Loading...
HomeMy WebLinkAbout00072945CITY OF COLLEGE STATION CUSTOMER RECEIPT OPER: MRODGERS CT DRAWER: 1 DATE: 2/07/00 00 RECEIPT: 0120297 DESCRIPTION QTY AMOUNT TP TM 2000 28 1 $100.00 *PL CK PLANNING & ZONIN CK: 1150 2000 500009 1 $400.00 *PL CK PLANNING & ZONIN CK: 1150 TENDER DETAIL CK 1150 5500.00 DATE: 2/07/00 TIME: 9:43:33 TOTAL PERSONAL CHECK $500.00 AMOUNT TENDERED $500.00 THANK YOU Steven Runs SAFE, R.dL.E. lic. =0280 SCR-0322 STANDARD AUTOMATIC FIRE ENTERPRISES, INC. Fire Sprinkler Svstems Specialists PHONE (409) 690-0301 P. 0, BOX I (iO 8 FAX (409) 690-6 7-4 1 COLLEGE ST.1 770[A; TY 77842-0-108 ATTACH TENT RichDale Properties (Steven Rians & Jeffery Sosebee/690-0301) Check No: 1150 Dated: February 4, 2000 Payee: The City of College Station Purpose: Costs associated with improvements to 500 Graham Road, College Station, TX Amount: $500.00 ($100 Site Plan; $100 Development Permit; $300 Water Tap Fees) NEW DEVELOPMENT IN COLLEGE STATION Week of 2/7/00 Standard Automatic Fire Enterprises, Inc.: a site plan for the expansion of an existing warehouse and office building located at 500 Graham Road. (00-28) Developer responsible for installinq 1-4" greq schedule 40 conduit from riser pole to meter, neveloper provides 30 ' of rigiJ pipe for riser, Citu will remove existing securitu light and overhead service to them at "No Cost" to the developer, neveloper needs to contact the electrical Division ahead of time to for removal of lines and light, Cheddar's Casual Cafe: a site plan for a new restaurant located at the NW corner of University Drive East and the Bypass (The Gateway Center). (00- 30) Developer responsible for installinq 2-4" greq schedule 40 conduit from existing stub outs to proposed transformer, Developer responsible for installinq 2-4" grew schedule 90 conduit out of transformer to proposed junction box, Developer needs to stub out of junction into adjoinq propertu's ( lot 2-John Woncq & lot 5- Delmar Paronhead) 2-4" grew schedule 90 conduit, Developer responsible for installinq all conduit per citU spec and Jesign, Developer responsible for providinq easements to cover electrical lines and equipment, West Corner of Holleman Harvey Mitchell. a conceptual site plan for a rezoning from R-1 to PDD-B on 7.16 acres. (00-31) Note: there is a 3/ phase overhead feeder line proposed in the front of this propertq goinq down Harveu Mitchell parkwau, Developer responsible for providinq rigid pipe for riser, Developer responsible for installinq 2-4" conduit per cite spec and design to proposed transformer, Developer responsible for stubbinq out of transformer w/ 2-4" greq schedule 40 conduit to adjoining propertu, Developer responsible for nrovidina easements to cover electrical lines and equipment,