Loading...
HomeMy WebLinkAbout02-00500130- 00073773November 26, 2002 Ms Natalie Ruiz L~ Development Manager City of College Station P.O. Box 9960 College Station, TX 77842 Dear Natalie: We need power to the sprinkler system on the property off of Sheafer Road for Sun Meadows Subdivision. Please find the enclosed work order for Aggieland Landscaping. It is Tuesday, and we have had a rainy Monday and today, and need a couple of consecutive dry days to complete the project. Thank you for your attention. Si 4Mado (El kins ws Su bdivision 10 svt,, xvo--i;~Vv -3 ~ 10 f~,Pz-s A L- tlQf -7 U ( t, -A 9--,9 r S~RV6 ~T-~ # .50, t - jO D6 .f- *~Oo, o0 r n~ November 21,2002 City of College Station To whoom it may concern: Mr. Elkins has hired Aggieland landscape to work at Sun Meadows subdivision. We will be starting immediately and will finish these projects within fourteen days weather permitting.If rain becomes a factor we will need more time for completion. Sincerely, Larry Godfrey Aggieland Landscape 4101 Texas Avenue, Suite A Bryan, Texas 77802 KLING ENGINEERING & SURVEYING Consulting Engineers • Land Surveyors Telephone 979/846-6212 Fax 979/846-8252 B.J. Kling, P.E., R.P.L.S. S.M. Kling, R.P.L.S. Memo: To: City of College Station Development Services c/o Bridgette George, Asst. Development Manager From: Fred Paine Re: Gateway Villas Site Plan City Case # (SP-03-130) Response to Staff Review Comments #2 1-013 Post Office Box 4234" Bryan, Texas 77805 June 30, 2003 Planning 1. Screening shown with note, "to be constructed by others based on Gateway Phase 1, Lot 9 being developed prior to Gateway Phase 2." Engineering Construction Plans 1. Drop SSMH added at SSMH No. 1 2. SSMH relocated per suggestion; Cleanout added at end of line 3. Drop in Manhole refers to flowline calls. Construction of SSMH base to be per City Details & Specifications (S.201.06.A.3) with 1 inch per foot slope from manhole bench at wall line to edge of flow channel. Additional Changes: 1. 10' wide by 24' length PUE added to cover all water and sanitary sewer service crossings. 2. Front porch areas shown on site plan, rear porch areas removed 3. Variable width PUE changed to go around front porch areas