Loading...
HomeMy WebLinkAbout00072822City of College Station Development Services P. O. Box 9960 - 1101 Texas Avenue - College Station, Texas 77842 COLLEGE • ( 979) 764 -3570 WOLF PEN CREEK DESIGN REVIEW BOARD MEETING May 21, 2002 TO: Bryan Euwer, via fax 512 -328 -7613 And Dewayne Costello, Vice President of Operations for Taco Bell /Pizza Hut FROM: Design Review Board Kay Henryson, DRB Chair Judy Holt, DRB Member Phillip Kelby, DRB Member George McLean, DRB Member Wallis McMath, P &Z Commissioner Phil Trapani, P &Z Commissioner Staff Attending: Natalie Ruiz, Development Review Manager Molly Hitchcock, Staff Planner Jennifer Reeves, Staff Planner Tammy Macik, Secretary SUBJECT: Taco Bell. Discussion and consideration offa(7ade and sign changes located at 310 Harvey Road (02- 79) A Wolf Pen Creek Design Review Board meeting was held on Wednesday, May 15, 2002 to review the above - mentioned. DRB Chairman Henryson asked if there would be any changes to the sign up front. Mr. Costello stated it would not change. DRB Chairman Henryson asked if there were any comments or questions in regard to the materials and colors. DRS Member McLean asked about the color of the tile for the lower section of the building. Mr. Costello stated that the color is not as bright as seen in the picture. DRB Member Henryson asked for a motion. Commissioner Trapani made the motion for approval of materials and colors. DRB Member Kelby seconded it and it passed 6 -0. DRB Chairman Henryson asked if there were any questions or concerns about the signage. Commissioner Trapani asked staff if there were any issues. Staff Planner Reeves stated the colors are all that need to be looked at. The attached signage meets the requirements of not exceeding more than 12 inches away from the building or above the roof. Mr. Costello stated the pole sign would remain as is. DRB Chairman Henryson asked if they were back lit signs. Mr. Costello stated replied yes. DRB Chairman Henryson asked for a motion. DRB Member Kelby motioned to accept the signage as shown. Commissioner Wallis seconded and it passed 6 -0. DRB Chairman Henryson mentioned the new George Bush East Road and how it may affect the Taco Bell site. She stated where the new bridge is located, there would eventually be pedestrian and bicycles trials. She recommend they keep that in mind when doing the landscape for this site and other landscaping renovations. "W City of College Station v e 400 Development Services P. O. Box 9960 - 1101 Texas Avenue - College Station, Texas 77842 COLLEGE (979) 764 -3570 WOLF PEN CREEK DESIGN REVIEW BOARD MEETING May 21, 2002 TO: Bryan Euwer, via fax 512- 328 -7613 And Dewayne Costello, Vice President of Operations for Taco Bell /Pizza Hut FROM: Design Review Board Kay Henryson, DRB Chair Judy Holt, DRB Member Phillip Kelby, DRB Member George McLean, DRB Member Wallis McMath, P &Z Commissioner Phil Trapani, P &Z Commissioner Staff Attending: Natalie Ruiz, Development Review Manager Molly Hitchcock, Staff Planner Jennifer Reeves, Staff Planner Tammy Macik, Secretary SUBJECT: Taco Be11- Discussion and consideration offapade and sign changes located at 310 Harvey Road (02 -79) A Wolf Pen Creek Design Review Board meeting was held on Wednesday, May 15, 2002 to review the above - mentioned. DRB Chairman Henryson asked if there would be any changes to the sign up front. Mr. Costello stated it would not change. DRB Chairman Henryson asked if there were any comments or questions in regard to the materials and colors. DRB Member McLean asked about the color of the tile for the lower section of the building. Mr. Costello stated that the color is not as bright as seen in the picture. DRB Member Henryson asked for a motion. Commissioner Trapani made the motion for approval of materials and colors. DRB Member Kelby seconded it and it passed 6 -0. DRB Chairman Henryson asked if there were any questions or concerns about the signage. Commissioner Trapani asked staff if there were any issues. Staff Planner Reeves stated the colors are all that need to be looked at. The attached signage meets the requirements of not exceeding more than 12 inches away from the building or above the roof. Mr. Costello stated the pole sign would remain as is. DRB Chairman Henryson asked if they were back lit signs. Mr. Costello stated replied yes. DRB Chairman Henryson asked for a motion. DRB Member Kelby motioned to accept the signage as shown. Commissioner Wallis seconded and it passed 6 -0. DRB Chairman Henryson mentioned the new George Bush East Road and how it may affect the Taco Bell site. She stated where the new bridge is located, there would eventually be pedestrian and bicycles trials. She recommend they keep that in mind when doing the landscape for this site and other landscaping renovations. WOLF PEN CREEK DESIGN REVIEW BOARD STAFF REPORT Project Manager: Jennifer Reeves Date: 05/08/02 E -mail: jreeves @ci.college - station.tx.us For TACO BELL (SDSP) (02- 00500079) All proposals involving site development or redevelopment in the Wolf Pen Creek Corridor District shall require a review of the Wolf Pen Creek Design Review Board (DRB): Zoning District: (WFP) Wolf Pen Creek Development Corridor Location: 310 Harvey Road Applicant: Bryan Euwer Item Summary: The applicant is proposing facade changes to the Taco Bell located at 310 Harvey Road. The changes will consist of repainting the exterior of the building, installing three 20 -sq ft. attached signs and replacing the panel out of the existing freestanding sign. Item Background: Issues /Items for Review: 1. Building design • Materials • Colors 2. Signs • Design • Scale and proportion • Colors, materials, lighting • Number of graphic elements • Compatibility with adjacent signs Attachments: 1. Site Plan 2. Architectural Plan 3. Picture of finished product WOLF PEN CREEK DESIGN REVIEW BOARD STAFF REPORT Project Manager: Jennifer Reeves Date: 05/08/02 E -mail: jreeves @ci.college - station.tx.us For TACO BELL (SDSP) (02- 00500079) All proposals involving site development or redevelopment in the Wolf Pen Creek Corridor District shall require a review of the Wolf Pen Creek Design Review Board (DRB): Zoning District: (WFP) Wolf Pen Creek Development Corridor Location: 310 Harvey Road Applicant: Bryan Euwer Item Summary: The applicant is proposing facade changes to the Taco Bell located at 310 Harvey Road. The changes will consist of repainting the exterior of the building, installing three 20 -sq ft. attached signs and replacing the panel out of the existing freestanding sign. Item Background: Issues /Items for Review: 1. Building design • Materials • Colors 2. Signs • Design • Scale and proportion • Colors, materials, lighting • Number of graphic elements • Compatibility with adjacent signs Attachments: 1. Site Plan 2. Architectural Plan 3. Picture of finished product AGENDA Wolf Pen Creek Design Review Board CITY OF COLLEGE STATION, TEXAS City Hall Training Room 1101 Texas Avenue Wednesday, May 15, 2001 9:30 A.M. Taco Bell Discussion and consideration of fagade and sign changes located at 310 Harvey Road (02 -79) N. This building is wheelchair accessible. Handicapped parking spaces are available. Any request for sign interpretive services must be made 48 hours before the meeting. To make arrangements call 409 -764- 3547 or (TDD) 1 -800- 735 -2989. CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979)764 -3570 / Fax (979)764 -3496 TO: DI R K ,Do Zi EA ,5'1 7- YP25 FROM: Susan Hazlett, Staff Assistant DATE: June 4, 2002 RE: StaffReport/Project Presentation P &Z Meeting, June 6, 2002 Following this coversheet is a copy of the Staff Report that was prepared for the following project. Please keep in mind that stall's responsibility is to provide the Planning & Zoning Commission with all pertinent facts of a development case, but that staff is not acting as an advocate for the applicants. Therefore, it is in the applicant's best interest to send a representative to the Planning & Zoning Commission meeting to speak on behalf of the proposal. This item is scheduled for the Thursday, June 6, 2002 Planning & Zoning Commission Meeting. This meeting will begin at 7:00 P.M. in City Hall Council Chambers. I have included a copy of the agenda for this meeting. Please contact our office at (979)764- 3570 if you should have any questions. Thanks. CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979)764 -3570 / Fax (979)764 -3496 TO: S41,41 I .J l07 in - 74 /3 FROM: Susan Hazlett, Staff Assistant DATE: June 4, 2002 RE: StaffReport/Project Presentation P &Z Meeting, June 6, 2002 Following this coversheet is a copy of the Staff Report that was prepared for the following project. Please keep in mind that stall's responsibility is to provide the Planning & Zoning Commission with all pertinent facts of a development case, but that staff is not acting as an advocate for the applicants. Therefore, it is in the applicant's best interest to send a representative to the Planning & Zoning Commission meeting to speak on behalf of the proposal. This item is scheduled for the Thursday, June 6, 2002 Planning & Zoning Commission Meeting. This meeting will begin at 7:00 P.M. in City Hall Council Chambers. I have included a copy of the agenda for this meeting. Please contact our office at (979)764- 3570 if you should have any questions. Thanks.