HomeMy WebLinkAbout00073133DEVELOPMENT PERMIT
PERMIT NO. 500034
DP-WELLBORN SUD GRNS PRAIRIE WATER LINE
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Greens Prairie Rd. R.O.W.
DATE OF ISSUE: April 27, 2000
SITE ADDRESS:
4118 GREENS PRAIRIE RD W
DRAINAGE BASIN:
VALID FOR 12 MONTHS
OWNER:
WELLBORN WATER SUPPLY CORP
PO BOX 250
WELLBORN, TX 77881
TYPE OF DEVELOPMENT:
SPECIAL CONDITIONS:
NONE
CONTRACTOR:
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation
occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor
shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner
and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy
machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any
operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure
that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage
facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply.
Contractor
a
Date
Date
Date