Loading...
HomeMy WebLinkAbout00072954Bridgette George - Re: Cheddar's drainage easement Page 1 Uc -30 From: Mark Smith To: Bridgette George Date: 6/4/01 2:44PM Subject: Re: Cheddar's drainage easement Right off hand, I have to say that we do not want it. I don't know anything about the storm drain. Was it designed & constructed to "city standards"? What condition is it currently in? What purpose does it serve? Does MDG say why they (or their client) want it to be public? Bridgette George 06/04/01 11:36AM I just faxed you a copy of the Gateway Ph. 1 plat that shows this drainage easement. MDG submitted information for preparing this easement by separate instrument. I called and told him we do not process private easements. He said they're wanting to dedicate it as a public easement. It currently has a storm sewer in it. Do we want this easement? Jeff Tondre worked on this and the only comments in the file are to note the drainage easement as private, not public. Thank you! Bridgette George :o) Asst. Development Review Manager City of College Station (979) 764-3570 (979) 764-3496 {Fax} www.ci.colle4e-station.tx.us March 27, 2000 g~c c pL = a 5 L - ~ y~rnrn O~ U=9gc C C6 4, Ch L C ccn~ c f0crn C ~c LLI c c>4,g W O'nc76a ii • W a M_ Cn 02 C V c m M ~a C r1 6 Z woo a U)^ 0 ai X 0 0 0 'ZS C~O 0 N O W d7 ^ N 4) Ch CA K 2 Ln V 1 Natalie Ruiz COCS Development Services 1101 Texas Ave. P.O. Box 9960 College Station, TX 77840 Dear Natalie: 7r Attached you will find ten (10) sets of the site construction plans for Cheddars andlAwIr jcopies of the drainage report to be stamped "Approved." I have also included the original redlines of Cheddars for your records. If you have any questions or need anything further, please do not hesitate to call. r~ i erely, Sinio Veronica Morgan Li ~J Attachments Cc: file Bridgette George COCS Development Services 1101 Texas Ave. College Station, TX 77840 rnrn y o o L !a A a. > O ~3in~ '5 ~MCan ~ U :r ~ C6 Cp Cn -us c ~ ~ ozS C ca me w ~ a •c W 06 a: W ~ W a s 00- s c riyy ~ n 0 as J N ~ Z ~ Q O^ 0 OOAn .j W N O W ; N U C O at a+ M ~ ~ n v V LU is : Cheddars Bridgette, March 31, 2000 please find the following for inclusion with the Cheddars building plans. • 3 copies of the Site Plan • 3 copies of the Grading Plan • 3 copies of the Irrigation Plan L.1 requested that we give him the grading plans as will the other sheets you uested. Also included is an additional Site Plan Sheet for you to send to GTE. ase call us if you have any questions. eronica J.B. Mo: fanaginiz Partner . file NEW DEVELOPMENT IN COLLEGE STATION Week of 2/7/00 Standard Automatic Fire Enterprises, Inc.: a site plan for the expansion of an existing warehouse and office building located at 500 Graham Road. (00-28) developer responsible for installing 1-4'' grey schedule 40 conduit from riser pole to meter, neveloper provides 3O ' of rigid pipe for riser, Cite will remove existing security{ light and overhead service to them at ' t "No Cost" to the developer, neveloper needs to contact the Flectric9l t7ivi5ion ahead of time to for removal of lines and light, ' Cheddar's Casual Cafe:' a site plan for a new restaurant located at the NW corner of University Drive East and the Bypass (The Gateway Center). (00- 30) neveloper responsible for installinq 2-4'' grey schedule 40,conduit from existing stub outs to proposed transformer, neveloper responsible for installinq 2-4" grew schedule 40 conduit out of transformer to proposed junction box. neveloper needs to stub out of junction into adjoinq property's ( lot 2-John Wonq & lot 5- nelmar l aronhead) 2-4" grey schedule 40 conduit, neveloper responsible for installinq all conduit per city spec and Jesign, neveloper responsible for providinq easements to cover electrical lines and equipment, West Corner of Holleman Harvey Mitchell. a conceptual site plan for a rezoning from R-1 to PDD-B on 7.16 acres. (00-31) Note; there is a 3/ phase overhead feeder line proposed in the front of this property going down Harvey Mitchell parkway, neveloper responsible for providinq rigid pipe for riser, neveloper responsible for installinq 2-4" conduit per city spec and Jesign to proposed transformer, neveloper responsible for stubbing out of transformer w/ 2-4" grey schedule 40 conduit to adjoining property. beveloner responsible for rrovidino easements to cover electrical lines and equipment, Mitchell & Morgan, LLP Response to STAFF REVIEW COMMENTS No. 1 Project: Cheddar's Casual Cafe (site plan) #00-03 5Z g~c ono .a !o ~a > O= a~ U) c~LO LM o~ x V ~ c C~2 at _C6 12 vrn~ Cc'a w'cn 'C C.2: M W U~oZSa ui a to a M c Ch oa r W Cd ga M2 ri ~ C n O ~u CL V _J 0 N dam' Z I~ U) O ai X C ~S Ln OM ~ O J _ Hf dW N 10 O W O to CIO Ch I ~ m o► W4 x O ~ V ! Ln U 1. On the Master and Preliminary plats the 20-feet PUE on the north side of the property is shown to be 10 feet. Plat is incorrect. It should have been a 20 foot PUE. ✓2. Provide a LEGEND on the site plan. Done. /3. Topography/spot elevations - will a separate sheet be provided for drainage? Yes. See Grading Plan that was previously submitted. 4. Provide 180 sq.ft. of landscaping for every 15 interior parking spaces. Also, end islands are required to be 180 sq.ft. We have 64 interior spaces, which requires 768 square feet of landscaping. Counting the area around the building that will be landspaped,_and not that provided n end islands, the site has roughly 4500 square feet of landscaped-area provided interior to the site. f5. The required minimum drive aisle width is 23 feet with head-in parking. Corrected. b. Is the throat width for the driveway on the northwest corner of the site a minimum of 24 feet? Also, if the parking space #101 could be removed it would allow for a longer throat length before the first point of contact is made. We would like to keep the parking space. The traffic volume on the interior alley should be minimal and conflicts very minor. `7. Provide a detail for the retaining wall with materials that are to be used. No retaining wall will be used per PRC review and motion, 212312000. 8. Is the proposed 20 feet PUE to the building by separate instrument? If yes, provide the volume and page numbers. No, it is dedicated on the replat for Lot 4 and Lot 2 of Gateway Subdivision. 9. Provide the location of the electrical transformer. Done. 10. Provide designations for the domestic/irrigation water meters. Done. J1. Provide proposed grading and drainage information. Provided with original submittal package. t 12. Is the fire hydrant located on the southwest corner of the site proposed or existing? Relocate the fire hydrant; its location on the site plan shows it is within the proposed sidewalk area. It is not necessary to sign/stripe the north end of the large parking lot area as a fire lane? Fire hydrant has now been field verified and is shown in the proper location. Sidewalk conflict has been resolved. Striping of fire lane on the north end of the parking lot has been removed. -/13. Provide a curb and pavement detail as per the Zoning Ordinance, Section 9. Done. X74. Screening is required for the electrical transformer. Done - see Landscape Plan. 15. The points accrued for the non-canopy trees are 40 points each. Corrected. 16. Recalculate the proposed shrub points. Vegetation used for screening purposes in the 20 feet Overlay District shall not accrue points towards the landscape requirement. Corrected. X17. All existing trees to remain shall be barricaded even though you are not counting them towards the landscape requirement. Shown on the landscape plans and a note provided on the site plan. fF`18. Provide water and sewer demands. Done. -"19. Submit a permit for any utilities placed within the TxDOT rights-of-way. No permits necessary. 20. Why is the pavement extended to the end of the access easement located on the northwest corner of the site? This could create future problems. Pavement was extended as part of Gateway Subdivision, not Cheddars. It was extended to the end of access easement as shown on the plat of the Gateway Subdivision. 21. The landscape plan shows a live oak tree in very close proximity to where you indicated the pylon sign will be located. Live oak tree will be relocated. It is not necessary to meet point requirements. We would like to relocate once pylon sign is set. .22. The sign is permitted separately. Acknowledged. Sign corrections per PRC/staff comments will be submitted for permitting. Q ~A7 tom" 141 ✓ t ;Z",?- 51,fc mss, s z (~v~t. flu ~•~f `~~.z-C Z / •L ~-G' ! [ % ~ 1 l'~{ iV `C{tl9Lr ✓ l~ % trl~!/c ~ ~4ti 1- 17 4 0, i~C?~16 Z~ J~ ~lJ ~T Q ~7` c~1,~,u u lfJ~1/~r ?~7, t 15 /B✓'t°iu tr/4rY c ~r~~'L~~t REV` t1~P~(Y~ c'( a-s4t ALI OIV-S clv~ 4-~C~ ~ ~~Avy°1 a-wy A P014 . 14A44