Loading...
HomeMy WebLinkAbout00072935/I a MEMORANDUM January 27, 2000 TO: Jim Holster, Via fax (409) 693-8370 FROM: Bridgette George, Asst. Development Coordinator SUBJECT: West District Maintenance Shop - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Two (2) revised site and landscaping plans; The attached redlined site and landscaping plans with staff comments. The drainage report for this project has been reviewed and approved by our Engineering Staff. Attached is your approved copy. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments Approved Drainage Report Redlined site and landscaping plans (please pick up at Development Services) cc: Ric Ploeger, Via fax (409) 764-3737 Case file #97-807 STAFF REVIEW COMMENTS No. 1 Project: West District Maintenance Shop 1. Is there an existing sidewalk along the frontage? Holleman is on the sidewalk master plan. 2. Show which portion of the building will be used as office space and which for repair shop. Will there be bays? Please show where and the dimensions. 3. Show paving detail. 4. Show curbing detail. 5. Label fire hydrant. If existing drive is a firelane and built to firelane standards, label as such. 6. Parking spaces need to be drawn in and dimensioned. Show required handicap information - # spaces required, proper dimensions, required labeling. 7. Show table calculating the number of parking spaces required by use. 8. Dimension circulation aisle near dumpster area. 9. An end island is required at end of parking row opposite dumpster. 10. Title block shows that the site plan is page 1 of 3. What are on the other 2 pages? 11. Clearly show the boundaries of the site area on the site plan as well as the landscaping plan. 12. Show utility service lines to the building. Will there be any new meters? New transformer pad? 13. Do any utility or other easements cross the site? Show them. 14. Please explain the use of the wheelstops behind the building. 15. How will the transitions in elevation and grading work between the sidewalk to the dumpster & the parking paving & the curb & the access to the dirt storage area? 16. Landscaping plan is fine, but the landscaping calculations need to be corrected as shown. 17. Show proposed grading. Reviewed by: Jessica Jimmerson Date: 1/25/00 Staff Review Comments Page 1 of 1 STAFF REVIEW COMMENTS No. 1 Project: West District Maintenance Shop is there an existing sidewalk along the frontage? Holleman is on the sidewalk master plan. t,414_ 61-- -21(A-~ 2. Show which portion of the building will be used as office space and which for repair shop. Will there be bays? Please show where and the dim ns ons..~., 3. Show paving detail. 4. Show'c ru bing detail. t/5. Label fire hydrant. If existing drive is a firelane and built to firelane VV standards, label as such. 6. Parking spaces need to be drawn in and dimensioned. Show required handicap information - # spaces required proper dimensions, required labeling. - wcAQ- N► .•-~.c- cs,iLa cu-CWM4e~- Ka4,c 7. Show table calculating the number of parking spaces required by use. q 8. Dimension circulationgi lle near d stgr aareea&-A. 9. An end island is required at end of parking row opposite dumpster.- - C4 ,,~Title block shows that the site plan is page 1 of 3. What are on the other 2 pages? 11. Clearly show the boundaries of the site area on the site plan as well as the landscaping plan. 1)2Show utility service lira to the building~Will there be any new meters? New transformer pad? ~n ~s wc-ti- rr-eAWL-0 t.'s 1L&Ad' 13. o any utility or other easements cross the site? Show them. Please explain the use of the wheelstops behind the building. 15. How will the transitions in elevation and grading work between the sidewalk to the dumpster & the parking paving & the curb & the access to the dirt storage area? 16. Landscaping plan is fine, but the landscaping calculations need to be corrected as shown. 17. Show proposed grading. Reviewed by Staff Review Comments Page 1 of 1 Jessica Jimmerson Date: 1/25/00 STAFF REVIEW COMMENTS No. 2 Project: WEST DISTRICT MAINTENANCE SHOP (SP) (0-24) 1. OK 2. Show which portion of the building will be used as office space and which for repair shop. Will there be bays? Please show where and the dimensions. On Site Plan, draw in building what is office vs. service area and provide square footage for each. Use these square footages to calculate parking. 3. Show paving detail. 4. Show correct curbing detail. (dimension from top of curb to base of pavement) 5. OK 6. Parking spaces need to be drawn in and dimensioned. Show required handicap information - # spaces required, proper dimensions, required labeling. If this area is now going to be used for storage, it is required to be fully screened (privacy fencing not chain link). The handicap space will require a full end island on the southern side. 7. Show table calculating the number of parking spaces required by use. Show how the number of parking spaces required was calculated. 8. OK 9. OK 10. OK 11. OK 12. Will there be any new meters? 13. Do any utility or other easements cross the site? Show them. Please provide answer - memo, or note on coversheet is fine. 14. OK 15. How will the transitions in elevation and grading work between the sidewalk to the dumpster & the parking paving & the curb & the access to the dirt storage area? There may be a transition problem here because the new sidewalk appears to be at pavement level and the area it is traversing through is at top of curb level. 16. OK Reviewed by: JESSICA JIMMERSON Date: 23-Mar-00 J:\PZTEXT\PZ02861.DOC Page 1 of 1