Loading...
HomeMy WebLinkAbout00072850CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM TO: Andy Restivo, Via fax 254.752.0300 FROM: Bridgette George, Assistant Development Manager SUBJECT: RESTIVO'S CORNER (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Two (2) revised site and landscaping plans. Easement Dedication Sheet and required documents. Please note that the Easement Dedication Sheet and the necessary documents are required prior to the issuance of a building permit. Parkland Dedication fees ($345 per dwelling unit) will be due prior to the issuance of building permits. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Christian Galindo via fax 846.8868 Case file #02 -086 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 1 Project: RESTIVO'S CORNER (SP) -SITE PLAN (02 -086) PLANNING 1. The property has been addressed as 1128 Gridiron. Please include this address in the title block with the next submittal. 2. Please call out the ownership of lots 7 and 9. 3. Please identify the size of the water lines running along the southwest and southeast property lines. 4. Because the sidewalk will not be safe when a car parks in front of a porch, parking spaces must be 20 ft. long or the sidewalk widened. 5. Please call out the distances to opposite and adjacent driveways and /or street intersections. 6. As per previous discussions with City staff, roll out containers will not be able to be used for this development. Please show a dumpster location that will be screened from the ROW. 7. Please shift the line of shrubs on the west side of the driveway southward so they may better screen the parking lot. 8. This site has to meet streetscaping requirements (street trees and additional landscaping points). Even though the street tree requirement is met because there are two canopy trees planted within 50 feet of the property line along the street, please identify the requirement on the site plan. The additional point requirement of streetscaping will still need to be met (300 additional landscaping points for every 50 linear feet, excluding driveways). 9. Irrigation is required for landscaping. If General Note #11 is in reference to landscaping irrigation, please clarify. 10. No -Go for 70 gallon collection. This one requires either a 300 gallon or front end loader dumpster pad. Reviewed by: Molly Hitchcock Date: May 1, 2002 ENGINEERING 1. Show irrigation meter and back -flow preventor, if needed. 2. Show max slope of 6" sewer line. Reviewed by: Spencer Thompson Date: May 8, 2002 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 3 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 2000i version of plat and /or site plan. email to rbolin(a�-ci.college- station.tx.us 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). Reviewed by: Ronnie Bolin Date: 4 -30 -02 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. Reviewed by: Rob Werley NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 3 of 3