Loading...
HomeMy WebLinkAbout02-00500110- 00073334LETTER OF COMPLETION d r CITY ENGINEER DATE: 1-17-0 CITY OF COLLEGE STATION COLLEGE STATION, TEXAS Dear Sir: RE: COMPLETION OF First United Methodist Church The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under city inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any sub - contracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The net yeear warranty is hereby affirmed and agreed to by l and by their sub - contractors as indicated by signatures below. WORK COMPLETED Fire Hvdran DATE 1 -13 -03 Owner: F � 'J 0 ' - r uurCk_� Address: j a, S Lkj r �� �- ti Signature: 1,�� . 1 __ - Contractor: Elliott Constr uction, Ltd. 3 Utility Representative (s) C EP E & APPROVAL City Engineer Address: P.O. Box 510 Wellb TX 7 7881 Signature: 11" — 10112/92 dg