HomeMy WebLinkAbout00072822City of College Station
Development Services
P. O. Box 9960 - 1101 Texas Avenue - College Station, Texas 77842
COLLEGE • ( 979) 764 -3570
WOLF PEN CREEK
DESIGN REVIEW BOARD MEETING
May 21, 2002
TO: Bryan Euwer, via fax 512 -328 -7613
And Dewayne Costello, Vice President of Operations for Taco Bell /Pizza Hut
FROM: Design Review Board
Kay Henryson, DRB Chair
Judy Holt, DRB Member
Phillip Kelby, DRB Member
George McLean, DRB Member
Wallis McMath, P &Z Commissioner
Phil Trapani, P &Z Commissioner
Staff Attending:
Natalie Ruiz, Development Review Manager
Molly Hitchcock, Staff Planner
Jennifer Reeves, Staff Planner
Tammy Macik, Secretary
SUBJECT: Taco Bell. Discussion and consideration offa(7ade and sign changes located at 310
Harvey Road (02- 79)
A Wolf Pen Creek Design Review Board meeting was held on Wednesday, May 15, 2002 to
review the above - mentioned. DRB Chairman Henryson asked if there would be any changes to
the sign up front. Mr. Costello stated it would not change. DRB Chairman Henryson asked if
there were any comments or questions in regard to the materials and colors. DRS Member
McLean asked about the color of the tile for the lower section of the building. Mr. Costello
stated that the color is not as bright as seen in the picture. DRB Member Henryson asked for a
motion. Commissioner Trapani made the motion for approval of materials and colors. DRB
Member Kelby seconded it and it passed 6 -0. DRB Chairman Henryson asked if there were any
questions or concerns about the signage. Commissioner Trapani asked staff if there were any
issues. Staff Planner Reeves stated the colors are all that need to be looked at. The attached
signage meets the requirements of not exceeding more than 12 inches away from the building
or above the roof. Mr. Costello stated the pole sign would remain as is. DRB Chairman
Henryson asked if they were back lit signs. Mr. Costello stated replied yes. DRB Chairman
Henryson asked for a motion. DRB Member Kelby motioned to accept the signage as shown.
Commissioner Wallis seconded and it passed 6 -0. DRB Chairman Henryson mentioned the
new George Bush East Road and how it may affect the Taco Bell site. She stated where the new
bridge is located, there would eventually be pedestrian and bicycles trials. She recommend
they keep that in mind when doing the landscape for this site and other landscaping
renovations.
"W City of College Station
v e
400 Development Services
P. O. Box 9960 - 1101 Texas Avenue - College Station, Texas 77842
COLLEGE (979) 764 -3570
WOLF PEN CREEK
DESIGN REVIEW BOARD MEETING
May 21, 2002
TO: Bryan Euwer, via fax 512- 328 -7613
And Dewayne Costello, Vice President of Operations for Taco Bell /Pizza Hut
FROM: Design Review Board
Kay Henryson, DRB Chair
Judy Holt, DRB Member
Phillip Kelby, DRB Member
George McLean, DRB Member
Wallis McMath, P &Z Commissioner
Phil Trapani, P &Z Commissioner
Staff Attending:
Natalie Ruiz, Development Review Manager
Molly Hitchcock, Staff Planner
Jennifer Reeves, Staff Planner
Tammy Macik, Secretary
SUBJECT: Taco Be11- Discussion and consideration offapade and sign changes located at 310
Harvey Road (02 -79)
A Wolf Pen Creek Design Review Board meeting was held on Wednesday, May 15, 2002 to
review the above - mentioned. DRB Chairman Henryson asked if there would be any changes to
the sign up front. Mr. Costello stated it would not change. DRB Chairman Henryson asked if
there were any comments or questions in regard to the materials and colors. DRB Member
McLean asked about the color of the tile for the lower section of the building. Mr. Costello
stated that the color is not as bright as seen in the picture. DRB Member Henryson asked for a
motion. Commissioner Trapani made the motion for approval of materials and colors. DRB
Member Kelby seconded it and it passed 6 -0. DRB Chairman Henryson asked if there were any
questions or concerns about the signage. Commissioner Trapani asked staff if there were any
issues. Staff Planner Reeves stated the colors are all that need to be looked at. The attached
signage meets the requirements of not exceeding more than 12 inches away from the building
or above the roof. Mr. Costello stated the pole sign would remain as is. DRB Chairman
Henryson asked if they were back lit signs. Mr. Costello stated replied yes. DRB Chairman
Henryson asked for a motion. DRB Member Kelby motioned to accept the signage as shown.
Commissioner Wallis seconded and it passed 6 -0. DRB Chairman Henryson mentioned the
new George Bush East Road and how it may affect the Taco Bell site. She stated where the new
bridge is located, there would eventually be pedestrian and bicycles trials. She recommend
they keep that in mind when doing the landscape for this site and other landscaping
renovations.
WOLF PEN CREEK DESIGN REVIEW BOARD
STAFF REPORT
Project Manager: Jennifer Reeves Date: 05/08/02
E -mail: jreeves @ci.college - station.tx.us
For
TACO BELL (SDSP) (02- 00500079)
All proposals involving site development or redevelopment in the Wolf Pen Creek
Corridor District shall require a review of the Wolf Pen Creek Design Review Board
(DRB):
Zoning District: (WFP) Wolf Pen Creek Development Corridor
Location: 310 Harvey Road
Applicant: Bryan Euwer
Item Summary: The applicant is proposing facade changes to the Taco Bell
located at 310 Harvey Road. The changes will consist of
repainting the exterior of the building, installing three 20 -sq ft.
attached signs and replacing the panel out of the existing
freestanding sign.
Item Background:
Issues /Items for Review:
1. Building design
• Materials
• Colors
2. Signs
• Design
• Scale and proportion
• Colors, materials, lighting
• Number of graphic elements
• Compatibility with adjacent signs
Attachments:
1. Site Plan
2. Architectural Plan
3. Picture of finished product
WOLF PEN CREEK DESIGN REVIEW BOARD
STAFF REPORT
Project Manager: Jennifer Reeves Date: 05/08/02
E -mail: jreeves @ci.college - station.tx.us
For
TACO BELL (SDSP) (02- 00500079)
All proposals involving site development or redevelopment in the Wolf Pen Creek
Corridor District shall require a review of the Wolf Pen Creek Design Review Board
(DRB):
Zoning District: (WFP) Wolf Pen Creek Development Corridor
Location: 310 Harvey Road
Applicant: Bryan Euwer
Item Summary: The applicant is proposing facade changes to the Taco Bell
located at 310 Harvey Road. The changes will consist of
repainting the exterior of the building, installing three 20 -sq ft.
attached signs and replacing the panel out of the existing
freestanding sign.
Item Background:
Issues /Items for Review:
1. Building design
• Materials
• Colors
2. Signs
• Design
• Scale and proportion
• Colors, materials, lighting
• Number of graphic elements
• Compatibility with adjacent signs
Attachments:
1. Site Plan
2. Architectural Plan
3. Picture of finished product
AGENDA
Wolf Pen Creek Design Review Board
CITY OF COLLEGE STATION, TEXAS
City Hall Training Room
1101 Texas Avenue
Wednesday, May 15, 2001
9:30 A.M.
Taco Bell Discussion and consideration of fagade and sign changes located at
310 Harvey Road (02 -79)
N.
This building is wheelchair accessible. Handicapped parking spaces are available. Any request for sign
interpretive services must be made 48 hours before the meeting. To make arrangements call 409 -764-
3547 or (TDD) 1 -800- 735 -2989.
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979)764 -3570 / Fax (979)764 -3496
TO: DI R K ,Do Zi EA ,5'1 7- YP25
FROM: Susan Hazlett, Staff Assistant
DATE: June 4, 2002
RE: StaffReport/Project Presentation
P &Z Meeting, June 6, 2002
Following this coversheet is a copy of the Staff Report that was prepared for the following
project. Please keep in mind that stall's responsibility is to provide the Planning & Zoning
Commission with all pertinent facts of a development case, but that staff is not acting as an
advocate for the applicants. Therefore, it is in the applicant's best interest to send a
representative to the Planning & Zoning Commission meeting to speak on behalf of the
proposal.
This item is scheduled for the Thursday, June 6, 2002 Planning & Zoning Commission
Meeting. This meeting will begin at 7:00 P.M. in City Hall Council Chambers. I have
included a copy of the agenda for this meeting. Please contact our office at (979)764-
3570 if you should have any questions. Thanks.
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979)764 -3570 / Fax (979)764 -3496
TO: S41,41 I .J l07 in - 74 /3
FROM: Susan Hazlett, Staff Assistant
DATE: June 4, 2002
RE: StaffReport/Project Presentation
P &Z Meeting, June 6, 2002
Following this coversheet is a copy of the Staff Report that was prepared for the following
project. Please keep in mind that stall's responsibility is to provide the Planning & Zoning
Commission with all pertinent facts of a development case, but that staff is not acting as an
advocate for the applicants. Therefore, it is in the applicant's best interest to send a
representative to the Planning & Zoning Commission meeting to speak on behalf of the
proposal.
This item is scheduled for the Thursday, June 6, 2002 Planning & Zoning Commission
Meeting. This meeting will begin at 7:00 P.M. in City Hall Council Chambers. I have
included a copy of the agenda for this meeting. Please contact our office at (979)764-
3570 if you should have any questions. Thanks.