HomeMy WebLinkAbout00072864MEMORANDUM
May 30, 2002
TO: Planning and Zoning Commission
FROM: Spencer Thompson
Email: sthompson @ci.college - station.tx.us
SUBJECT: FINAL PLAT for WESTFIELD ADDITION PH 2A (FP)
Item: Discussion and possible action on a FINAL PLAT for WESTFIELD ADDITION
PH 2A (FP), consisting of 49 lots on 9.7 acres (02- 00500091)
Applicant: MAIN STREET HOMES
Staff Recommendations: Staff recommends approval of the plat as submitted.
Item Summary: This item is for the consideration of a Final Plat for Westfield Phase
2A. The property is located on Graham Road, east of Victoria Avenue and currently
zoned R -1. The Final Plat conforms to the approved Preliminary Plat except for the fact
that the Developer requested to phase the development. There is now a Phase 2A and
Phase 2B. Phase 2B will consist of 11 lots on Meadow View Drive. Westfield Phase
2A will have access to Graham Road through Phase 1 to the east and to Victoria
Avenue through Phase 3 to the west. Harvest Drive will be constructed as a collector.
Comprehensive Plan Considerations:
Land Use Plan: Depicted as single - family residential.
Thoroughfare Plan: Graham is a major collector.
Parkland Dedication: Parkland was dedicated with Phase 1.
Open Space Dedication: Greenway along Lick Creek dedicated with Phase 3.
Special Area Plans: N/A
Budgetary & Financial Summary: N/A
Attachments:
1. Area map
2. Application
3. Copy of Plat
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979)764 -3570 / Fax (979)764 -3496
FROM: Susan Hazlett, Staff Assistant
DATE: June 4, 2002
RE: StaffReport/Project Presentation
P &Z Meeting, June 6, 2002
Following this coversheet is a copy of the Staff Report that was prepared for the following
project. Please keep in mind that staffs responsibility is to provide the Planning & Zoning
Commission with all pertinent facts of a development case, but that staff is not acting as an
advocate for the applicants. Therefore, it is in the applicant's best interest to send a
representative to the Planning & Zoning Commission meeting to speak on behalf of the
proposal.
This item is scheduled for the Thursday, June 6, 2002 Planning & Zoning Commission
Meeting. This meeting will begin at 7:00 P.M. in City Hall Council Chambers. I have
included a copy of the agenda for this meeting. Please contact our office at (979)764-
3 570 if you should have any questions. Thanks.
MEMORANDUM
May 30, 2002
TO: Planning and Zoning Commission
FROM: Spencer Thompson
Email: sthompson @ci.college - station.tx.us
SUBJECT: FINAL PLAT for WESTFIELD ADDITION PH 2A (FP)
Item: Discussion and possible action on a FINAL PLAT for WESTFIELD ADDITION
PH 2A (FP), consisting of 49 lots on 9.7 acres (02- 00500091)
Applicant: MAIN STREET HOMES
Staff Recommendations: Staff recommends approval of the plat as submitted.
Item Summary: This item is for the consideration of a Final Plat for Westfield Phase
2A. The property is located on Graham Road, east of Victoria Avenue and currently
zoned R -1. The Final Plat conforms to the approved Preliminary Plat except for the fact
that the Developer requested to phase the development. There is now a Phase 2A and
Phase 2B. Phase 2B will consist of 11 lots on Meadow View Drive. Westfield Phase
2A will have access to Graham Road through Phase 1 to the east and to Victoria
Avenue through Phase 3 to the west. Harvest Drive will be constructed as a collector.
Comprehensive Plan Considerations:
Land Use Plan: Depicted as single - family residential.
Thoroughfare Plan: Graham is a major collector.
Parkland Dedication: Parkland was dedicated with Phase 1.
Open Space Dedication: Greenway along Lick Creek dedicated with Phase 3.
Special Area Plans: N/A
Budgetary & Financial Summary: N/A
Attachments:
1. Area map
2. Application
3. Copy of Plat
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979)764 -3570 / Fax (979)764 -3496
TO: �'Ie s u� � / 7 8'Jf 2(7
FROM: Susan Hazlett, Staff Assistant
DATE: June 4, 2002
RE: StaffReport/Project Presentation
P &Z Meeting, June 6, 2002
Following this coversheet is a copy of the Staff Report that was prepared for the following
project. Please keep in mind that staffs responsibility is to provide the Planning & Zoning
Commission with all pertinent facts of a development case, but that staff is not acting as an
advocate for the applicants. Therefore, it is in the applicant's best interest to send a
representative to the Planning & Zoning Commission meeting to speak on behalf of the
proposal.
This item is scheduled for the Thursday, June 6, 2002 Planning & Zoning Commission
Meeting. This meeting will begin at 7:00 P.M. in City Hall Council Chambers. I have
included a copy of the agenda for this meeting. Please contact our office at (979)764-
3570 if you should have any questions. Thanks.
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764 -3570 / Fax (979) 764 -3496
MEMORANDUM
May 21, 2002
TO: Rick Jenkins, Main Street Homes, CS, Ltd., Via fax 512 - 478 -5678
FROM: Bridgette George, Assistant Development Manager
SUBJECT: WESTFIELD ADDITION PH 2A (FP) -Final Plat
Staff reviewed the above - mentioned final plat as requested. The following page is a list of
staff review comments detailing items that need to be addressed. Please address the
comments and submit the following information by Friday, May 24, 10:00 a.m. to be placed
on the next available Planning and Zoning Commission meeting scheduled for June 6,
2002, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue.
Ten (10) copies of the revised final plat; and,
One (1) Mylar original of the revised final plat with the appropriate signatures.
One (1) copy of the digital file of the final plat on diskette or e-mail to
nmanhart @ci.college - station.tx.us
If you have any questions or need additional information, please call me at 764 -3570.
Attachments: Staff review comments
cc: R. Conlin, CSC Engineering & Environmental Consultants, Via fax 778 -0820
Case file #02- 00500091
Home of Texas A &M University
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764 -3570 / Fax (979) 764 -3496
MEMORANDUM
May 21, 2002
TO: Main Street Homes, CS, Ltd., Via fax 512 - 478 -5678
FROM: Bridgette George, Assistant Development Manager
SUBJECT: WESTFIELD ADDITION PH 2A (FP) - Final Plat
Staff reviewed the above - mentioned final plat as requested. The following page is a list
of staff review comments detailing items that need to be addressed. Please address
the comments and submit the following information by Friday, May 24, 10:00 a.m. to be
placed on the next available Planning and Zoning Commission meeting scheduled for
June 6, 2002, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue.
Ten (10) copies of the revised final plat; and,
One (1) Mylar original of the revised final plat with the appropriate
signatures.
One (1) copy of the digital file of the final plat on diskette or e-mail to
nmanhart@ci.college- station.tx.us
If you have any questions or need additional information, please call me at 764 -3570.
Attachments: Staff review comments
cc: R. Conlin, CSC Engineering & Environmental Consultants, Via fax 778 -0820
Case file #02- 00500091
Home of Texas A &M University
STAFF REVIEW COMMENTS NO. 1
Project: WESTFIELD ADDITION PH 2A (FP) -FINAL PLAT (02- 00500091)
ENGINEERING
1. Please unbold the line between the North part and the South Part. This line weight
should be for the subdivision boundary, only.
2. According to Utilities, there should be a 10' PUE on Lot 8 Block 4 along the 80.31' lot
line.
3. Please show the item between lots 11 and 12 as a PUE and provide volume and page.
4. Please label 100 -yr floodplain (per City Ordinance, not FEMA).
5. Please change signature line beneath City Engineer certificate to City Engineer.
6. Please call -out minimum slab elevation per drainage study for Lots 8 and 13.
7. Comments to construction documents will be returned separately.
Reviewed by:
Spencer Thompson
Date: May 21, 2002
ELECTRICAL
1. Developer installs conduit as per city specs and design.
2. Developer installs street lighting as per city specs and design.
3. Developer provides temporary blanket easement for construction
purposes (see attached Dedication Sheet).
4. Developer provides digital of plat and/or site plan for AutoCAD 14. Email
to rbolin O-ci .college- station.tx.us
5. Developer provides easements for electric infrastructure as installed
(including street lighting).
6. Upon completion of project surveyed sealed meets and bounds
descriptive easements are necessary to release temporary blanket
easement.
Reviewed by: Ronnie Bolin
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next
transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the
City, will constitute a completely new review.
Page 2 of 2