PUBLIC IMPROVEMENT PERMIT (PIP) APPLICATION I
Q T~l
MINIMUM SUBM17TAL REQUIREMENTS
V4 PIP Permit Application Fee 11r~~ / v f } T4116 41-e7
ttach 4 copies of a facility layout plan, which may irrtclude the following:
Location, identification, and dimensions of ROW and pavement edgelcurb)
Location of all proposed improvements
Location of all public utilities (existing) - dimensioned from right-of-way or back of curb, material, size
If applicable, the facility layout plan must Include the following
(these may be drawn on separate sheets):
A signage plan - include dimensions of sign(s), location from back of curb, materials, elevation drawing
Drainage and/or erosion control plan
roposed waterway alterations with supporting drainage report
Landscape plan showing the location and type of plantings (existing and proposed, both common
lames and scientific)
r'
WW-An ! a The cost estimate for relocating any public facilities associated with the work
4 electrical plan
Irrigation/Plumbing plan (must be sealed)
A Structural plan showing details with anchoring, attachment, and material description (must be sealed)
Private utilities plan- dimensioned from right-of-way or back of curb, material, size
Attach one copy of the following:
Indemnity agreements from abutting fee owners
APPLICANT/PRO ~IECT MANAGER'S INFORMATION (Party responsible for completion of all work associated with Ore project):
Name N 2-~~E1) !3. K i rl S
Mailing Address 2'S0 g F0965- Cif, fj6"W
State _r X-S Zip Code -7-7 8 VZ E-Mail Address
Phone Number. q,13 11 rl 4 -1409 O Fax Number _ CJW - 7 7 5 y01
PARTY RESPONS LE FOR MAIN ANCE (if a rty is a group, plterovIde Information for contact
Name/Group L v~ 91 179 ~ 0_
Mailing Address cz~ j E) cr 14-/ i-el l ~z v,.e,4*' City
'
State Zip Code `7' 0 Z E-Mail Address
Phone Number Fax Number
IDENTIFY THE FOLLOWING.
The total valuation of the wort: $ lo-
The mc7c~
total valuation of the signage: $
Estimated cost of future relocation of improvements: $
The total square footage of the site:
The total linear feet of water lines crossing under paved road:
PIP APPUCATION I ofZ
Piprpp.doo 2/5/02
2000 SDAS 1N3Nd013A3U 9860 69t RL8.0- 771 'PT 7A IRT inn
IDENTIFY THE TYPE OF WORK TO BE PERFORMED:
Awning
Benches
Bike racks
Care
Canopy
Demolition
Electrical
Facade
irrigation system
Masonry fence
Sign(s)
Waterway Altei
State Licensed Irrigator:
*Landscape Architect/Cc
`Sign Contractor:
Design Engineer.
*Structural Contractor:
(please describe): Identify party to perform this work:
.the starred itoms may not require that structural contractors, sign contractors, or landscapers perform
the work - contact applicable City Departments for determination
I hereby verify that the information contained in this application is true and complete. to the best of my knowledge.
I understand~tOt the Ntt as the authority to inspect the work to be conducted within the public right-of-way at any
time. I also uderstlpn to$ permit may be revoked at any time at the discretion of the City Qfticials.
signature
Date applied
:CIt ~J'
9/Z L
WVT h0ii36tiOri ity Engineer ale pproved
PIP APPLICATION 2 of 2
Pipapp,doc V5102
Number of Benches:
Number of Bike Racks:
*Structural Contractor.
'Structural Contractor:
r
UNIVERSITY PRESERVE SUBDIVISION
TIME OF CONCENTRATION CALCULATIONS
Drainage Basin #1A8
May 2002
1042001
By: JDB
Proposed Flow Path
Description
Length
Slope Data
SI a
Velocity
Time
ft
Begin Elev.
End Elev.
/o
(fps)
min.
Overland Flow
300
319.00
317.75
0.42
0.20
25.0
Shallow Concentrated Flow
660
317.75
308.50
1.40
1.40
7.9
Gutter Flow
489
308.50
302.00
1.33
5.00
1.6
~ t V I HL: 34. ~
Time of Concentration
T Used
Existing Conditions 10 min.) 1 34.5 min.
4.5 min.