Staff reviewed the above - mentioned site plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. Please address
the comments and submit the following information for further staff review and approval:
Seven (7) complete sets of construction documents;
Two (2) revised site and landscaping plans; and,
Easement Dedication Sheet and required documents.
Please note that the Easement Dedication Sheet and the necessary documents are
required prior to the issuance of a building permit. If there are comments that you are
not addressing with the revised site plan, please attach a letter explaining the details. If
you have any questions or need additional information, please call me at 764 -3570.
Attachments: Staff review comments
Easement Dedication Sheet
cc: David Nobles, Shammy Car Wash, Via fax 846 -7151
Case file #02- 00500089
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 1 of 3
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764 -3570 / Fax (979) 764 -3496
®u [� 7M ` I Bill �
May 28, 2002
TO: Vincent Jarrard, Eurythmic Design Group Architects, 214.349.4419
FROM: Bridgette George, Assistant Development Manager
SUBJECT: SHAMMY EXPRESS CAR WASH (SP) - Site Plan
Staff reviewed the above - mentioned site plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. Please address the
comments and submit the following information for further staff review and approval of
the plans:
Eight (8) revised site plans.
If there are comments that you are not addressing with the revised site plan, please
attach a letter explaining the details. If you have any questions or need additional
information, please call me at 764 -3570.
Attachments: Staff review comments
cc: David Nobles, Shammy Car Wash, Via fax 846 -7151
Case file #02- 00500089
Home of Texas A &M University
Pace _ C..^
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
101 Texas Avenue South, Pt:) Box 9960
College Statior. - Texas 77842
Phone (979) 764 -3573 ! Fax (979) 764.3496
MEMORANDUM
ftfia 0, 200 "'
TO Vineeri: Jarraia, Earyttlmi:� Design Grcu;i,�rcliltects, 214 -349 -4415
F ROW Bridgette George, assistant Development Manager
SUSJEC.T SHAMMY EXPRESS CAR WASH (SP) - Site Plain
:3taff re" revved the above- mentioned site pain as requested. The following page is list o'
„G t eviev_ corn meets retailing items that teed to be addressed. Fiease address t")e
art ubm,t the foliofring irlfarmaticn for further K,taff revie� and aprr.')val
complete sets construction dccumen"s
,,, �2) rev;sed site and landscaping glans; and,
V Easement Ded "cation Sheet and required flocs invents.
?lease go o i, , the Easement Cedisation Sheet ana the necessary r +.ice L,rnen1 ?s are
regUir "e;' prior to rn= issuance of a building perrnit- if thP. are c omrneripS thi' , /CIL' aie ne
addressing with Me revised site plan, please atta a se=tter explainir g the de'a if ;:r• "4
na - ve any �uevioris or need ad ditional ir?forr;iat pierase call me, at 764 - 357 0
Attachments Staff review comments
Easement Dedication Sheet
A Ncbles, Snammy Car Wash, Via fax S43 - 7151
ase file X02 - 00500089
N01 E �e es r e:t:',o t`,e plans the,i ha rol t e- tea,,: +, ; u !_. ' it} Ot C a e • 1a'. VI 111-St Lne e. ;air.rc m rc;w ect
;ei;e; an , t,:,uoled' or ycu ; x)t; Ac y d ".obi;nai those cu° thai i Nve no? .eeni r.. nted . -u• ?, t
. rf . ,o:,i tu,e a ca•n�.dete'y r,atia cvwn
STAFF REVIEW COMMENTS NO. 1
Project: SHAMMY EXPRESS CAR WASH (SP) -SITE PLAN (02- 00500089)
PLANNING
1. Please note on the site plan the total site area and legal description
2. Please note on the site plan whether the subject property is in the 100 -year flood
plain referencing the FEMA Panel.
3. Please show all setback lines.
4. Please be aware that the dumpster pad will have to be a 12' x 12' pad with an 8'
solid screening fence. The opening must be a minimum of 12' for the Sanitation
Trucks to service the container.
5. Please show nearest fire hydrant.
6. The vacuum island will be blocking the approach to the dumpster when a vehicle is
being serviced so the enclosure will need to be relocated (Peter Caler).
LANDSCAPE /STREETSCAPE
7. Please show different symbols for the different types of trees and shrubs you are
proposing. It is very difficult to decipher between the number and letter symbols you
are currently showing.
8. Please show the tree or shrub symbol beside the point calculation.
9. On the required buffer you are required 14 canopy trees every 25 -ft., and 119 five -
gallon shrubs for every 3 linear ft., you are only showing 80 shrubs on the south
property line and 75 shrubs on the north property line. You cannot count any of
theses points toward your required streetscape plantings and point requirements.
10. Please delineate exactly what type (instead of a multiple choice) of canopy tree is
going in the required buffer, as well as the rest of the site. Please be aware that Live
Oaks require a 35 -ft. separation, and all other canopy trees require a 20 -ft.
separation.
11. Please note on the landscape plan that an irrigation plan must be approved prior to
Co. All plantings must be irrigated.
Reviewed by: Jennifer Reeves /Jennifer Flanery Date: 05/ 03/02
ENGINEERING
1. Please include water demand estimate in gpm. This estimate will be used to size
your water meter.
2. Please show "New domestic water meter" and "New irrigation water meter and
backflow preventer ".
3. You will need a Development Permit for the construction phase of this project.
4. Please be aware that if the existing sewer tap is not functional for this project, a new
tap must be installed.
Reviewed by: Spencer Thompson Date: May 8, 2002
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 2 of 3
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city).
5. Developer provides digital AutoCAD 2000i version of plat and /or site plan.
email to rbolin(a�-ci.college- station.tx.us
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction
purposes.
8. Developer provides easements for electric infrastructure as installed for
electric lines.
Reviewed by: Ronnie Bolin Date: 5 -7 -02
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker or
Reduced Pressure Principle Back Flow Device and installed as per City Ordinance
2394.
2. All BackFlow devices must be installed and tested upon installation as per City
Ordinance 2394.
Reviewed by: Rob Werley
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 3 of 3
s: eriu;ette I e-q X79-764 -599:
STAFF= REVIEW COMMENTS NCI. I
Ft: e ' C-
Project SHAMMY EXPRESS GAR �AJASH ASP) -SITE PLAN (02- 0,nCO089)
PLANNING
U(I Please note on the site plan the tota! site area aria iegal descripticn
�j 1 c=leave note or° the site Alen whether the sub"eet .ro � erty is in the 100 -year f!cod plain
- ,et the FEMA Panel. We D �St IhTaGtivr�Q wi WU�� ( - 1 ���
Fleas? shop all setback Iir.es A "fa `yU A I co, r See ,4 r f zi.. l • I C• 1
j,, IF�se be aware shat the dumpster pa:) wili havil- to be a 12' x 12 pad witt? an 6 solid
ad• °cer,. : :t the The. ijpen ' 'r; ( r.� /,,. must be a minin °� M 1 of 12' for the Sanitation Tr'!,c� r^
se tl y It RC -VUUD A I / `.�. , 1 / A I''
�u 'lease show nearest fire t•:ydrant ,Added, Sec. A • 1, C • 1
1�Tie ',ac ,urp island will be ;olo the approach, to tale rjurt�pster wnen a vehicle II II 0 __
, belr :g serviced so the enciosure vj;' need to be relocated (Peter Caber; 56-114 tv. �t✓ c. 4--
d\jM Ks -" !� �tG 40 G kve- rd�le- C�tv►op� l'S 3o
LANftSCApE;STREETSC PE , roy
Please show n4ferent `~vmbo's for the different types of trees and st±rlths yo..! are
�)rcposi ,g 1 iv very Cdsflkult to decipher between the number and letter syrmbois you ar=
cufrently shov ing :5C-t A • 1.1 '
P ?;'`rsr how the tree, or'el ?r syrnbol onside tine p oint ti A . (,
� f,, v /1✓ 7, .he r equired buffer vov; are required 1 canopy trees e��ery 25 -ft.. and ', " 9 five
- ra;ic
:cr u; } rrea rt. you ar ,only showing LO shrubs an the uuth grape t j lire
nd 75 shrug )s or the north property line. Ycu cannot count any of theses nts dovvarrd
ri:gr r ireo st'eetslape pi ings and point requirem
' ~lease de I' eat ,? i'.xactly t°Mar type %Instea of a T i!tiP * cho: -oe) :.f ca opy : ''P is Cicmg
r the rc-cjuiri. buffer, as "rteil as t rest of trw Please be aware tha; Libe rears
-e�i. ire s. -ft. sel aration, and all other canopy trees iiequite a 2C-41. serraratioll.
a: :? note on r"Pe `er'Jscape pian t ^ an irr'gatlor (plain r,' *t be ap onivec prior to
pl ng s nvJst re irrl aied. see- AJ ,
ed hv- Jennifer Ree ves;'Ser,ni`er Fl eery Date: 0510,
ENGINEERING
= include Water "C, and estillla`L' in Op? ,. TI11S G�Stif1 "gate ?r�,gil£ae to SIZe your
r"'.8ter Sjc-P' �/
+
'-lease hu'vv "Neoi d_mesric watef runt ?ti a nd 'I';- o li, ltg 'atii,:n wafer meter and "aCkfl�,
re,e tz 5eg C •
L-e: You 44.,11 r a DaYeioprnen} Perrnii for t - "t° phase of this pro °ct.`5�
reusa �c �,rar�; that If the existing sewer terp r�s riot fur,ctlr�nal f ,)r this pr � evt, a ne�nr tarp
r"e ln.:�ta1pd - r�1A►Jte_ yb v
R> Liewed bv S;)enc;er Thompson
Dat NAIa ;, 2G
�•t.1
13OTE , n'a - e ;c vie Mars that "rave not '.:c<en Teau :s :ed b, F: e City of _.erc . b:.3 :< , ' Gs he e -Van°o rr, c
sro rai Ierei anc ,jbbied it fcu plans Any aacti:^ a! har,.s :n JLts. pla n
�vnst tuts a �o °'!rr ;ete, : +,e evievi
__'.._ _ ,,. .'n: 8`_� ;e':Y e^ ' �G..•')Fi ".F�: rte... - �.
11� LECTRICAL
Deveioper installs conduit per city specs and design.SgE G •
U�.: � nn
Developer provides 30' of #A rigid conduit r'or riser poles. Developer installs
first 10'. City instaiis rerra!nder p/,& �(' w . ',a1t,n
-(-%r5 tra�zsfo rr.er ,)adis i per c ty specs and design. S�t;� C 1� A 1 yt��
�• '_ ?ta,o�j� r .nstalls Puli !�J:.E,r Vic, per ^ir :5 r,c :awl Qesign.tpull okeS
iced by the City). G.
G -- Deve,riper ,^, t-u ides digila 20000 ` ersi,)n of plat andV site plan.
tf c i''C r�rlir?_ QiIQ E' _statiot tx � 4,s 5t>L1N O&S PPy A `f • D L 1'N
r ;evaio,Per provides load data fo, Project. 5E � 1
i . le ov r r 7 ".'! P r r t r n
�..`� ; i ,.. p��., of ,ides tef;� Cora: y big n�•:. a.�r;ri�ent fu corn, „,�tio .
pro•'iides aasem -nts for e! Ott infra_tr:tcctur�: as insL aile� for
aht
Ye�ie bv: Bonnie Bolin Date: 5 i - Q2
MISCELLANEOUS
irrigation system must be protected by either a Pressure 'va ;LAIM BreaKer or educed
Pressure Principle Back Flow Device and ;nsta'led as per City Ordinance 23 -'. 5ef—
A1 'ackRcvj dev ces mast :)e installed and tested _ipcn installation as pet lilt;'
0 - 3 nce
f?r-viev ;ed Ll� Pt,,b `vVerley
NCT . h, ; Jncm,c� rr aae tie piers :hat have not .een requ.s:ed by t C!iy of C.,' e.;F S ;utioa, r!os; b: eq la!ne( a, yua! -� t
x ,mtta; ierer ar b'uh,)!ed or your plan, Any and tonai -narges ar. rhese p ns tcal t: -,e 'o' :eer, �'c cd U! io °re
icte a - ,c, ne,, revievv
Da:r� _
STAFF REVIEW COMMENTS NO. 2
Project: SHAMMY EXPRESS CAR WASH (SP) -SITE PLAN (02- 00500089)
PLANNING
1. Please note on the site plan that the subject property is not located within the 100 -
year flood plain referencing FEMA Panel 48041 C01 44C.
2. The dumpster orientation will not work for sanitation if there are cars parked in the
vacuum island. Please contact Pete Caler (764 -3841) to work this out and make
those revisions on the site plan.
Reviewed by: Jennifer Reeves Date: 05/28/02
ENGINEERING
1. Please include water demand estimate in gpm. This estimate will be used to size
your water meter.
Reviewed by: Spencer Thompson Date: May 28, 2002
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
2 of 2