HomeMy WebLinkAboutStaff ReportSTAFF REPORT
Item: Consideration of a Final Plat for Holleman Village Addition Section Two, 5.168
acres located at the southwest intersection of Holleman Drive West and Jones Butler
Road (00-021)
Applicant: George Walker, P.E., Wallace Group
Item Summary: The Final Plat consists of one 4.408 acre lot for the expansion
(or phase two) of the Holleman Village Apartments Phase One currently under
construction on Holleman Drive. The Land Use Plan shows this area as
Residential Attached with a density of 10 to 20 dwelling units per acre. The Area
is currently zoned R-5 (Medium Density Apartment).
Holleman Drive West is shown as a major collector on the Thoroughfare Plan, which
requires 70-feet of right-of-way. Currently the right-of-way for Holleman Drive is 60-feet
wide. In accordance with the subdivision regulations, this plat is dedicating half of the
additional right-of-way needed, which is 5-feet.
The extension of Jones-Butler Road as a minor arterial requiring 90-feet of right-of-way
is shown on the east side of subject tract. As was done with Section One in 1999, the
40-feet of right-of-way for the Jones-Butler Road extension, which was previously
dedicated to the city with the Woodway Village Phase One Plat, is shown on this plat for
clarity. Five feet of additional right-of-way is being dedicated for Jones-Butler Road
extension with this plat.
Item Background: The Master Preliminary Plat for Woodway Village was approved in
October 1976. The Final Plat for Woodway Village Phase One was approved in
February 1977, which created a 17.42-acre lot. The Double Tree Condominium
complex is currently constructed on 3.9 acres. There exists in the Brazos County Deed
Records a condominium plat of the 3.9 acres for Phase One of the Double Tree
Condos. This plat as recorded does not constitute actual platting of land under the
Texas Local Government Code and therefore was not subject to the City's Subdivision
Regulations. However, a subdivision of land did occur either during or after the
construction of Double Tree Condos Phase One. This division was subject to the City's
Subdivision Regulations, but no such approval was obtained. Prior to any additional
building or renovation permits being issued for the Doubletree Condominium, this lot will
be required to re-plat the 3.9 acres. A revised Preliminary Plat of Holleman Village
Addition, which included all of the original 17.42 acres as well as additional property to
the south, was approved in March 1999. Holleman Village Addition Section One was
approved and filed in September 1999.
A western portion (40-feet) of the Jones-Butler right-of-way was dedicated with a prior
final plat of Woodway Village Phase One. This final plat will widen the dedication by 5-
feet to the west through the property. The eastern 1/2 of the right-of-way will come from
a 47.27-acre tract owned by Mohawk, Ltd. and a smaller portion (additional 5-feet width)
will come from property previously dedicated to the City as parkland dedication for
apartments that have already been constructed in this general area. The platting of half-
streets is currently not allowed by the subdivision regulations. However, Council
granted a variance at the time the Woodway Village Phase One Final Plat was approved
in February 1977.
A traffic impact analysis was submitted with the Holleman Village Addition Section One
Final Plat. This analysis showed that the development would only justify a 28-foot wide
street, and therefore should only be responsible for the construction cost associated
with that street section.
Budgetary & Financial Summary: Based upon the variance for platting a half street
and traffic impact analysis, the applicant does not desire to construct Jones-Butler Road
on their site. Rather they have proposed to enter into a development agreement with
the City of College Station to contribute toward the construction cost of Jones Butler
Road. This is similar to what was approved with Holleman Village Addition Section One
last year. Council will review the development agreement as a stand-alone item.
Staff Recommendations: Staff recommends approval of the Final Plat with the
following condition:
1. There is a duly executed development agreement to allow monetary participation
rather than construction of Jones-Butler.
Related Advisory Board Recommendations: N/A
Commission Action Options: The Commission has final authority over the final plat.
The options regarding the final plat are approval as submitted, approval with conditions,
or denial. Defer action or table only at applicant's request.
Supporting Materials:
1. Location Map
2. Application
3. Infrastructure and Facilities
4. Copy of Final Plat
INFRASTRUCTURE AND FACILITIES
Water: Water is provided to the area through an 8" waterline along Holleman
Drive. As part of the site development, water will be extended through the site
to provide fire protection.
Sewer: Sewer currently extends through the subject tract. Some relocation, at
the owner's expense, is expected with the site plan.
Streets: Access to all lots is via Holleman Drive. Holleman Drive is shown on
our Thoroughfare Plan as a major collector with a 70' right-of-way. It currently
has only a 60' right-of-way so half of the additional right-of-way adjacent to this
property is being dedicated for Holleman Drive West. A condition of approval
for the preliminary plat was the inclusion of a 5' right-of-way dedication for
Jones-Butler Road. In addition the Commission conditioned a duly executed
development agreement to allow monetary participation rather than
construction of Jones-Butler Road.
A traffic impact analysis (TIA) was completed for the Fairfield development in
order to determine the amount of oversize participation the developer can
request for the construction of Jones-Butler. In that analysis, the traffic
engineer stated that the amount of traffic generated by this one lot could be
handled by Holleman Drive and that their development did not create the need
for a street along the Jones-Butler alignment. They acknowledged that Jones-
Butler as a thoroughfare will be necessary for the area for better traffic
distribution, but it was not warranted solely by this development. The TIA
states that the additional traffic generated by this site could be addressed with
timing changes to the signal at the Holleman/Wellborn intersection.
Off-site Easements: None required
Drainage: Drainage will be handled individually by each development as part
of the site planning process. Drainage issues will be in accordance with the
City Drainage Ordinance.
Flood Plain: There is no floodplain located on the property.
Oversize request: See Budgetary and Financial Summary Section.
Impact Fees: None.
NOTIFICATION:
None required