HomeMy WebLinkAbout02-00500107- 00073345STAFF REPORT
Project Manager: Spencer Thompson Date: June 20, 2002
Email: sthompson @ci.college - station.tx.us
Item: Public hearing, discussion, and possible action on a Final Plat for the
University Preserve Subdivision consisting of 14 acres located near the
intersection of Dominik and Munson Ave. (02- 00500107)
Applicant: Mr. Dale Browne, Ash & Browne Engineering, Inc.
Staff Recommendations: Staff recommends approval of the Final Plat as
submitted.
Item Summary: The applicant is requesting Final Replat approval to allow for
development of the subject property into 26 lots (25 single family residential lots
and 1 storm water detention area). The property is zoned R -1, single - family and
has been under this zone classification since it was annexed into the City. This
development qualifies, under Section 18 of the Subdivision Regulations, for the
minimum lot area requirement of 8500 SF and the minimum lot width of the
"average of the lots in the block ". The average width of lots in the block was
determined to be 113'. All proposed lots meet this minimum lot width
requirement. In addition, the proposed subdivision is in compliance with the
deed restricted lot requirements.
State statute requires a public hearing for replats of property in areas that have
been zoned for residential use for 5 years or more.
Comprehensive Plan Considerations: The Land Use Plan shows the area as
Low Density Single Family Residential, which has a corresponding gross density
of 1/3 to 2 dwelling units per acre. The zoning of the property is R -1, Single
Family Residential. Under the R -1 zoning, development could generally occur up
to a net density of 8 dwelling units per acre. However, the lots must also meet
the provisions of Section 18 of the Subdivision Regulations, which further restrict
density and dimensions. With the application of Section 18, the allowable gross
density of the development is approximately 1.86 dwelling units per acre. The
density of the proposed subdivision is 0.56 dwelling units per acre
Standard lot width in an R -1 district is 50 feet. The average lot width requirement
that has been calculated for this development is 113 feet. Lot width is measured
at the front setback line. If the same standard is applied to this development,
then the "average of the lots in the block" requirement is met. The second
requirement under Section 18, is the requirement of a minimum lot area of 8500
SF. When you multiply the 113 -foot lot width by the standard R -1 lot depth of
100 feet, the minimum lot area allowed is 11,300 SF. The average lot area in
this subdivision is 22,869 square feet or just over' /2 acre per lot.
Item Background: A portion of the subject property was annexed into the City in
1949 and the remainder in 1956. At that time it was standard practice for newly
annexed property to come into the City under the R -1, or Single Family
Residential Zoning District. The original subdivision of the property into Lots 13,
14 and 15 of Woodland Estates occurred in 1941, prior to annexation.
The Commission approved a preliminary plat for this subdivision on March 21,
2002. The final plat has the following minor change from the approved
preliminary plat:
• One single family lot was removed to enlarge the storm water
detention facility. Lot 13 on the approved preliminary plat now
encompasses the entire storm water detention area totaling 0.90
acres.
At the previous public hearing before the Commission on March 21, 2002, many
surrounding property owners expressed concern regarding several issues
associated with the subdivision. The primary concerns expressed were:
• Location of the Private Street — Several area residents expressed
concern regarding the location of the private street (Lyceum Drive)
along Munson Avenue. Staff has worked closely with the design
engineer on the location of this street to make sure that it's as far
away from the curve in Munson Avenue as possible for safety
reasons. The developer explored the possibility of access through
private property to Dominik and was not successful in acquiring
property off -site. Staff feels that the location of the street is in the
best possible location given the existing physical constraints.
• Traffic — Many of the area residents expressed concern regarding
the increased traffic to the area especially to Munson Avenue. In
response to these concerns, the City hired an independent Traffic
Impact Assessment by Joseph D. Blaschke, D. Eng., P.E. (See
attached report in your packet.) Dr. Blaschke summarizes that
"From a traffic engineering perspective, the proposed
redevelopment along Munson Avenue will not generate sufficient
additional traffic to either create traffic congestion or cause a
concern to public safety. In addition, no modifications to Munson
Avenue would be necessary to accommodate the increased traffic
volume."
• Drainage — Many of the area residents expressed concern with the
increased run -off created by this development. Two property
owners along Dominik complained of flooding problems during
moderate rainfall. Currently, drainage flows from the north corner
of the subject property, south towards the intersection of Munson
and Dominik. With development of this subdivision, the run -off will
be collected along Lyceum and Sanctuary Drives to the detention
pond. The pond will discharge into a drainage swale that connects
to Munson Avenue. Property owners along Dominik should
experience a significant decrease in the amount of run -off to the
rear of their property.
Related Advisory Board Recommendations:
Parks Board: The Board met on 4/9/02 and voted to accept a fee in lieu
of land dedication for this subdivision. The total parkland dedication fees,
including land and development, are $457 per new dwelling unit.
Commission Action Options: The Commission has final authority over the final
plat. The options regarding the final plat are:
■ Approval with conditions;
■ Approval as submitted;
■ Denial;
■ Defer action only at applicant's request; or,
■ Table only at applicant's request.
Supporting Materials:
1. Infrastructure and Facilities
2. Location Map
3. Application
4. P &Z Minutes from 3/21/02
5. Letter from Dr. Joseph D. Blaschke, P.E.
6. Information submitted by Dr. Charles Pinnell
7. Copy of final plat
INFRASTRUCTURE AND FACILITIES
Water: There is an existing 6" water line along Munson. A water
analysis shows that there is sufficient capacity to serve the subdivision
with required fire flows.
Sewer: A sewer analysis was performed for the subdivision illustrating
that there is sufficient capacity in the City wastewater system to
accommodate the increase in flows from the proposed subdivision.
Streets: Munson street is classified as a residential street. The
subdivision will connect to Munson by way of a gated, private street. The
Subdivision Regulations provide for gated private streets with specific
design and maintenance criteria.
Off -site Easements: None required.
Drainage: This subdivision is required to comply with the City's Drainage
Ordinance. The Plat depicts a 0.907 acre lot set aside solely for
detention.
Flood Plain: None exists on the property.
Oversize request: None requested.
Impact Fees: N/A
NOTIFICATION:
Legal Notice Publication(s): The Eagle; 6 -14 -02
Advertised Commission Hearing Dates(s): 7 -01 -02
Advertised Council Hearing Dates: N/A
Number of Notices Mailed: 65
Response Received: Numerous inquiries and requests for additional
information. Also one written statement from Dr. Pinnell, also included in
your packet.