":
11 - Construction Drawings w/relevant B/CS
copies to RAW);
2 - Revised Engineer's Cost Estimates;
2 - Sanitary Sewer Study: Line "S I": Rev. No
standard details sheets (Please return extra
l;
Engineering ems:
1 - Construction Drawings (B/CS & TxDOT standard detail sheets will be submitted with the
permit sets) w/Engineering Comments No. 1;
2 - Engineer's Cost Estimate: Rev. No. 1;
1 - Technical Design Summary;
2 - Drainage Report: Rev. No. 1;
1 - Correspondence addressing Mobil Gas Company rear lot line concerns;
1 - Concept Plan submitted to Parks in reference to Park/Detention Facility awareness;
1- Correspondence addressing TxDOT off-site drainage structures;
Final Plat Items:
1 - Final Plat (2406) w/Staff Review Comments No. 1;
19 - Final Plats (11 x 17);
1 - Preliminary Plat (2406);
19 - Preliminary Plats (11 x 17);
rill '1'1'7 n219 r n'I n...... 1 r~
ME
C.or~su/t/`~9 En9~neers
P.O. Box 9253, College Station, TX 77842
Off/Fax: (979) 690-0329
email: civil@rmengineer.com
The following additional items will be submitted once the plans have been reviewed and
approved.
❖ Letter Acknowledging City Standards;
❖ TCEQ Exception Letter (Water & Sewer Improvements);
❖ Electronic File (DWG format) of Final Plat;
Please do not hesitate to call should you have any questions.
Sincerely,
Raboh A. Metcalf, P.E.
rabon(dxmengineer.com
CD1-227-0338-L07 Page 2 of 2