HomeMy WebLinkAbout00072945CITY OF COLLEGE STATION
CUSTOMER RECEIPT
OPER: MRODGERS CT DRAWER: 1
DATE: 2/07/00 00 RECEIPT: 0120297
DESCRIPTION QTY AMOUNT TP TM
2000 28 1 $100.00 *PL CK
PLANNING & ZONIN CK: 1150
2000 500009 1 $400.00 *PL CK
PLANNING & ZONIN CK: 1150
TENDER DETAIL
CK 1150 5500.00
DATE: 2/07/00 TIME: 9:43:33
TOTAL PERSONAL CHECK $500.00
AMOUNT TENDERED $500.00
THANK YOU
Steven Runs SAFE,
R.dL.E. lic. =0280 SCR-0322
STANDARD AUTOMATIC
FIRE ENTERPRISES, INC.
Fire Sprinkler Svstems Specialists
PHONE (409) 690-0301 P. 0, BOX I (iO 8
FAX (409) 690-6 7-4 1 COLLEGE ST.1 770[A;
TY 77842-0-108
ATTACH TENT
RichDale Properties (Steven Rians & Jeffery Sosebee/690-0301)
Check No: 1150
Dated: February 4, 2000
Payee: The City of College Station
Purpose: Costs associated with improvements to 500 Graham Road, College Station, TX
Amount: $500.00 ($100 Site Plan; $100 Development Permit; $300 Water Tap Fees)
NEW DEVELOPMENT IN COLLEGE STATION
Week of 2/7/00
Standard Automatic Fire Enterprises, Inc.: a site plan for the expansion of an
existing warehouse and office building located at 500 Graham Road. (00-28)
Developer responsible for installinq 1-4" greq schedule 40 conduit from
riser pole to meter, neveloper provides 30 ' of rigiJ pipe for riser,
Citu will remove existing securitu light and overhead service to them at
"No Cost" to the developer, neveloper needs to contact the electrical
Division ahead of time to for removal of lines and light,
Cheddar's Casual Cafe: a site plan for a new restaurant located at the NW
corner of University Drive East and the Bypass (The Gateway Center). (00-
30)
Developer responsible for installinq 2-4" greq schedule 40 conduit from existing stub
outs to proposed transformer, Developer responsible for installinq 2-4" grew
schedule 90 conduit out of transformer to proposed junction box, Developer needs to
stub out of junction into adjoinq propertu's ( lot 2-John Woncq & lot 5- Delmar
Paronhead) 2-4" grew schedule 90 conduit,
Developer responsible for installinq all conduit per citU spec and Jesign,
Developer responsible for providinq easements to cover electrical lines and equipment,
West Corner of Holleman Harvey Mitchell. a conceptual site plan for a
rezoning from R-1 to PDD-B on 7.16 acres. (00-31)
Note: there is a 3/ phase overhead feeder line proposed in the front of this propertq
goinq down Harveu Mitchell parkwau,
Developer responsible for providinq rigid pipe for riser,
Developer responsible for installinq 2-4" conduit per cite spec and design to
proposed transformer, Developer responsible for stubbinq out of transformer w/ 2-4"
greq schedule 40 conduit to adjoining propertu,
Developer responsible for nrovidina easements to cover electrical lines and equipment,