Loading...
HomeMy WebLinkAbout00073128PROPOSAL FOR BUSINESS CENTER ROADWAY DEVELOPMENT Proposal includes: 547' cul-de-sac (Technology Way) Elimination of Technology Way Loop Opens approximately 28 acres for development Infrastructure: roadway, drainage, water line, and electric wastewater service available to both lots (extension may be needed at a later date depending on building layout) Does not include: landscaping and amenities Budget Impact: Technology Way Loop -$750,000 Technology Way cul-de-sac + 250 000 Savings $500,000 Prior phase developments have ranged in cost from $38,000-$49,000 per acre. Phase III, under this proposal, could be opened up for development at approximately $9,500 per acre (does not include land cost). Status of Land: Committed:* 58 acres Uncommitted and accessible: 52 acres -16.68 ac narrow, 5.0 ac, 30.74 frontage Unaccessible at this time 27 acres Total: 137 acres *Either developed or development pending FACSIMILE COVER SHEET CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (409)764-3570 / Fax (409)764-3496 Date: February 7, 2000 # of pages included cover: 2 If you did not receive a complete fax, please call our office immediately for a new transmittal. TO: Curtis Strong FAX: 731-0096 COMPANY: Strong Surveying RE: Business Center Final Plat FROM: Natalie Ruiz PHONE: (409)764-3570 COMPANY: City of College Station REMARKS: ❑ Urgent ❑ For your review ® Replay ASAP ❑ FYI Attached is page 2 of the Business Center final plat that was submitted for today's deadline. There is some information missing that we must have in order to process the plat. Please provide the floodplain acreage and the total linear footage of streets sidewalks sewer lines water lines channels storm sewers & bike lanes/paths. If we receive this information today, we will keep the plat on the same schedule. Thank you, Natalie COLLEGE STATION P. O. Box 9960 1101 Texas Avenue College Station, TX 77842 Tet 409 764 3500 February 7, 2000 Curtis Strong, R.P. L.S. Strong Surveying 1673 Briarcrest Drive, Suite A102 Bryan, TX 77802 Re: Business Center at College Station Block 7 final Plat Revisions Dear Curtis, I have finished my review of the proposed final plat of block 7 of the Business Center at College Station, and have the following comments. The first three we discussed this morning, with the fourth being new. 1. Show the landscape easement line as continuous along Technology Way, south of the line between lots 1 and 2. 2. Show the call information for the public utility easement that is to lie over the existing sanitary sewer line that crosses lot 2. Also add a descriptive note identifying what kind of easement along with the width. 3. Change the line type for the 20-foot wide drainage easement that crosses the proposed Viacom (Destia) site to a broken line per the other easements. 4. At the eastern corner of Technology Way and Lakeway Drive, the landscape easement lines should meet at a cutoff section 30 feet long and lying at a 45 degree angle to the intersection, rather than at a simple intersecting point. Should you have any questions or need further detail, please do not hesitate to call. Otherwise, please provide me with a revised copy when the plat is re-submitted to the Development Services Department. Thanks for your cooperation. Sincerely: ~~ Brett McCully, P.E. Assistant City Engineer Xc: Kim Foutz Jeff Tondre Home of Texas A&M University FACSIMILE COVER SHEET CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (409)764-3570 /Fax (409)764-3496 Date: February 7, 2000 # of pages included cover: 2 If you did not receive a complete fax, please call our office immediately for a new transmittal. TO: Curtis Strong FAX: 731-0096 COMPANY: Stron~ying RE: Business Center Final Plat FROM: Natalie Ruiz PHONE: (409)764-3570 COMPANY: City of College Station REMARKS: ^ Urgent ^ For your review ®Replay ASAP ^ FYI Attached is page 2 of the Business Center final plat that was submitted for today's deadline. There is some information missing that we must have in order to process the plat. Please provide the floodplain acreage and the total linear footage of streets, sidewalks, sewer lines, water lines, channels, storm sewers & bike lanes/paths. If we receive this information today, we will keep the plat on the same schedule. Thank you, Natalie PROPOSAL FOR BUSINESS CENTER ROADWAY DEVELOPMENT Proposal includes: 547' cul-de-sac (Technology Way) Elimination of Technology Way Loop Opens approximately 28 acres for development Infrastructure: roadway, drainage, water line, and electric wastewater service available to both lots (extension may be needed at a later date depending on building layout) Does not include: landscaping and amenities Budget Impact: Technology Way Loop -$750,000 Technology Way cul-de-sac + 250 000 Savings $500,000 Prior phase developments have ranged in cost from $38,000-$49,000 per acre. Phase III, under this proposal, could be opened up for development at approximately $9,500 per acre (does not include land cost). Status of Land: Committed:* 58 acres Uncommitted and accessible: 52 acres -16.68 ac narrow, 5.0 ac, 30.74 frontage Unaccessible at this time 27 acres Total: 137 acres *Either developed or development pending ~~11~'~~ ~~ e d f~ ord in: Name of Plat: a r ~ Qn: Mar P8,2AAA at A3:21PM Asa Mats ~"~~~~~~,~ p Q~~.- ~ ~1' l Docu~en! Nuiber: 871178 A t iaun 55, AA Owner(s): Receipt Nu ber - 148863 y Barbara Johnson 1 8TA1E ff TEXiS COII(IY ff I hereby certify that thi s instrwent Mas Block Lots thru p ed ~ped h~on by oe ~ ~~ le Block thru e du recorded in the of the naoed records of: ~ Block thru ., 9R<II05 ~,~ as statped hereon by ~e. acres out of abstract ~~r' B8s ~~~~ abstract I~iBLE M~iY AiN HARD, COltfiY O~RII BRAt(151111tlTY,