Loading...
HomeMy WebLinkAbout00073145STAFF REPORT Item: Consideration of a Final Plat for 14.226 acres - Westfield Addition Phase I, located along Graham Road just west of the CSISD new middle school site. (98-205) Applicant: John Szabuniewicz, Developer Item Summary: A preliminary plat for this property was approved by Council in 1998. This final plat is in compliance with the preliminary that was approved. This is the first phase of a four phase project that will plat this area from the CSISD new middle school to the future Victoria extension for single family development. The Parks Board reviewed the parkland dedication shown on this plat and approved the location. The creek on this plat is the north fork of Lick Creek and is shown on the draft Greenway Master Plan. This project along with the Alexandria Subdivision to the south of this tract have shown this creek area to be parkland dedication. Budgetary & Financial Summary: NA Staff Recommendations: Recommends approval of the request as presented with the following conditions: 1. Remove topo from the final plat 2. Provide paid tax certificates 3. Provide additional right-of-way on Graham Road (shown with vol/pg). 4. Easements for the sanitary sewer extension need to be provided through Phase I and Phase IV(shown by vol/pg for Phase IV). 5. Change the date on the final plat 6. Provide information regarding detention onsite/offsite or the ability for the downstream system to accommodate the additional runoff. If provided for onsite, one lot may be lost and need to be changed to a drainage easement. A pond located on the property will need to be dedicated in a public drainage easement but with homeowners association documents providing for maintenance of the pond. 7. Provide final hydraulic/hydrology information to establish the limits of the floodplain and assure that there are 4 acres of parkland dedication outside of the floodplain on the preliminary plat (per parks board minutes). Commission Action Options: The Commission has final authority over the final plat. The options regarding the final plat are approval as submitted, approval with conditions, or denial. Defer action or table only at applicant's request. Supporting Materials: 1. Location Map 2. Application 3. Engineering Information and Notification Information 4. Copy of Final Plat o:\group\deve_ser\stfrpt\98-205v.doc INFRASTRUCTURE AND FACILITIES Water: Water is provided along Graham Road and will need to be provided into the plat to serve the properties. Sewer: Will be provided from the Springbok subdivision along the north fork of Lick Creek. A part of this plat is in the Graham Road impact fee area, however this portion will be deleted with the 6th year update on this impact fee area due out in 1999. Off-site Easements: Will be required for sanitary sewer and perhaps drainage depending on possible detention requirements. Streets: Westfield is shown as a combination 60' ROW and 50' ROW and serves the purpose of both a residential and residential collector for the subdivision. Drainage: Drainage easement locations, if required, will be determined with the final submittal of a drainage report. Sidewalks: Will be required internally. The sidewalk along Graham Road will be constructed with the City's Graham Road CIP project. Flood Plain: Floodplain exists on this property. The developer has still to confirm the final location of the floodplain boundary. Once determined the line will be located properly on the final plat and a total parkland dedication of 4 acres outside the floodplain on the preliminary plat will be verified. Impact Fees: N/A NOTIFICATION: Legal Notice Publication(s): N/A Advertised Commission Hearing Dates(s): 3-25-99 Advertised Council Hearing Dates: N/A Number of Notices Mailed to Property Owners Within 200': N/A Response Received: None as of date of staff report o:\group\deve_ser\stfrpt\98-205v. doc STAFF REPORT Item: Consideration of a Preliminary Plat for Westfield Addition Phase II located in the 700 block of Graham Road, west of Westfield Phase I; aproximately 5.3 acres. (00-37) Applicant: John Szabuniewicz for Westfield Addition, Ltd. Staff Recommendations: Seeing that this submittal has met the requirements for a Preliminary Plat, City staff recommends approval of this item. Staff Member: Spencer Thompson, Development Services/ Engineering Item Summary: The subject property is located on Graham Road, west of Phase I The property is currently zoned R-1. The 5.3 -acre development will consist of 66 single- family lots. The parkland dedication requirement for this development has been met with the dedication of 4.3 -acres to the east in Phase I Phase II abuts Lick Creek South Fork. A culvert/ pathway will be installed with Phase III for stormwater detention. The resulting 100 -year floodplain will be dedicated to the City's Greenways Program. Comprehensive Plan Considerations: The City's Thoroughfare Plan impacts this phase of the Westfield Addition by way of improvements to Graham Road. ROW has been dedicated for this purpose. Phase III will include the extension of Victoria Avenue. Parks and Open Space have been addressed in the design of Westfield Addition with the dedication of parkland (Phase 1) and greenway (Phase 111). Commission Action Options: The Commission has final authority over the Preliminary Plat. Options regarding this item are as follows: • Approval as submitted • Approval with recommendations • Denial • Defer action • Table only at applicant's request Supporting Materials: 1. Location Map 2. Application 3. Infrastructure and Facilities 4. Copy of Preliminary Plat P: I HTL TR I PZL TR I PRO D PZ 20001 PZ04093. DO C INFRASTRUCTURE AND FACILITIES Water: Water for this development will be supplied by an existing 12" waterline along Graham Road. Sewer: An existing 8" sewer is available and is suitable for this size development. Streets: Internal urban streets will be constructed to serve Phase II. Access into the subdivision from Graham Road will be through Meadow View Drive and Westfield Drive in Phase I. Off-site Easements: Right-of-way has been granted for the construction of Graham Road. Drainage: The developer has submitted a drainage report that includes the construction of a culvert across Lick Creek which will curtail run-off from Phases II, III and IV. The culvert will create a detention pond area utilizing the natural channel that is to be dedicated to the City as greenway. Flood Plain: The 100 -year floodplain has been determined for this project and is depicted on the preliminary plat as hatched area. The floodplain is detained behind a culvert/ pathway to be constructed in Phase III. Minimum slab elevations have been established for homesites along the floodplain area. NOTIFICATION: None Required. P: I HTL TR I PZL TR I PRO D PZ 20001 PZ04093. DO C