RE: Drainage Letter - J.P. No. 6 Parking Improvements
MDG Job No. 000576-3248
Dear Jeff:
The above referenced project consist of relocating existing parking spaces and constructing a new 35 space
parking lot located at the rear of the existing building. This parking lot will be constructed with standard
concrete curb and gutter with an H.M.A.C. surface with pertinent base and subgrade. The project site is
located at the southwest corner of the intersection of George Bush Drive and Anderson Street. Exhibit # 1-
"Site Plan" is attached for clarification of the parking lot configuration and drainage pattern.
The project site is located adjacent to the Wolf Pen Creek and contains floodplain and floodway as
graphically depicted by F.E.M.A. F.I.R.M. Community Panel No. 48041 CO 144C (July 2, 1992). The site
area, which is located on the College Station ISD property, consists of approximately 1.00 acres. Using the
Rational Method (Q=CIA), the parking lot improvements will create the following runoff increases:
RUNOFF CALCULATIONS
Storm (Yr)
Pre (cfs)
Post (cfs)
Diff. (cfs)
Req'd Detention (ft3)
2
2.552
3.961
1.409
1269
5
3.103
4.817
1.714
1543
10
3.483
5.407
1.924
1732
25
3.977
6.175
2.198
1978
50
4.496
6.980
2.484
2236
100
4.694
7.288
2.594
2334
The policy of the City of College Station is to encourage the rapid conveyance of storm water through and
out of the City within the primary system. Since this project site is located directly adjacent to the Wolf Pen
Creek, being a primary system, no runoff will be detained on the site and the post-development runoff will
discharge directly, without constriction, to the Wolf Pen Creek. This is done in order to keep from stacking
peaks of the primary creek and the discharge of the site runoff.
000576-c.20-67(3248)
Justification of no detention was made by the comparison of time on concentration, (TC) of both
hydrographs. The approximate TC of Wolf Pen creek, to the project site, is approximately twenty minutes.
This TC assumes and average velocity of 3.0 ft/sec and a travel distance of 3600 feet. The minimum TC of
the site allowed without detention is ten minutes. With detention, the TC of the site increases to
approximately twenty minutes. Therefore, detention on-site would increase the overall peak of Wolf Pen
Creek.
In conclusion, the basic design of the drainage improvements will include:
• No on-site detention with direct discharge into Wolf Pen Creek;
Discharge of parking lot runoff through multiple curb leave-outs with drainage flumes;
• Implementation of standard erosion control devices.
Please call me if you have any questions.
Sincerely,
North B. Bardell, Jr., P.E.
C.E.O., Project Manager
ba OF
0,000000,
6 %
9 A
f6ARDELL, JR.
07~oY°JV,~U: .
__..-.TWO°Y~•°~~
60873
~T
g~~'~°°h` tae S
000576-c.20-67(3248)
SECTION #2 (MINOR) - PRE-DEVELOPMENT
GENERAL INFORMATION
Description: Drainage area of site before development.
Drainage Area (APRE) = 1.000 acres
TIME OF CONCENTRATION
GIVEN
Maximum Travel Distance (DPRE) 310 ft
Velocity of Runoff (VPRE) = 0.75 a/sec
Coefficient of Runoff (CPRE) = 0.40
' NOTE: Minimum Tc allowed= 10 min.
2 YEAR FREQUENCY RATE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY, RATE OF DISCHARGE (Q
RESULT
TC(PRE) = 6.9 min.
Rainfall Intensity (12) = 6.327 in /h,
X 2.55-2.
Coefficient (e) =
0.785
Rainfall Intensity (I5) =
7.693 'n /n,
Coefficient (b) =
76
Q6
1:103 cft
Coefficient (d) =
8.5
10 YEAR FREQUENCY,
RATE OF DISCHARGE (Q)
Coefficient (e) =
0.763
Rainfall Intensity (110) =
8.635 in /hr
Coefficient b =
80
Q......
a*- 3 ds:
Coefficient (d) =
8.5
25 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Coefficient (e) = 0.754 Rainfall Intensity (125) = 9.861 'n/,,,
Coefficient (b) = 89 .
~s
Coefficient (d) = 8.5
50 YEAR FREQUENCY, RATE OF DISCHARGE (Q
Coefficient (e) =
0.745
Rainfall Intensity (150) =
11.148 'n/nr
Coefficient b =
98
Q
46
Coefficient (d) =
8.5
100 YEAR FREQUENCY,
RATE OF DISCHARGE (Q)
Coefficient (e) =
0.73
Rainfall Intensity (1100)
11.639 in /hr
Coefficient (b) =
96
Qua.
C94 eIs'
Coefficient (d) =
8
000576-3248 Drainage Calculations. As
SECTION #3 (MINOR) - POST-DEVELOPMENT
GENERAL INFORMATION
Description: Drainage area of site after development
Drainage Area (A1) = 0.380 acres (impervious area)
Drainage Area (A2) = 0.620 acres (landscaped area)
TIME OF CONCENTRATION (T,.)
GIVEN
Maximum Travel Distance (D1) =
230 ft
Velocity of Runoff (V1) =
3.10 ft/See
Coefficient of Runoff (Cl) =
0.90
Maximum Travel Distance (D2) =
160 ft
Velocity of Runoff (V2) =
1.00 ft/See
Coefficient of Runoff (C2) =
0.45
RESULT
Tc1 = 1.2 min.
TC2 = 2.7 min.
""NOTE: Minimum Tc allowed = 10 min.
TC(Posr) = 3.9 min.
2 YEAR FREQUENCY,
RATE OF DISCHARGE (Q)
Rainfall Intensity (12) =
6.327'n/hr
Coefficient (e) =
0.806
QAREA 1 =
2.182 cfs
Coefficient (b) =
65
QAREA 2 =
1.780 cfs
Coefficient (d) =
8
3:9G1 cfs:
5 YEAR FREQUENCY,
RATE OF DISCHARGE (Q)
Rainfall Intensity (15) =
7.693'n/hr
Coefficient (e) =
0.785
QAREA 1 =
2.653 cfs
Coefficient (b) =
76
QAREA 2 =
2.164 cfs
Coefficient (d) =
8.5
Q
4-8 il
10 YEAR FREQUENCY
. RATE OF DISCHARGE (Q)
Rainfall Intensity (110) =
8.635 'n /h,
Coefficient (e) =
0.763
QAREA 1 =
2.978 cfs
Coefficient (b) =
80
QAREA 2 =
2.429 cfs
Coefficient (d) =
8.5
cfs
5 4'b7
25 YEAR FREQUENCY
. RATE OF DISCHARGE (Q)
Rainfall Intensity (125) =
9.861 in/hr
Coefficient (e) =
0.754
QAREA 1 =
3.401 cfs
Coefficient (b) =
89
QAREA 2 =
2.774 cfs
Coefficient (d) =
8.5
xxx.
g
6k175 cfs:
50 YEAR FREQUENCY
. RATE OF DISCHARGE (Q)
Rainfall Intensity (150) =
11.148 in /hr
Coefficient (e) =
0.745
QAREA 1 =
3.844 cfs
Coefficient (b) =
98
QAREA 2 =
3.136 cfs
Coefficient (d) =
8.5
Q«,''. <«;:::::>:::;.<:>>
6.980
clsi;
100 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Rainfall Intensity (1100)
11.639 in /hr
Coefficient (e) =
0.73
QAREA 1 =
4.014 cfs
Coefficient (b) =
96
QAREA 2 =
3.274 cfs
Coefficient (d) =
8
t~=
7288 cft
000576-3248 Drainage Calculations. As
SECTION #4 - HYDROGRAPHS Chart 4
HYDROGRAPHS Chart 4
SECTION #4 - HYDROGRAPHS Chart 5
FIYDROGRAPHS Chart 5
SECTION #4 - HYDROGRAPHS Chart 6
HYDROGRAPHS Chart 6
SECTION #4 - HYDROGRAPHS Chart 7
HYDROGRAPHS Chart 7
SECTION #4 - HYDROGRAPHS Chart 8
50-YEAR HYDROGRAPH
Volume Conveyed' 2,236 ft3
7
f~.
6
ffi::' f•
WOO
015 ~M,
r
5
F{l
i:n. Yf /rf
r:•::y FF:?}~:i.?:!•'•f:ff :;r%/•ffigg
?
+f tivf%f%J"'+{yYf f%ffr:i•':X..
111.
':iii~•':~::i: f~: f:::i'i ::~:~i::::';'~.`::`:fi}i. ~~r~/ ff{ r1 f
44-
u
Me. NMI'
f
V]
.
•:::::F/
Q
.
!F/fii S:
f
.
ff
3
?f
rr
Iii..,.
f~
ff.
.f.....
.
:ff F.:.:•:
.ifs...... .
f
j
~
(
2
F:•
i::i:::::: iiiii:~:::::.;:y;i:;ii:•:
:
f ?...:::::::::is~:::~':"":.i:.:viii:%.'ii:~`:~'`i:~>i
rf~•
f
v
{
{
1
v w::::.,............
'
:v;
iiiiwi'..:.....::.~:Y2T:i:!4i?:::i•i>ii:..;::•ii:??'t:~ii?i?isi:.:k::::::::;::::;;%;;Y;:~:;::::::::
{ .
0
0
10 20 30
TIME
O Post-Development D Pre-Development
(min)
HYDROGR.APHS Chart 8
SECTION #4 - HYDROGRAPHS Chart 9
HYDROGRAPHS Chart 9