Loading...
HomeMy WebLinkAbout02-00500118- 00073449CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM June 27, 2002 TO: Joseph S. Abboud, Cingular Wireless, Via fax 713 - 782 -6806 FROM: Bridgette George, Assistant Development Manager SUBJECT: SOUTHLAND #517 (WTF) CUP - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and to be scheduled for a future Planning & Zoning Commission meeting: A Certificate of Compliance with FCC Regulations and Emission Standards; Two (2) revised site and landscaping plans. Easement Dedication Sheet and required documents. Please note that the Easement Dedication Sheet and the necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Shawdriea Thompson, GCS /CCC Realty Partnership, Via fax 713 - 964 -9133 Case file #02- 00500118 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 1 Project: SOUTHLAND #517 (WTF) CUP - CONDITIONAL USE PERMIT - USE & SITE (02- 00500118) PLANNING THIS IS A STOP REVIEW. This was not a complete submittal. Items that need to be addressed may affect the layout of the site. The following comments do not constitute a full site plan review. 1. You must provide a certificate of compliance with FCC regulations and emission standards. This is required for your submittal to be complete. 2. The distance from the cell tower to the property line is measured from the closest edge of the tower to the closest edge of the property line. This distance from the tower to the R -1 zoning boundary measures 116' on your site plan. This distance must be at least the height of your tower. The tower you have proposed is 120'. 3. Please provide current zoning on abutting parcels. 4. Please show 100 -year floodplain or floodway on or near the sight, or make a note referencing the FEMA map that there is none on the site. 5. Please provide building setback lines on the overall site plan. Section 7, Table A of the Zoning Ordinance. 6. The minimum driveway width is 20 feet. 7. Please show irrigation information for landscaping or provide a note on how irrigation system requirements will be met prior to issuance of C.O. 8. The required landscaping should be placed in such a way that it lessens the visual impact from one, or all of the abutting tracts of land that have residences or church facilities on them. The proposed placement of the landscaping does not do this. Reviewed by: JENNIFER FLANERY Date: JUNE 24, 2002 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer provides digital AutoCAD 20001 version of plat and /or site plan. email to rbolin _ci.college- station.tx.us 5. Developer provides load data for project. 6. Developer provides temporary blanket easement for construction purposes. 7. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). Reviewed by: Ronnie Bolin Date:6 -24 -02 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 3 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. Reviewed by: Rob Werley NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 3 of 3 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM August 14, 2002 TO: Joseph S. Abboud, Cingular Wireless, Via fax 713 - 782 -6806 FROM: Bridgette George, Assistant Development Manager SUBJECT: SOUTHLAND #517 (WTF) CUP - Conditional Use Permit Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Friday, August 23, 10:00 a.m. to be placed on the next available Planning and Zoning Commission meeting scheduled for September 5, 2002, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Ten (10) copies of the revised site plan; and, The required documents to process your Easement Dedication Sheet. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: GCS /CCC Realty Partnership, Via fx 713 - 964 -9133 Case file #02- 00500118 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 2 Project: SOUTHLAND #517 (WTF) CUP - 02- 00500118 PLANNING 1. Please provide the required documents with the Easement Dedication sheet. These documents are listed at the bottom of the Easement Dedication sheet. 2. Your plan shows the distance from the cell tower to the R -1 zoning boundary as 118'. This dimension is incorrect. Please re -scale the line. The distance when scaled is 116.5'. This is the maximum height that the cell tower may be. 3. Please replace the proposed chain link fence with a solid screening wood fence. 4. There is currently no variance process to the landscape section of the ordinance, which includes the irrigation requirements. You will be required to irrigate your plantings with an approved irrigation system. Please show your irrigation plan or provide a note on the plan that the irrigation plan must be approved prior to Certificate of Completion. Reviewed by: JENNIFER FLANERY Date: August 9, 2002 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2of2