Loading...
HomeMy WebLinkAbout00073018CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM March 7, 2002 TO: Randy French, BCS Development Co ., Via fax 690 -9069 FROM: Natalie Thomas Ruiz, Developmefit.AAa / SUBJECT: WESTFIELD VILLAGE PH 1 (FP) - Final Plat Staff reviewed the above - mentioned final plat as requested; however, we will not be able to accept the plat for filing until the minimum requirements in the Subdivision Regulations are met. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for additional review. Ten (10) copies of the revised final plat; and, Two (2) copies of associated construction documents. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Mike McClure, McClure Engineering, Via fax 693 -2554 Case file #2- 500038 Home of Texas A &M University CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM March 7, 2002 TO: Randy French, BCS Development Co., Via fax 690 -9069 FROM: Natalie Thomas Ruiz, Development Manager SUBJECT: WESTFIELD VILLAGE PHI (FP) -Final Plat Staff reviewed the above - mentioned final plat as requested; however, we will not be able to accept the plat for filing until the minimum requirements in the Subdivision Regulations are met. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for additional review. Ten (10) copies of the revised final plat; and, Two (2) copies of associated construction documents. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Mike McClure, McClure Engineering, Via fax 693 -2554 Case file #2- 500038 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 1 Project: WESTFIELD VILLAGE PH 1 (FP) -FINAL PLAT (2- 500038) ENGINEERING This is a STOP REVIEW. Staff was unable to perform a complete review of the final plat and associated construction documents due to the fact that it does not comply with Sections 8 -0 and 8 -P of the Subdivision Regulations. More specifically, the following comments are provided for your information in order to comply with the minimum requirements: 1. According to your water line construction drawings you are not connecting to an existing water line. Please submit construction drawings for the portion of water line connecting to an existing water line. A plat cannot be considered if utilities (water) are not being provided to each platted lot. 2. According to your water line construction drawings you are not constructing the 18" water line in a PUE or City ROW. Please submit documentation of necessary off - site easement(s). 3. According to your sewer construction drawings you are not constructing (at least a portion of) the public system in a dedicated PUE or City ROW. Please submit documentation of necessary on -site and off -site easement(s). A plat cannot be considered if utilities (sewer) are not being provided to each platted lot. 4. According to your storm sewer construction drawings you are not constructing (at least a portion of) the line in a dedicated PUE or City ROW. Please submit documentation of necessary on -site and off -site easement(s). 5. In your water analysis for "Phase 1 only ", you include a water line along Newport Lane that ties into the 18" water line along Barron. This line does not exist and does appear in your construction drawings. It, therefore, seems invalid to include it. Reviewed by: Spencer Thompson Date: March 7, 2002 PLANNING 1. Note how the temporary emergency vehicular accessway will be addressed until such time as a permanent secondary access point is in place. 2. How does each lot correlate to the lot typicals shown on the preliminary plat? Reviewed by: Jessica Jimmerson Date: March 4, 2002 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2of2 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM March 20, 2002 TO: Randy French, BCS Development Co., Via fax 690 -9069 FROM: Bridgette George, Assistant Development Manager SUBJECT: Westfield Village Ph.1 Please review the attached staff review comments and return the following: Two (2) copies of the revised construction documents. Please call Spencer Thompson at 764 -3570 if you have any questions regarding the comments. cc: Mike McClure, McClure Engineering, Via fax 693 -2554 Case file #2- 500038 R: I HTL TR I PZL TR I PROD I PZ20021 P0005962. D O C r CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM April 15, 2002 TO: Randy French, BCS Development Co., Via fax 690 -9069 FROM: Bridgette George, Assistant Development Manager SUBJECT: Westfield Village Ph.1 Please review the attached staff review comments and return the following: Two (2) copies of the revised construction documents, Easement dedication sheet and required documents; and, NOI. Please call Spencer Thompson at 764 -3570 if you have any questions regarding the comments. CC: Michael McClure, McClure Engineering, Via fax 693 -2554 R: WTLTRIPZLTRIPRODIPZ20021P0006082. DOC WESTFIELD VILLAGE PH 1 (FP) (02- 00500038) ENGINEERING REVIEW COMMENTS No. 2 1. Sheet 2: Concerning the 6" drain line under Spring Mist Drive. This line is in the ROW. This line must be included in a PIP application. It will be required to be maintained by the HOA. 2. Sheet 2: The drawing calls out a Type 4 curb. The Type 4 curb is not approved. It appears on several sheets. 3. Sheet 5: Please submit an easement for the storm line shown on this sheet where it is outside the bounds of the Westfield Village Phase 1 Final Plat. 4. Sheets 7 and 7A are new sheets and have not been previously reviewed. 5. Sheet 8: Please submit an easement for the sewer line shown on this sheet where it is outside the bounds of the Westfield Village Phase 1 Final Plat. You need not include the proposed Newport ROW shown on the Alexandria Phase 5 Final Plat. 6. Sheet S2: You should have received an e-mail from Mr. Mark Smith, Director of Public Works, concerning sewer line connection material. The City specification calls for Schedule 40 or SDR 21, ASTM 2241. Please see S.203.5 C of the specifications. We realize that you may have used SDR 26 on numerous projects in the past, however, it appears this department as overlooked this item. We have been asked to ensure compliance as per S.203.5 C. Thank you for your cooperation. 7. Please provide a sample calculation to be used with the spreadsheet and HGL plots. 8. Concerning your Development Permit, the two remaining items to be submitted are the NOI and the easements. Reviewed by: Spencer Thompson Date: April 15, 2002 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City of College Station will constitute a completely new review. R:1HTL TRI PZL TRI PRODI PZ20021 P0006082. DOC the Commission to make the determination. In this case, staff and the applicant have agreed on the proposed modifications at the preliminary plat stage. Summary of the modifications requested: ➢ Street pavement widths - no modification requested ➢ Sidewalks /Trail standards - in lieu of internal sidewalks, public access trails will be built throughout the project. The trails will be a minimum of 8 feet in width. ➢ Minimum lot areas and dimensions, with special consideration for those lots that are located adjacent to the floodplain or greenway areas.- lots will be a minimum of the typicals, either by dimensions or area as shown on the plat. ➢ Building setbacks - will vary depending on the typical lot. Some of the benefits of this plan include preservation of open space in prominent locations, preservation of natural resources, connectivity of natural areas within the development and to those in surrounding areas, traffic calming, and avoidance of cul- de -sacs. Because this is a PD zoned area, it has been determined that it is extremely helpful to include additional information on the plat referencing those things that are modified from normal City standards, i.e. setbacks. There is currently a CIP project on schedule to upgrade Barron Road to an arterial pavement section. The Developer of Westfield Village is dedicating additional ROW for this project. Comprehensive Plan Considerations: Land Use Plan: The LUP depicts this property as single - family residential. Thoroughfare Plan: Barron Road is classified as a minor arterial. Parkland Dedication: The parkland dedication requirement for this property has been met by the developer with dedications in the Westfield Subdivision. Those areas shown on the plan as parks, trails, open space and greenways are planned to be owned and maintained by the Homeowners Association. The Greenways Program Manager responded by letter and her recommendations for protection of the greenway /natural area through fencing and signage were incorporated into the rezoning conditions. Open Space Dedication: Subsequent phases of Westfield Village will plat open space and walkways, as required by the rezoning. Budgetary & Financial Summary: It is expected that the Developer will request OP on the extension of the 18" waterline along Barron Road. Attachments: 1. Area map 2. Application 3. Copy of Plat MEMORANDUM March 13, 2002 TO: Planning and Zoning Commission FROM: Spencer Thompson Email: sthompson @ci.college - station.tx.us SUBJECT: WESTFIELD VILLAGE PH 1 FINAL PLAT Item: Discussion and possible action on a Final Plat for Westfield Village Phase 1, consisting of 84, single - family residential lots on approximately 17 acres. (02 -38) Applicant: Mr. Randy French for StyleCraft homes. Staff Recommendations: Staff recommends approval of the item. Item Summary: This item is for the consideration of a Final Plat for Westfield Village Phase 1. The proposed subdivision is located on Barron Road approximately 1/4 mile west of Alexandria Drive. The property was rezoned to a PD District in compliance with the Comprehensive Plan for the area in December 2001. The purpose of this design is to develop a neighborhood for entry-level family housing. When Council approved the rezoning they did so with two conditions. The first condition is that at the time of platting the proposed phasing meets access requirements such that areas with more than 50 lots provide 2 access points to the existing street system and that once there are more than 250 lots there is a third access point. It is anticipated that this phase will be able to meet the requirement because Alexandria subdivision is in the process of platting phase five on the eastern border of the subject property. Phase five of Alexandria includes a north -south roadway, Newport, which will provide secondary access to the subject tract. If for some reason Newport is not installed in a timely manner, the developer has a plan B, which is to provide temporary secondary access through one of the lots along Barron Road. The second condition is that prior to the beginning of site work, the recommendations of the Greenways Program Manager for protection of the open space are followed. This item will be addressed before a development permit is issued for the site. This final plat is among one of the first to come before the Commission for a property rezoned to PD under the revised PD District requirements. As such, through the rezoning, Council also approved a list of possible modifications from our standards that the applicant may request. Under the new PD District regulations, staff has the authority to work with the applicant to determine the limits of the proposed modifications. If staff and the applicant do not agree, then either party can request for WESTFIELD VILLAGE PH 1 (FP) (02- 00500038) ENGINEERING REVIEW COMMENTS No. 1 1. Sheet 1: You provide a detail on the construction exit but do not show on the plans where it is to be located. 2. Sheet 2: You provide a detail on the silt fence but do not show on the plans where it is to be installed. 3. Sheet 2: Fittings are not approved on storm sewers. Please see Section IV, 3, B. a. of the Design Manual. 4. Sheet 2: Please plot HGL for the 10 and 100 year storm events. 5. Sheet 2: When the topic of "curved sewers" was discussed, Ordinance Chapter 9, 8- P.1 was cited. It relates to sanitary sewer lines and PVC was the material discussed. Curved RCP was not discussed. If you wish to apply curvature to the storm line, submit manufacturers design standards for allowing curvatures on the particular material. 6. Sheet 2: Concerning the 6" PVC underdrain, the design Manual does not allow for 6" storm lines. The manual does allow 12" where applicable. 7. Sheet 3: Fittings are not approved on storm sewers. Please see Section IV, 3, B. a. of the Design Manual. 8. Sheet 3: Please plot HGL for the 10 and 100 year storm events. 9. Sheet 3: See note 3. 10. Sheet 4: See note 2. 11. Sheet 4: See note 3. 12. Sheet 4: Please provide PDE for outflow structure not in platted area. 13. Sheet 5: See note 2. 14. Sheet 5: Please provide PDE for portion of line not in platted area 15. Sheet 6: See note 1. 16. Sheet 6: See note 2. 17. Sheet 6: Please provide PDE for outflow structure not in platted area and not in future ROW. 18. Sheet 7: Please provide PUE for portion of line not in platted area. 19. Sheet 7: Has the portion of sanitary sewer shown to be under Newport Lane been "accepted" by the City? Was this line installed using structural fill? 20. Sheet 8: Is it the intent of the Developer to install landscaping and irrigation in the street islands? If so, please submit a PIP application. 21. Sheet 8: Do the street islands allow for fire truck turning radii? 22. Sheet 11: Please design water line in existing Barron Road ROW. It is known at this time that Barron Road will be upgraded to an arterial pavement section. Please show structural fill on this line. 23. Please show 6" blow -off in lieu of 2 ". 24. Sheet 12: Please provide an air vent at approximately Sta. 209.00. 25. Sheet 15: Please provide an air vent at approximately Sta. 252.34 26. Sheet 16. See note 2. R: I HTLTRIPZL TRI PRODIPZ20021 P0005962. DOC 27. Sheet 16: See note 15. 28. Sheet 16: See note 1. 29. Sheet S1: The Type "4" curb is not allowed. The Curb portion MUST be a continuous pour. 30. Sheet S2: Please include on Utility Crossing Detail "2 -ft minimum separation ". 31. Sheet S3: Please include note on hydrants as to the 6 "x6 "x4" block required on the valve box at surface. Of course, this only applies where the valve is not in a paved area. 32. Please submit a Development Permit Application. 33. Please ensure the pipe capacities for storm sewers are calculated properly. I will check them after the HGL has been plotted. Reviewed by: Spencer Thompson Date: March 14, 2002 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City of College Station will constitute a completely new review. R: IHTLTRIPZLTRIPRODIPZ20021P0005962. DOC