HomeMy WebLinkAbout00072736MAR-27 '00 (SUN) 11:42 WALLACE GROUP 2547728691 PAGE.1/2
The
Wallace
Group, inc.
Engineers■Arahifects■PlannersaSurveyors FAX COVER SHEET
DATE: ✓
SUBJECT.-
:
TO
ATTENTION:
* Lot- rH V r-O
1NCLUDINO
FAX NUMBER: 1 COVER SHRET:
REMARKS: 01 ~,-JOlU _ r ?/AtUJ - ylQA(j ,&-MJ112A %
3/31 -
3/11 - Ct-~ 4 R,24,J - -
4UIX 5'ew-'e
rr
r f/ q~
FROM: -'d IA V~
P. O, Box 22007 - Waco, Texas 76702
8225 Central Park Drive, Suite 100 , Waco, Texas 76712
(254) 7729272 - (800) 336-1683 - Fax (254) 776-2924
The information contained in this facsimile Is privileged and confidential. It is Intended ONLY for the use of
the Individual or entity named above. If you have received this transmission in error, notify The Wallace
Group by telephone (collect) and return the transmission to the above address.
04/03/00 10:20 FAX 8123456981
R.LEE & ASSOC. 1001
MEMORANDUM
Date: Apri13, 2000
To: Edwin Hard, City of College Station
From: Richard Lee 0CAV
1 •~t~ Re: Holleman Village Phase 2
cc: David Wright, Fairfield Development
Please look over the changes to the secondary entry to our apartment project. As we discussed, I
have widened the median along the visitor's entrance and added a turnaround in case a visitor is
denied access.
I would appreciate your approval of these changes before we submit a formal update to the City.
Feel free to call me if you have any questions.
Thanks.
40*7
Alve
9. &.0- A,4
s &,y
q-1 q106
Richard Lee and Associates
3724 Executive Center Drive, Suite 159, Austin, Texas, 76731
Tel: (512) 345-8477 Fax: (512) 345-6991
N
THE,
WA'LLACE
G RE) Uff
IN C,;
E N G I N E E R S
A R C H I T E C T S
P L A N N E R S April 10, 2000
S U R V E Y O R S
WACO
K I L L E E N City of College Station Development Services
T E M P L E
A U S T I N 1101 South Texas Avenue
D A L L A S College Station, Texas 77840
Attn: Ted Mayo, P.E.'
Re: Holleman Village Phase II
Dear Ted:
Sean Flaherty, R.P.L.S.
Kevin Hessel, R.P.L.S.
George Jezek, A.I.A.
Mike Keahey, RE., R.P.L.S.
June Lykes, P. E.
David Marek, P.E.
Thomas J. Mireur Jr., R. P.L.S.
Dan Nixon, R.P.L.S.
J.A. "Jake Pavlas, Jr., P.E.
David B. Porter, P.E.
Scott Posey, R. P. L.S.
Lynn Simpson, R.P.L.S.
Darrell Vickers, A.I.A.
George E. "Jed" Walker, Jr., P.E.
R.E. "Bob" Wallace, RE., R.P.L.S.
Otto E. Wiederhold, P.E.
John F. Winkler, PE.
Today we resubmitted the Holleman Village Phase II construction plans for final review
and hopefully for the site development permit. To the best of my knowledge, all
comments regarding the infrastructure review for the project have been addressed with
the following exceptions:
• We decided to leave the original topographic and boundary survey in the construction
drawings in order to provide the bidders and ultimately the contractor with the
existing topographic information. We understand your concerns that the 100-year
floodplain is misrepresented on this map; however, we ask that you disregard this.
Further, we understand that the boundary depicted on this A.L.T.A. Survey is not the
final boundary as per the final plat. This difference is due to the rededication of the
Jones-Butler right-of-way. We hope that you and your staff reviewers can disregard
this sheet for permitting purposes and treat it only as an informational sheet that will
be used by the bidders and the successful contractor.
• We understand that College Station staff is still considering the use of the collector
drain (french drain) along the flow line of the detention basin. If this french drain is
unacceptable to City staff, we can certainly put in a concrete pilot flume just as we
did in the flow line of Holleman Village Phase I detention pond. However, it is the
Owner's desire to put in the french drain if at all possible.
With regards to the site plan review, we have addressed all of the comments to the best of
my knowledge with the following exceptions:
• We have not shown the horizontal alignment of the GTE phone lines, nor have we
shown the future locations of any GTE telephone risers or related appurtenances due
to the fact GTE has not yet designed their system. In talking with Mr. Richard
Wallace of GTE (phone number - 979-821-4752) he has explained to me that GTE
will not start preparing their plans until a building permit is issued for the project. He
stated however, that for this project there would be no above grade appurtenances or
risers near or along Holleman Drive or the future Jones-Butler roadway. He stated
that in lieu of risers, flush mounted concrete pull boxes will be installed in or near the
P.O. Box 22007 areas of the right-of-way. Further, he stated that he doubted very seriously if there
Waco, Texas 76702 would be any risers anywhere within the project. The most likely scenario will
8225 Central Park Drive include running underground conduit from Jones-Butler Road straight to each of the
Suite 100
Waco, Texas 76712 four buildings and having a wall-mounted termination box mounted directly to the
(254) 772-9272
(800) 336-1683
Fax(254)776-2924
www.wallace-group.com
Mr. Ted Mayo, P.E.
April 10, 2000
Page 2
buildings. He further stated that if any above grade riser was needed within the
project, he would coordinate the location with us so that it could be adequately
landscaped and screened to satisfy any City staff concerns. He said that there would
be a high degree of flexibility in the location of any riser that might be needed.
We do not have details and wiring diagrams for the keypad at the entrance gate. The
keypad will be identical to the one installed for Holleman Village Phase I and the
Owner can provide you with catalog cuts if so desired.
We greatly appreciate the staff's assistance and patience on this project. However, it is
paramount that the Developer secures the development permit on or before April 21,
2000 due to agreements with the current property owner. Therefore, we would greatly
appreciate anything that you may be able to do to expedite the final review process and
we would like for you to arrange for a final review meeting either this week or early next
week. Thanks again for your assistance in these matters and please call me if you have
any questions or concerns that can possibly delay the permitting process.
Sincerely,
' 4e
eorge E. "Jed" Walker, Jr., P.E.
The Wallace Group, Inc.
GEW:mn
cc: File - Project # 10994
Natalie Ruiz - City of College Station
Molly Hitchcock - City of College Station
David Wright - Fairfield Residential, Inc.
r
1/18/00 TUE 19:48 FAX 5128336811 WALLACE GROUP AUSTIN
W The
Wallace
Group, Inc.
Engineers ■Architectss Planners ■ Surveyors
DATE:
SUBJECT:
TO: trJ f i Q.QY_
ATTENTION:
t& 0 01
-
FAX COVER SHEET
# Of Pages Including Cover Sheet a2
FAX NUMBER:'
FROM: VjYja PV'0f9jt-
PROJECT NUMBER.
REMAI A5 we d zswa ~
-}n ce)t{ r r--, 1ka we c;~ IcQ vho~
. o~y sr, ~~-Fl o~ >ua Ifs►1~. S' z
ov At-r 4o rxoS o f o e, d-i` 4t-Y4- ,ems L-A- 4-o-2 S u r u a rs
ITI'~el
+ T
1(Z P.oV ke.A F~ e,Q o~ Wi 1 V LOA I ~.e v~-~ "h ~ -111A-
d-LdAta'+ v~ ~YL to 4 W ; l CL
c4-~. Pl-tav, rJ-" +o -t-4, a-~`~
fjuse" laiqcl- +0 w,-e - '-A'~ .
7718 Woodhollow Drive, Suite 100 - Austin, Texas 78731
(512) 833-6828 - Fax (512) 833-6811
E win and - Holleman Arms Ph. 71 Page 1
From: Edwin Hard
To: Jeff Tondre
Subject: Holleman Arms Ph. II
Called Jed Walker this AM. Told him that were concerned about the queue lenght for the
driveway.. particularly in light of the connection to to double tree condo's. Asked Jed to push the driveway
back into the development in order to provide more que.
Jed said he would look at this and see what he could do.
Also told him to more the control box further back on the circle and told him that the lane width arond the
circle would have to be a min. of 20 feet.
We also talked about Ph.'s I and II not having any future access on to JB. He said the reason they haven't
is becasue they didn't have the room to make them gated. I told him they could make them exit only and
thus they wouldn't require much room. Jed said he would look at this as well.
Ed
cc: File 00-20
CC: Natalie Ruiz
~aa-Ibo : ~ ~ ~c~U&-u~
U,-~ C~cCunafali, Rurr~ns~a~s ~ ineecFea° an b~
09~"1 ¢QS6 ~.L(~" pk~ ~Qce RPJ°Iu0
0-0 ~u rich rl~~t vz'ts~Zace
p,!/YY,Xi~SLm')S Ct~r~ ~C- 0~ lJ,cyY~}75yaYJ '.%viy/~6Y Y~
lll~ j m dqoklmoly~ /I 6/YtrA4
aAtC(-~ to
W LO, fit
- ~no~S-h ►cl~ ~Iscav d anucn-