Loading...
HomeMy WebLinkAbout00073130MEMORANDUM February 24, 2000 TO: Planning and Zoning Commission FROM: Jessica Jimmerson 4 SUBJECT: Final Plat for BUSINESS CENTER @ CS, LTS 1&9, BK 5 Item: Consideration of a Final Plat for the Business Center at College Station, Lots 1 &2, Block 5, consisting of 56.125 acres located adjacent to Lot 1, Block 6. (0-32) Applicant: City of College Station Item Summary: This phase is the final section of the Business Center to be platted. This subdivision of the remaining 56.125 acres will create 2 lots of 39.198 acres and 14.50 acres, and will also dedicate right of way for Lakeway Drive and Technology Way. This will be a change from the original Master Plan, which showed the area divided into 3 lots, and Technology Way as a loop. The reason for this change is to allow maximum development of the land, to avoid lot configurations that might require variances to develop and to ensure the availability of adequate funding for Lakeway Drive, in order to comply with the Thoroughfare Plan. The Business Center is zoned M-1 and shown on the Land Use Plan as Industrial R&D. Staff recommends approval with the condition that the attached Staff Review Comments are addressed. Attachments: 1. Area map 2. Application 3. Staff Review Comments #1 JAPZTEXTTZ02763.D0C Page 1 of 1 STAFF REVIEW COMMENTS No.1 4,1 Project: BUSINESS CENTER @ CS, LTS 1&2, BK I (FP) (0-32) 1. This should be Block 4, not Block 7. The 39+acre lot should be Lot 1, and the 14.5 acre lot should be Lot 3. 2. Change the building setback note to read - "Except where indicated, all building setback lines shall comply with the City of College Station Zoning Ordinance No. 1638. All frontages need to show a 40 foot building setback line. 3. 100-year flood hazard areas need to be shown as an easement that is protected from encroachment. 4. The Business Center and the Pebble Creek area have agreed that along stream AC-1, both property owners will provide for the ultimate 100-year flood to be contained in a dedicated drainage easement in lieu of detention. 5. Remove the City Council Certification. Plats no longer go to Council for approval. 6. Please add a note to the plat that if the areas of Lot 2 along Quality Circle and Lakeway Drive were to ever be filled and developed a 30 foot wide Landscape, Access and Underground Utility Easement would be required along those frontages. 7. Show the landscape easement line as continuous along Technology Way, south of the line between lots 1 & 2. 8. Show the call information for the public utility easement that is to lie over the existing sanitary sewer line that crosses Lot 2. Also add a descriptive note identifying what kind of easement along with the width. 9. Change the line type for the 20-foot wide drainage easement that crosses the proposed Viacom (Destia) site to a broken line per the other easements. 10. At the eastern corner of Technology Way and Lakeway Drive, the landscape easement lines should meet a cutoff section 30 feet long and lying at a 45 degree angle to the intersection, rather that at a simple intersecting point. Reviewed by: JESSICA JIMMERSON Date: 24-Feb-00 J:IPZTEXT1PZ02760.DOC Page 1 of 1 STAFF REVIEW COMMENTS No. 1 3 ~~ Project: BUSINESS CENTER @ CS, LTS 1&~, BK it {FP) (0-32) 1. This should be Block 4, not Block 7. The 39+acre lot should be Lot 1, and the 14.5 acre lot should be Lot 3. 2. Change the building setback note to read - "Except where indicated, all building setback lines shall comply with the City of College Station Zoning Ordinance No. 1638. All frontages need to show a 40 foot building setback line. 3. 100-year flood hazard areas need to be shown as an easement that is protected from encroachment. 4. The Business Center and the Pebble Creek area have agreed that along stream AC-1, both property owners will provide for the ultimate 100-year flood to be contained in a dedicated drainage easement in lieu of detention. 5. Remove the City Council Certification. Plats no longer go to Council for approval. 6. Please add a note to the plat that if the areas of Lot 2 along Quality Circle and Lakeway Drive were to ever be filled and developed a 30 foot wide Landscape, Access and Underground Utility Easement would be required along those frontages. 7. Show the landscape easement line as continuous along Technology Way, south of the line between lots 1 & 2. 8. Show the call information for the public utility easement that is to lie over the existing sanitary sewer line that crosses Lot 2. Also add a descriptive note identifying what kind of easement along with the width. 9. Change the line type for the 20-foot wide drainage easement that crosses the proposed Viacom {Destia) site to a broken line per the other easements. 10. At the eastern corner of Technology Way and Lakeway Drive, the landscape easement lines should meet a cutoff section 30 feet long and lying at a 45 degree angle to the intersection, rather that at a simple intersecting point. Reviewed by: JESSICA JIMMERSON Date: 24-Feb-00 J:IPZTEXT~PZ02760.DOC Page 1 of 1 MEMORANDUM February 24, 2000 TO: Planning and Zoning Commission FROM: Jessica Jimmerson SUBJECT: Final Plat for BUSINESS CENTER ~ CS, LTS 1&Q, BK s Item: Consideration of a Final Plat for the Business Center at College Station, Lots 1 &2, Block 5, consisting of 56.125 acres located adjacent to Lot 1, Block 6. (0-32) Applicant: City of College Station Item Summary: This phase is the final section of the Business Center to be platted. This subdivision of the remaining 56.125 acres will create 2 lots of 39.198 acres and 14.50 acres, and will also dedicate right of way for Lakeway Drive and Technology Way. This will be a change from the original Master Plan, which showed the area divided into 3 lots, and Technology Way as a loop. The reason for this change is to allow maximum development of the land, to avoid lot configurations that might require variances to develop and to ensure the availability of adequate funding for Lakeway Drive, in order to comply with the Thoroughfare Plan. The Business Center is zoned M-1 and shown on the Land Use Plan as Industrial R&D. Staff recommends approval with the condition that the attached Staff Review Comments are addressed. Attachments: 1. Area map 2. Application 3. Staff Review Comments #1 J:\PZTEXT\PZ02763.DOC Page 1 of 1