HomeMy WebLinkAbout00072806CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM April 29, 2002 TO: Margaret Grisson, CEI Engineering Associates, Via fax 972 - 488 -6732 FROM: Bridgette George, Assistant Development Manager SUBJECT: KROGER FUELING STATION (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval of the plans: Six (6) revised sets of construction documents. Easement Dedication Sheet and required documents. Please note that the Easement Dedication Sheet and the necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Weingarten Realty Investors, Via fax 713 - 866 -6049 Curtis Burnett, Via fax 713 - 507 -4818 Case file #02- 00500078 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 1 of 3 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM April 29, 2002 TO: Margaret Grisson, CEI Engineering Associates, Via fax 972 - 488 -6723 FROM: Bridgette George, Assistant Development Manager SUBJECT: KROGER FUELING STATION (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Two (2) revised site and landscaping plans. Easement Dedication Sheet and required documents. Please note that the Easement Dedication Sheet and the necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Weingarten Realty Investors, Via fax 713 - 866 -6049 Curtis Burnett, Via fax 713 - 507 -4818 Case file #02- 00500078 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 1 of 3 STAFF REVIEW COMMENTS NO. 1 Project: KROGER FUELING STATION (SP) -SITE PLAN (02- 00500078) PLANNING 1. Signs are permitted separately. You will need to submit through the building division (Questions on permitting signs 979 - 764 -3570, Carl Warren) 2. Currently there is not a fire hydrant within 300 ft. of the proposed structure, you will be required to install one. (Questions regarding location, Jon Mies 979 - 764 -3781) 3. The proposed air and phone equipment will have to be screened from the R.O.W. with some screening shrubs. 4. All plantings must be irrigated. An irrigation plan must be approved prior to CO. 5. Sanitation is ok with this project. 6. Per the following TxDOT comment regarding the building setback line, please be aware that the city's minimum requirement for a drive aisle is 23'. If you do not construct your building line from the new TxDOT ROW line, you may not meet this standard once the new ROW exists. Reviewed by: Jennifer Reeves Date: 04/26/02 ENGINEERING Please realize this is Site Plan Review, only. I do not see in our system that you have applied for a Building Permit. 1. Please include drawings with TXDOT permit applications. The TXDOT Office will not accept the permit if it has not been signed by the "owner ". Also, please ensure headwall meets TXDOT standards including erosion protection. 2. Concerning the storm drain, specify pipe size and type. 3. Sheet C -6: Building sewer clean -out distance is every 100'. 4. Sheet C -6: Flow line call -out shows in is equal to out on sewer main. However, on Detail 40B Sheet C -7 this is not the case. 5. Sheet C -6: Note 22H calls for a M.J. on the 1" water line. Is this the intention? 6. Concerning the TXDOT comment, please eliminate the headwall and use riprap. Reviewed by: Spencer Thompson Date: April 26, 2002 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 3 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 14 version of plat and /or site plan. email to rbolin ,ci.college- station.tx.us 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines. Reviewed by: Ronnie Bolin Date:4 -25 -02 TxDOT 1. The setback lines are shown from the existing right of way line, not the proposed. 2. Drainage into our ditch as shown will not be allowed. Drainage is going straight toward roadway and headwall will not be allowed. Reviewed by: Catherine Hejl Date4 /26/02 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 3 of 3 STAFF REVIEW COMMENTS NO. 1 Project: KROGER FUELING STATION (SP) -SITE PLAN (02- 00500078) PLANNING 1. Signs are permitted separately. You will need to submit through the building division (Questions on permitting signs 979 - 764 -3570, Carl Warren) 2. Currently there is not a fire hydrant within 300 ft. of the proposed structure, you will be required to install one. (Questions regarding location, Jon Mies 979 - 764 -3781) 3. The proposed air and phone equipment will have to be screened from the R.O.W. with some screening shrubs. 4. All plantings must be irrigated. An irrigation plan must be approved prior to CO. 5. Sanitation is ok with this project. 6. Per the following TxDOT comment regarding the building setback line, please be aware that the city's minimum requirement for a drive aisle is 23'. If you do not construct your building line from the new TxDOT ROW line, you may not meet this standard once the new ROW is'exists. Reviewed by: Jennifer Reeves Date: 04/26/02 ENGINEERING Please realize this is Site Plan Review, only. I do not see in our system that you have applied for a Building Permit. 1. Please include drawings with TXDOT permit applications. The TXDOT Office will not accept the permit if it has not been signed by the "owner ". Also, please ensure headwall meets TXDOT standards including erosion protection. 2. Concerning the storm drain, specify pipe size and type. 3. Sheet C -6: Building sewer clean -out distance is every 100'. 4. Sheet C -6: Flow line call -out shows in is equal to out on sewer main. However, on Detail 40B Sheet C -7 this is not the case. 5. Sheet C -6: Note 22H calls for a M.J. on the 1" water line. Is this the intention? 6. Concerning the TXDOT comment, please eliminate the headwall and use riprap. Reviewed by: Spencer Thompson Date: April 26, 2002 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 3 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 14 version of plat and /or site plan. email to rbolin a( -ci.college- station.tx.us 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines. Reviewed by: Ronnie Bolin Date:4 -25 -02 TxDOT 1. The setback lines are shown from the existing right of way line, not the proposed. 2. Drainage into our ditch as shown will not be allowed. Drainage is going straight toward roadway and headwall will not be allowed. Reviewed by: Catherine Hejl Date4 /26/02 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 3 of 3 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM May 11, 2002 TO: Margaret Grisson, CEI Engineering Assoc., Via fax 972 - 488 -6732 FROM: Bridgette George, Assistant Development Manager SUBJECT: KROGER FUELING STATION (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review an approval of the plans: Six (6) revised Sheets of C -6 to replace the existing ones. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Case file #02- 00500078 Home of Texas A &M University 0 STAFF REVIEW COMMENTS NO. 2 Project: KROGER FUELING STATION (SP) -SITE PLAN (02- 00500078) PLANNING 1. An irrigation plan must be submitted an approved prior to CO and must show the irrigation line and heads. Reviewed by: Jennifer Reeves Date: 05/08/02 ENGINEERING 1. Sheet C -6. The extension of the water line for the hydrant is considered City infrastructure. You will need to provide a profile construction drawing. You may do this on Sheet 6, if you wish. 2. Concerning the outfall of the storm drain, we would not like to have a piece of plastic pipe "sticking out" of the ditch along Texas Avenue. How can this be addressed? Can an end treatment be used? I will hand write on plans, Sheet C -7. Reviewed by: Spencer Thompson Date: May 9, 2002 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2