HomeMy WebLinkAbout00-00000137- 00073250SUBMIT APPLICATION AND TIIIS
LIST CHECKED OFF WITH 13
FOLDED COPIES OF PLAT FOR REVIEW
FINAL PLAT MINIMUM REQUIREMENTS
(ALL CITY ORDINANCES MUST BE MET)
INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
(Requirements based on field survey and marked by monuments and markers.)
1. Drawn on 24" x 36" sheet to scale of 100' per inch or lazger.
~ .~~ 2,-'"Vicinity map which includes enough of surrounding azea to show general location of subject property in
relationship to College Station and its City Limits. No scale required but include north arrow.
3. Title Block with the following information:
Name and address of subdivider, recorded owner, planner, engineer and surveyor.
Q~ Proposed name of subdivision. (Subdivision name & street names will be approved through
Brazos County 911.) (Replats need to retain original subdivision name.)
~ Date of preparation.
®' Engineer's scale in feet.
~ Total azea intended to be developed.
4. North Arrow.
-~ 5
N(R 0 6
~" 7
Subdivision boundary indicated by heavy lines.
If more than 1 sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch or larger.
All applicable certifications based on the type of final plat.
~~ Ownership and Dedication
v 0~ Surveyor and/or Engineer
~/~ City Engineer (and City Planner, if a minor plat)
/~ Planning and Zoning Commission (delete if minor plat)
/~ Brazos County Clerk
~ Brazos County Commissioners Court Approval (ETJ Plats only)
' 8. Paid tax certificates.
9. If submitting a replat where there aze existing improvements, submit a survey of the subject property showing
the improvements to ensure that no encroachments will be crcat~;d.
~ 10. If using private septic systems, add a general note on the plat that no private sewage facility may be installed
~~ ~ on any lot in this subdivision without the issuance of a license by the Brazos County Health Unit under the
provisions of the private facility regulations adopted by the Commissioner's Court of Brazos County, pursuant
/ to the provisions of Section 21.004 of the Texas Water Code.
11. Location of the 100 Year Floodplain and floodway, if applicable, according to the most recent available data.
12. Lot corner markers and survey monuments (by symbol) and clearly tied to basic survey data.
FINAL PLAT CHECKLIST L of 2
FNLPCK.DOC 03/25/99
^ 13. Matches the approved preliminary plat and/or master development plan.
~ 14. The location and description with accurate dimensions, bearings or deflection angles and radii, area, center
angle, degree of curvature, tangent distance and length of all curves for all of the following: (Show existing
items that are intersecting or contiguous with the boundary of or forming a boundary with the subdivisioq as
well as, those within the subdivision).
Existing Proposed
^ ^
^ ^
~~) ~~ ^ ^
^ ^
~-tP~w~
Streets. Continuous or end in a cul~e-sac, stubbed out streets must end into a temp. turn around
unless they aze shorter than 100 feet.
Public and private R.O.W. locations and widths. (All existing and proposed R.O.W.'s sufficient to
meet Thoroughfare Plan.)
Street offsets and/or intersection angles meet ordinance.
Alleys.
^ ^ Easements.
^ ~ A number or letter to identify each lot or site and each block.
^ ^ Greenbelt azea/pazk linkages/pazkland dedication (All proposed dedications must be reviewed by
the Parks and Recreation Board prior to P & Z Commission consideration.)
15. Construction documents for all public infrastructure drawn on 24" x 36" sheets and properly sealed by a
Licensed Texas Professional Engineer that include the following:
^ Street, alley and sidewalk plans, profiles and sections. One sheet must show the overall street,
alley and/or sidewalk layout of the subdivision. (may be combined with other utilities).
^ Sanitary sewer plan and profile showing depth and grades. One sheet must show the overall sewer
layout of the subdivision. (Utilities of sufficient sizeldepth to meet the utility master plan and any
future growth areas.)
^ Water line plan showing fire hydrants, valves, etc. with plan and profile lines showing depth and
grades. One sheet must show the overall water layout of the subdivision. (Utilities of sufficient
size/depth to meet the utility master plan and any future growth areas.)
^ Storm drainage system plan with contours, street profile, inlets, storm sewer and drainage
channels, with profiles and sections. Drainage and runoff azeas, and runoff based on 5, 10, 25, 50
and 100 year rain intensity. Detailed drainage structure desigq channel lining design & detention
if used. One sheet must show the overall drainage layout of the subdivision.
^ Detailed cost estimates for all public infastructure listed above sealed by Texas P.E.
^ Drainage Report.
^ Erosion Control Plan (must be included in construction plans).
^ 16. All off-site easements necessary for infrastructure construction must be shown on the final plat with a volume
~'`f ~~ and page listed to indicate where the separate instrument easements were filed. Separate instrument easements
must be filed prior or concurrently with Final Plat.
17. Are there impact fees associated with this development? ^ Yes Leo
Impact fees for R-1, R-2, & R-3 zoned final plats, must be paid prior to filing.
^ 18. Will any construction occur in TexDOT rights~f--way? ^ Yes [D~No
If yes, TexDOT permit must be submitted along with the construction documents.
NOTE:
1. We will be requesting the corrected Final Plat to be submitted in digital form if available prior to filing the plat
at the Courthouse.
2. If the construction azea is greater than 5 acres, EPA Notice of Intent (NOi) must be submitted prior to
issuance of a development permit.
FINAL PLAT CHECKLIST 2 of 2