HomeMy WebLinkAbout02-00500125- 0007364608/12/02 14:12 %Y979 764 3496 DEVELOPMENT SVCS 19001
xx~ ACTIVITY REPORT ~xx
TRANSMISSION OK
TX/RX NO. 3527
CONNECTION TEL 98461461
CONNECTION ID
START TIME 08/12 14:04
USAGE TIME 07'18
PAGES 10
RESULT OK
08/12/02 14:18 r a979 764 3496 DEVELOPMENT SVCS
l0 0 01
ACTIVITY REPORT W i<
TRANSMISSION OK
TX/RX NO.
3528
CONNECTION TEL
98468252
CONNECTION ID
KLING ENGINEERIN
START TIME
08/12 14:13
USAGE TIME
05'10
PAGES
10
RESULT
OK
DEVELOPMENT SERVICES
TRANSMITTAL LETTER
IName/Firm: Kling Engineering & Surveying
Address: 4101 Texas Ave. Suite A
Bryan, TX 77802
Date: 06/21/02
Phone: 979-846-6212
Fax: 979-846-8252
We are transmitting the following for Development Services to review and comment: (Check all that apply.):
❑ Master Development Plan
❑ Preliminary Plat
Final Plat
❑ FEMA CLOMA/CLOMR/LOMA/LOMR
❑ Site Plan
❑ Grading Plan
❑ Landscape Plan
❑ Irrigation Plan
❑ Building Construction Documents
w/ ❑
Redlines
w/ ❑
Redlines
w/ ❑
Redlines
w/ ❑
Redlines
w/ ❑
Redlines
w/ ❑
Redlines
w/ ❑
Redlines
w/ ❑
Redlines
w/ ❑
Redlines
❑ Development Permit App.
❑ Conditional Use Permit
❑ Rezoning Application
❑ Variance Request
❑ Other - Please specify
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
❑
Waterline Construction Documents
w/ ❑
Redlines
❑
Sewerline Construction Documents
w/❑
Redlines
❑
Drainage Construction Documents
w/. ❑
Redlines
❑
Street Construction Documents
w/ ❑
Redlines
❑
Easement application with metes & bounds decsription
❑
Drainage Letter or Report
w/ ❑
Redlines
❑
Fire Flow Analysis
w/ ❑
Redlines
Special Instructions:
Indian Lakes Subdivision - Phase One
❑ TxDOT Driveway Permit
❑ TxDOT Utility Permit
❑ Other - Please specify
13 blueline, 1 application with checklist, 1 check $675.00 filing fee, 1 approved master
plan copy. Per Bridgette, we will bring in a tax certificate as soon as the tax office
has their computers up and running so they can print one out for us.
cc: Ray Crow - Brazos County Engineer
TRANSMMALLEMR Paul Clarke - Clarke & Wyndham
TRANSMUMOC 12/06/01 Chuck Ellison - Ellison Law Office
1Of 1
09/23/02 14:24 $409 775 0453 BRAZOS CO RD&BR 2001
to oM
gR T
ti w
r
a
A ti
rr c a
BRAZOS COUNTY ROAD & BRIDGE DEPT-
FACSIMILE TRANSMISSION COVER SHEET
Total number of pages_ (including cover sheet)
Date: ? - fg - a ~
To: 1 C ~2 ~1~n 12&0
Fax No:
From: Ai I~l a d2-J
Brazos County Road and Bridge Department
2617 Highway 21 West
Bryan, Texas 77803
Office # 979-822-2127
Fax # 979-775-0453
09/23/02 14:25 $409 775 0453 BRAZOS CO RD&BR 2002
os
BRAZOS COUNTY
ROAD AND BRIDGE DEPARTMENT
Richard F. Vance. P.E.. County Engineer
Alvin W. Jones, County Judge
Commissioner Tony Jones, Precinct i
Cnmmissionrr Willi9m Thnenton, Precinct 2
September 19, 2002
Fred Paine, P_E.
Kling Engineering & Surveying
4103 Texas Ave., Suite A
Bryan, Texas 77802
Re: Indian Lakes Subdivision - Construction Plan Review
Dear Mr. Paine:
Comoiissivner Charlus S. Jones, Precinct 3
Commissiotirr Carcy Caulcy, Precinct 4
5nclosed is a list of comments for your consideration concerning the construction plans (of
Indian Lakes Subdivision) you submitted for our review.
If you have any questions, please contact Ray Crow at (979)822-2127.
Sincerely,
iic'aard F. Vance, P. E.
Indian Lakcs - construction plans
cc; Ray Crow, CFM, Dir, of PlanninglTraffc
2617 Highway 21 West Bryan, Texas 77803 Office (979)822-.z127/Fax (979)775-0453
09/23/02 14:25 $409 775 0453 BRAZOS CO RD&BR 2003
Sept 19, 2002
Indian Lakes Subdivision
Construction Plan Review Comments
1. On Drawing ST #1, the pavement on Indian Lakes Drive is shown to taper from
30' wide to 20' wide. I believe Stewart Kling and Ray Crow visited about this
issue and agreed to taper; however, after further review, we are requesting full
width all the way to the subdivision boundary.
2. Throughout the subdivision construction plans are culverts under roads with rock
erosion control structures at each end. At each of those locations, the plans
show a drainage easement, usually 40' wide. The County requires an
approximate 100' wide easement.
3. At locations throughout the subdivision, there are shown landscape easements
that encroach the utility easements. Developer should be made aware that utility
easements must be cleared of all brush and trees, implying no landscaping in
utility easements-
4. At locations throughout the subdivision, there are shown slope easements at
varying widths and lengths, the County requires at least a 50' width- Also, the
lengths, which are not dimensioned need to be shown.
5. Drawing # ST4 shows a pipeline easement crossing under Indian Lakes Drive.
County needs a letter from the pipeline company approving this road crossing.
Location is between Sta. 47+00 and 48+00. Also at same location, an unpaved
private road intersects from both sides. County requires pavement on both sides
out to the proposed county right of way lines.
6. Drawing # ST90 near Sta_ 4-00 shows a well access road intersecting Chaco
Canyon Drive from both sides. County requires pavement on both sides out to
the proposed county right of way lines.
7. Drawing ST14 between Sta 3+00 and Sta 4+00, shows multiple pipeline
easements and a fiber optic line easement that cross under Calusa Springs
Drive. Brazos County requires letters from pipeline companies and the fiber
optic company approving this road crossing and drainage structure.
Final Plat - ETJ
(no public hearing required)
Applicant submits final plat application and minimum
submittal requirements, including construction documents,
by the P&Z deadline date.
I
Staff distributes plans to various internal and external
entities and begins review of the final plat;
comments are returned to applicant.
I
Requested changes, if any, are made to plans and returned
with the Mylar to the City.
I
Staff reviews changes and prepares recommendation in
staff report; packets are distributed to P&Z Commission.
I
P&Z reviews request and makes final decision.
I
Applicant submits seven (7) copies of the approved final plat
to the City which are forwarded to the County for approval.
I
Brazos County Commissioner's Court reviews requirements
and makes final decision.
I
Applicant posts a Construction Bond/Letter of Credit, based
on the approved Engineer's Estimate, prior to construction
I
City of CS files the final plat at the Brazos County
Courthouse after final plat approval notification from County
Bond/Letter of Credit returned to applicant: 1) Letter of
Completion received; 2) Infrastructure is accepted; and 3)
Two-year Maintenance Bond (10% of Construction Costs) is
received.