HomeMy WebLinkAbout000729972114 Southwood Drive
College Station, TX 77840
(979) 696-6444 Fax: (979) 846-9133
Ouim Williams Construction
March 5, 2002
City of College Station Pre-development Committee
Dear Sir or Madam:
Please find with this letter, a copy of the proposed plan for our ten-plex, a copy of the existing site
plan, a copy of the proposed site plan and a map showing the location of the property and its
proximity to the parking garage on College Main. Our proposal is to replace the existing duplex on
lot 14, block 4 of W.C. Boyett Estate Partition with the proposed ten-plex. Since there is enough
space for only five parking places on the property, we would like to use the parking garage at College
Main for any additional parking needed. Please call me at (979) 218-2880 if you have any questions
or if you need me to provide any additional information prior to our 4:00 PM meeting scheduled for
Wednesday, March 6a'.
Sincerely,
4 a,
Quinn Williams
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
UINN
F I LLIAM S
CONSTRUCTION
March 10,2002
To whom it may concern,
2114 Southwood Drive
College Station, TX 77840
Office: (979) 696-6444
Fax: (979) 846-9133
This letter is a request to go before the Projects Review Committee concerning a new ten-
plex project in the North Gate area. Bill Cooley, the property owner and I Quinn
Williams, the builder, are proposing to replace three existing duplexes on Tauber Street
with two ten-plexes and a twenty-space parking lot. We would like to divide the project
into two phases:
Phase I - Demolish and remove the existing structures on lots 12 and 13. Build one ten-
plex on lot 12 and a common driveway with ten parking spaces on lot 13.
Phase II - Demolish and remove the existing structure on lot 14. Build a second ten-plex
and add ten more parking spaces on lot 13.
The City of College Station currently requires 1.5 parking spaces per bedroom for an
apartment project. Due to the lot size and configuration, we are only able to
accommodate one parking space per bedroom. Since the project is in such close
proximity to the parking garage on College Main, we are requesting that the PRC accept
our project as planned, with only one parking space per bedroom.
We feel that this project is a much-needed restoration to the North Gate area. Not only
will the new buildings be much more aesthetically pleasing than the existing structures,
we will also be eliminating the current off-street parking and providing a screen for the
dumpsters not to mention new landscaping for the entire project.
Please find included with this packet, an existing site plan, a proposed Phase I and Phase
11 site plan, a map showing the proximity of the parking garage and some photographs of
the existing site.
I can be reached for any questions or more information if necessary at (979) 218-2880.
Thank you for the opportunity to make this request.
Sincerely,
Quinn Williams
Susan Hazlett - PDMT: 403-409 Tauber in NGate-replace existing, duplex with 10 unit apt bld: Quinn Williams: 218-2881Page 1 ]
From:
Tammy Macik
To:
Pre D Group
Date:
3/6/02
Time:
4:OOPM - 5:OOPM
Subject:
PDMT: 403-409 Tauber in NGate-replace existing duplex with 10 unit apt bld: Quinn
Williams: 218-2880
Place:
DSCR
Wrong Date
Thanks Steve Smith
Thanks,
Tammy Macik <><
Development Services - Secretary
-764-6254-
The better we know ourselves,
The less we'll criticize others.
Tammy Macik - PRC Meeting Minutes for Boyette Estate Partition Ten-Plexes Parking Page 1~
From: Tammy Macik
To: Carolyn Williams; Quinn Williams; Ronald Kaiser
Date: 03/28/2002 4:02:11 PM
Subject: PRC Meeting Minutes for Boyette Estate Partition Ten-Plexes Parking
Good Afternoon!
Attached are the minutes from the meeting held Wednesday, March 20 in regards to the Boyette Estate
Partition Ten-Plexes Parking. Please let me know if any changes need to be made.
Thanks,
Tammy Macik <><
Development Services - Secretary
-764-6254-
The better we know ourselves,
The less we'll criticize others.
CC: Connie Hooks; Jessica Jimmerson; Natalie Ruiz
FACSIMILE COVER SHEET
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979)764-3570 / Fax (979)764-3496
Date: March 15, 2002 # of pages including cover:3
Ifyou did not receive a complete fax, please call our office immediately for a new transmittal.
TO: Quinn Williams FAX: 846-9133
COMPANY: Quinn Williams Construction
RE: Parking Requirements on Tauber Street
FROM: Tammy Macik PHONE: (979)764-3570
COMPANY: City of College Station
REMARKS: ❑ Urgent ✓ For your review ❑ Replay ASAP ❑ FYI
Howdy!
Faxed to you is the agenda and staff report in regards to parking requirement for two
ten -plexes to go before PRC on Wednesday, March 20 @ I OAM
If you have any questions, please let us know.
Thanks,
Tammy Macik
Tammy Macik - PRC... Page 1
From:
Jennifer Flanery
To:
Tammy Macik
Date:
04/26/2002 1:36:09 PM
Subject:
PRC...
Quinn Williams 218-2880 needs to get on the next PRC for a site plan in N-3 district. The property is 409
Tauber and he is tearing down a duplex and putting up an 8-plex.
He needs to know when he would have to submit stuff and what he needs to submit for PRC.
Thanks Tammy!
Jen
Tammy Macik - Re: Fwd: PRC... Page 1
From:
Bridgette George
To:
Tammy Macik
Date:
04/29/2002 1:18:50 PM
Subject:
Re: Fwd: PRC...
It sounds like it needs to be a PRC. Can you please fax him an application and tell him we will schedule
a meeting once the application is processed. Tell him it takes about 3 weeks from the date of the
application, depending on whether we get a quorum. We will call him as soon as the meeting is
scheduled. Thanks!
Bridgette George
Asst. Development Manager
City of College Station
(979) 764-3570
www.ci.college-station.tx.us
Tammy Macik 04/29/02 11:13AM
should this be PRC or Pre-Development
Thanks,
Tammy Macik <><
Development Services - Secretary
-764-6254-
The better we know ourselves,
The less we'll criticize others.
CC: Jennifer Flanery; Natalie Ruiz
file://C:\WINDOWS\TEMP\GW } 00008.HTM07/ 17/2002
oc2 - q~
Quinn,
After discussing the project with our utilities operations division, I am prepared to offer to do a change order to get the
hydrant installed with the following terms.
1. CSU (the City) pays the cost of installing (relocating) a hydrant at Tauber and Cherry.
2. Developer pays for the line extension (250 ft of 6" water line).
3. CSU pays for all service reconnections from the existing 2" line to the new 6" line along the extension.
based on the changer order price TEXCON gave me the costs would break down as follows.
City Cost $3000
Your Cost $15,150
Let me know what you think. I can get the change order started as soon as we have an agreement. TEXCON says that
the hydrant can be ready for service within two weeks of notice to proceed with street repairs taking an additional
week.
Mark Smith
Director of Public Works
979-764-3690
Tammy Macik - Northgate Lofts Page
From:
Tammy Macik
To:
Joe Schultz; Quinn Williams
Date:
06/05/2002 8:41:55 AM
Subject:
Northgate Lofts
Good Morning!
Attached you will find the minutes from PRC Meeting held, Wednesday, May 29, 2002 in regards to the
Northgate Lofts. If you have any questions or concerns, please let us know.
Thanks,
Tammy Macik <><
Development Services - Secretary
-764-6254-
Never take on more work than you
have time to pray about.
Jennifer Reeves - Re: Tauber Street Page 1
From: Donald Harmon
To: Jennifer Reeves
Date: 5/14/02 1:19PM
Subject: Re: Tauber Street
I am not aware of any capital projects in the near future. However, all the capital projects in NorthGate
have included 6' sidewalks at the back of curb. They are needed in that area and I believe are included in
the NorthGate Plan.
Thanks,
Donald
Jennifer Reeves 05/14/02 11:48AM
Do you know if it is in the City's plans to widen or rehab Tauber street between Cross and Cherry in the
next five years or so? Im working on a development review right now and Im debating whether or not to
require sidewalks. If you could let me know I sure would appreciate it.
ext. 6361
Thanks
Jennifer
CC: Bob Mosley
DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Name/Firm: Jpr Te Y cor,
Address: 6~ •
Date: 5- / , e ?
Phone: p0 - 7 1
Fax: 00- 9 7 f 7
We are transmitting the following for Development Services to review and comment: (Check all that apply.):
❑ Master Development Plan w/ ❑ Redlines LE(Development Permit App.
❑ Preliminary Plat w/ ❑ Redlines ❑ Conditional Use Permit
❑ Final Plat w/ ❑ Redlines ❑ Rezoning Application
❑ FEMA CLOMA/CLOMR/LOMA/LOMR w/ ❑ Redlines ❑ Variance Request
Site Plan w/ ❑ Redlines ❑ Other - Please specify
LJ Grading Plan w/ ❑ Redlines
f:1 Landscape pe Plan w/ ❑ Redlines
❑ Irrigation Plan w/ ❑ Redlines
❑ Building Construction Documents w/ ❑ Redlines
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
❑
Waterline Construction Documents
w/ ❑
Redlines
❑
Sewerline Construction Documents
w/❑
Redlines
❑
Drainage Construction Documents
w/ ❑
Redlines
❑
Street Construction Documents
w/ ❑
Redlines
❑
Easement application with metes & bounds description
❑
Drainage Letter or Report w/ ❑
Redlin
es
❑
Fire Flow Analysis
w/ ❑
Redlines
Special Instructions:
11 t~
❑ TxDOT Driveway Permit
❑ TxDOT Utility Permit
❑ Other - Please specify
,s 7-Le S•'~-c
n 1 a •n In os +414 A rib -Q ci n a ►-+.e O -S l c~ b v Si-,, ~n
J ~
~c-~-s w:l( be Cl kS"j w;tk +1 , r~~~J~oha -f r,CVaw ea..~-s
TRANSMITTAL LETTER I ON
TRANSMIT.DOC 113102
Page 1 of 1
Howdy!
Attached you will find the staff report and agenda for the PRC meeting to be held Wednesday, May 29 in regards to Northgate
Lofts. If you have any questions or concerns, please give us a call.
Thanks
Thanks,
Tammy Macik <><
Development Services - Secretary
-764-6254-
Never take on more work than you
have time to pray about.
1~
Jennifer Reeves - Re: Wolf Pen Creek Trail System Page 1
From: Bob Mosley
To: Donald Harmon; Jennifer Reeves
Date: 5/15/02 3:48PM
Subject: Re: Wolf Pen Creek Trail System
The trail system from Dartmouth to George Bush East is currently in design, however, the conceptual plan
for the upper trails did not include a connection to Texas Avenue.
Donald Harmon 05/15/02 01:25PM
Hi Jennifer,
Laura Harris is the project manager for the Wolf Pen Creek upper and lower trails. She is on vacation this
week and will be returning on Monday. If you need information sooner, I would contact Bob Mosley.
Thanks,
Donald
Jennifer Reeves 05/15/02 11:06AM
Natalie said that you would know or know who to pass me on to about the design and or time line on the
trail system from Taco Bell to Texas Ave.
Thanks
Jennifer
CC: Laura Harris
Jennifer Reeves - Re: Northgate Lofts Page 1
From: Jennifer Reeves
To: John Logan
Subject: Re: Northgate Lofts
Sounds good, thanks for your help John.
John Logan 10/11/02 03:34PM
Jennifer, I talked to Quinn 2 minutes after you drove off. I told him the berm had to move and we could
work around the mailbox post. If we need to we can maybe fudge a little on alignment towards the street
but let's keep that as last resort.
e
7 M
r
r
a
N ~
N P
Ili N W
Ps•~
c ~wp H
N ~ tD to ~p
A Oo C
~.~0
~-~Mn
04 oo
oTVaf,
o a
00
N -a (t a
rL
ID
D
N
~zo~w
a
z E71
DCNw
3r a
N
as s (A -C
23 Tpq
z 4)
oa~o,
h
C
Q
j.
C
N
~D
N
c~
a
O S
~o
o a.
CL
a
TNz
(D
a
~ o
0
(1
unn s
b-~
it^
6
Ni
O
O 'a
s~ 3
k
'O