FROM: Bridgette George, Assistant Development Manager
SUBJECT: COVENANT PRESBYTERIAN YOUTH BLDG(SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. Please address
the comments and submit the following information for further staff review:
Five (5) revised site and landscaping plans.
If there are comments that you are not addressing with the revised site plan, please
attach a letter explaining the details. If you have any questions or need additional
information, please call me at 764-3570.
Attachments: Staff review comments
cc: Covenant Presbyterian Church, Via fax 696-4334
Joe Schultz, Texcon, Via fax 690-9797
Blake Cathey, Via fax 694-8392
Case file #02-00500134
Home of Texas A&M University
at
STAFF REVIEW COMMENTS NO. 1
Project: COVENANT PRESBYTERIAN YOUTH BLDG(SP)-SITE PLAN -
COMMERCIAL (02-00500134)
PLANNING
1. Please include the following items in the title block of the site plan:
• Address and legal description of the property
• Date of this submittal
• Total site area
2. Clearly designate all easements on the plan.
3. If new plantings and a buffer are proposed, please include the location and a key of
the plantings on the plan.
Reviewed by: Jennifer Flanery Date: July 11, 2002
ENGINEERING
1. No Comments
Reviewed by: Spencer Thompson
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
5. Developer provides digital AutoCAD 2000i version of plat and/or site plan.
email to rbolin(@-ci.college-station.tx.us
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction
purposes.
8. Developer provides easements for electric infrastructure as installed for
electric lines.
Reviewed by: Ronnie Bolin
MISCELLANEOUS
Date:7-9-02
1. Irrigation system must be protected by either a Pressure Vacuum Breaker or
Reduced Pressure Principle Back Flow Device and installed as per City Ordinance
2394.
2. All BackFlow devices must be installed and tested upon installation as per City
Ordinance 2394.
Reviewed by: Rob Werley
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.