Loading...
HomeMy WebLinkAbout02-00500130- 00073772FOR OFFICE U8E ONLY CASE NO.: 131 DATE SUBMITTED: S MITTAL CHECKED BY: . iz PUBLIC IMPROVEMENT PERMIT (PIP) APPLICATION I Q T~l MINIMUM SUBM17TAL REQUIREMENTS V4 PIP Permit Application Fee 11r~~ / v f } T4116 41-e7 ttach 4 copies of a facility layout plan, which may irrtclude the following: Location, identification, and dimensions of ROW and pavement edgelcurb) Location of all proposed improvements Location of all public utilities (existing) - dimensioned from right-of-way or back of curb, material, size If applicable, the facility layout plan must Include the following (these may be drawn on separate sheets): A signage plan - include dimensions of sign(s), location from back of curb, materials, elevation drawing Drainage and/or erosion control plan roposed waterway alterations with supporting drainage report Landscape plan showing the location and type of plantings (existing and proposed, both common lames and scientific) r' WW-An ! a The cost estimate for relocating any public facilities associated with the work 4 electrical plan Irrigation/Plumbing plan (must be sealed) A Structural plan showing details with anchoring, attachment, and material description (must be sealed) Private utilities plan- dimensioned from right-of-way or back of curb, material, size Attach one copy of the following: Indemnity agreements from abutting fee owners APPLICANT/PRO ~IECT MANAGER'S INFORMATION (Party responsible for completion of all work associated with Ore project): Name N 2-~~E1) !3. K i rl S Mailing Address 2'S0 g F0965- Cif, fj6"W State _r X-S Zip Code -7-7 8 VZ E-Mail Address Phone Number. q,13 11 rl 4 -1409 O Fax Number _ CJW - 7 7 5 y01 PARTY RESPONS LE FOR MAIN ANCE (if a rty is a group, plterovIde Information for contact Name/Group L v~ 91 179 ~ 0_ Mailing Address cz~ j E) cr 14-/ i-el l ~z v,.e,4*' City ' State Zip Code `7' 0 Z E-Mail Address Phone Number Fax Number IDENTIFY THE FOLLOWING. The total valuation of the wort: $ lo- The mc7c~ total valuation of the signage: $ Estimated cost of future relocation of improvements: $ The total square footage of the site: The total linear feet of water lines crossing under paved road: PIP APPUCATION I ofZ Piprpp.doo 2/5/02 2000 SDAS 1N3Nd013A3U 9860 69t RL8.0- 771 'PT 7A IRT inn IDENTIFY THE TYPE OF WORK TO BE PERFORMED: Awning Benches Bike racks Care Canopy Demolition Electrical Facade irrigation system Masonry fence Sign(s) Waterway Altei State Licensed Irrigator: *Landscape Architect/Cc `Sign Contractor: Design Engineer. *Structural Contractor: (please describe): Identify party to perform this work: .the starred itoms may not require that structural contractors, sign contractors, or landscapers perform the work - contact applicable City Departments for determination I hereby verify that the information contained in this application is true and complete. to the best of my knowledge. I understand~tOt the Ntt as the authority to inspect the work to be conducted within the public right-of-way at any time. I also uderstlpn to$ permit may be revoked at any time at the discretion of the City Qfticials. signature Date applied :CIt ~J' 9/Z L WVT h0ii36tiOri ity Engineer ale pproved PIP APPLICATION 2 of 2 Pipapp,doc V5102 Number of Benches: Number of Bike Racks: *Structural Contractor. 'Structural Contractor: r UNIVERSITY PRESERVE SUBDIVISION TIME OF CONCENTRATION CALCULATIONS Drainage Basin #1A8 May 2002 1042001 By: JDB Proposed Flow Path Description Length Slope Data SI a Velocity Time ft Begin Elev. End Elev. /o (fps) min. Overland Flow 300 319.00 317.75 0.42 0.20 25.0 Shallow Concentrated Flow 660 317.75 308.50 1.40 1.40 7.9 Gutter Flow 489 308.50 302.00 1.33 5.00 1.6 ~ t V I HL: 34. ~ Time of Concentration T Used Existing Conditions 10 min.) 1 34.5 min. 4.5 min.