Loading...
HomeMy WebLinkAbout00073160Bridgette George - New Development Page 1 From: Jennifer Reeves To: Bridgette George Date: 2/25/00 10:53AM Subject: New Development Week of 2/21/00 Service Maintenance: (00-39) Developer install's 2-2" conduit from existing stub out, to proposed transformer. Developer responsible for installing 2-2" conduit from transformer to adjoining property line. Developer install's 1-3" conduit to each building for service wire. Developer install's all conduit per city spec and design. Developer needs to provide 7 % ft. easement along west side of property. Developer will need to provide a 20' easement to cover primary electric and transformer going through property. Westfield Addition 2,3 &4: (00-37) Developer responsible for Providing and Installing all conduit per City spec and design. Developer responsible for Providing and Installing street lights per City spec and design. Developer responsible for Providing easements to cover all Electric Primary Lines and Equipment. Fairfield at Luther : (00-40) Developer needs to provide a 10' easement along 2818 of property. Developer needs to provide a 20' easement along south side of property. Developer needs to provide easements to cover primary electric lines and equipment that will be going on this property. Jennifer Reeves Electrical Division/Planning & Projects Tel: (409) 764-3502 Fax: (409) 764-3452 Mobile: (409) 777-1925 College Station: Counting on You ! Fill out your Census 2000 Form and mail it back by April 1, 2000